W3F1-2020-0062, Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 615 December 2020Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6
ML19175A04211 September 2019Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules
CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 431 January 2019Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4
IR 05000382/201800830 January 2019Errata - Waterford Steam Electric Station, Unit 3 - NRC Problem Identification and Resolution Inspection Report 05000382/2018008 and Notice of Violation
ML18275A20327 December 2018Current Renewed Facility Operating License NPF-38 Attachment 2 and Tech Specs
ML18319A37915 November 2018NRC Problem Identification and Resolution Inspection Report 05000382/2018008 and Notice of Violation
IR 05000382/20170028 August 2017NRC Integrated Inspection Report 05000382/2017002
05000382/LER-2017-0014 May 20171 of 5
LER 17-001-00 for Waterford, Unit 3 Regarding Both Trains of Emergency Core Cooling System Inoperable due to Inadvertently Performing Maintenance on Train 'B' Resulting in Event or Condition that Could Have Prevented Fulfillment of a Safety Function
IR 05000382/201600310 November 2016NRC Integrated Inspection Report 05000382/2016003
05000382/LER-2016-0011 September 2016Incorrect Core Protection Calculator Addressable Constant Entered Because of Inadequate Procedure Resulting in a Condition Prohibited by Technical Specifications
LER 16-001-00 for Waterford, Unit 3, Regarding Incorrect Core Protection Calculator Addressable Constant Entered Because of Inadequate Procedure Resulting in a Condition Prohibited by Technical Specifications
IR 05000382/201500727 May 2015IR 05000382/2015007; on 01/26/2015 - 04/15/2015; Waterford Steam Electric Station, Unit 3; Triennial Fire Protection Team Inspection
ML15147A19227 May 2015IR 05000382/2015007; on 01/26/2015 - 04/15/2015; Waterford Steam Electric Station, Unit 3; Triennial Fire Protection Team Inspection
IR 05000382/201300313 August 2013IR 05000382-13-003; 04/01/2013 - 06/30/2013; Waterford Steam Electric Station, Unit 3, Integrated Resident & Regional Report; Adv. Weather Prot.; Eval of Changes, Test, or Exper & Perm Plant Mods; Refuel. & Other Outage Act.; Pi&R; Other Ac
IR 05000382/201100414 November 2011IR 05000382-11-004, on 07/01/2011 - 09/30/2011, Waterford Steam Electric Station, Unit 3, NRC Integrated Inspection Report
ML11097039821 March 20112011-03-Draft Written Exam
ML1030800084 November 20102010-10-Draft Written Exam
ML0931002576 November 2009IR 05000382-09-008; 12/15/08 - 09/24/09; Waterford Steam Electric Station, Unit 3; Operability Evaluation
W3F1-2009-0047, Notification of Potential Part 21 Re NRC Special Inspection Reportability Position Papers, Waterford Steam Electric Station, Unit 33 September 2009Notification of Potential Part 21 Re NRC Special Inspection Reportability Position Papers, Waterford Steam Electric Station, Unit 3
ML07053007231 December 2006Wat - Init Exam - 11/2006 - Draft Written Exam
ML0635301622 May 2006Initial Exam - 11/2006 - Final RO Written Exam
W3F1-2006-0007, Supplement to Amendment Request NPF-38-262, Steam Generator Tube Inservice Inspection Program15 February 2006Supplement to Amendment Request NPF-38-262, Steam Generator Tube Inservice Inspection Program
ML0604605909 February 2006Request for Relief from the Requirements of the American Society of Mechanical Engineered (ASME) Boiler and Vessel Code (Code)
CNRO-2005-00053, Request WF3-R&R-004, Request to Deviate from Provision of ASME Code Case N-523-216 September 2005Request WF3-R&R-004, Request to Deviate from Provision of ASME Code Case N-523-2
IR 05000382/200400229 March 2004IR 05000382-04-002, on 01/01-03/23/2004; Waterford Steam Electric Station, Unit 3; Equipment Alignment, Operability Evaluations, Identification and Resolution of Problems
W3F1-2002-0102, Supplemental to License Amendment Request NPF-38-242 Technical Specification Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement Process19 December 2002Supplemental to License Amendment Request NPF-38-242 Technical Specification Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement Process
W3F1-2002-0073, Application for Technical Specification Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement Process19 August 2002Application for Technical Specification Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement Process
IR 05000382/19990078 September 1999Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations
ML20199H80630 January 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/97-21 Issued on 971202.Corrective Actions Will Be Examined During Future Inspections
ML20198T25922 January 1998Responds to Violations Noted in Insp Rept 50-382/97-21. Corrective Actions:Initiated Technical Requirements Manual Change Request 98-001 & Reviewed & Discussed Event to Accentuate Importance of Action Item Tracking & Completion
IR 05000382/199701617 October 1997Insp Rept 50-382/97-16 on 970810-0920.Violations Noted: Major Areas Inspected:Operations,Maint,Engineering & Plant Support
IR 05000382/199620213 December 1996Insp Rept 50-382/96-202 on 960923-1010.No Violations Noted. Major Areas Inspected:Engineering
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly5 August 1996Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly
ML20058K5968 December 1993Forwards Tia,Interpretation of Reporting Requirements - 93TIA006,re Multiple Failures of safety-related Components
ML19351A40616 October 1989Special Rept SR-89-002-00:on 890930,video Scan of Steam Generator 1 Tubesheet Indicated Presence of Foreign Object Lodged in Tube.Object Identified as Calibr Tube Pressure Cap.Caused by Inadequate Corrective Action
W3P88-1212, Application for Amend to License NPF-38,consisting of Tech Spec Change Request NPF-38-81,revising Number of Fans Which Must Be Operable in Tech Spec 3.6.2.2, Containment Cooling Sys. Fee Paid31 May 1988Application for Amend to License NPF-38,consisting of Tech Spec Change Request NPF-38-81,revising Number of Fans Which Must Be Operable in Tech Spec 3.6.2.2, Containment Cooling Sys. Fee Paid
W3P88-1213, Requests Temporary Waiver of Compliance W/Tech Spec 3.6.2.2 Re Containment Cooling Fans Which Need to Be Operable in Modes 1-4.Tech Spec Change Request Revises Tech Spec 3.6.2.2 to Allow Only Two Fans to Be Operable During Modes 1-431 May 1988Requests Temporary Waiver of Compliance W/Tech Spec 3.6.2.2 Re Containment Cooling Fans Which Need to Be Operable in Modes 1-4.Tech Spec Change Request Revises Tech Spec 3.6.2.2 to Allow Only Two Fans to Be Operable During Modes 1-4
ML20132B69716 July 1985Response to Notice of Violation & Proposed Imposition of Civil Penalties EA 85-10
ML19309B89731 March 1980Final Deficiency Rept Re Noncompliance to Welding Requirements for Heating,Ventilation & Air Conditioning Seismic Support Hanger to Embedded Plates.All Affected Welds Repaired & Insps Documented for QA Files
ML19323D52931 March 1980Final Rept of Significant Const Deficiency 9,re Welding of Heating,Ventilation & Air Conditioning Seismic Support Hangers to Embedded Plates.Caused by Engineering Error. Contractor Initiated Repairs for Hanger to Embedded Plates
ML20064D24729 September 1978Interim Rept of Significant Deficiency 9 Re Noncompliance W/ Weld Requirements for HVAC Seismic Support Hangers to Embedded Plates & Lack of Preheating