Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
W3F1-2020-0062, Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 | 15 December 2020 | Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 |
ML19175A042 | 11 September 2019 | Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules |
CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 | 31 January 2019 | Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 |
IR 05000382/2018008 | 30 January 2019 | Errata - Waterford Steam Electric Station, Unit 3 - NRC Problem Identification and Resolution Inspection Report 05000382/2018008 and Notice of Violation |
ML18275A203 | 27 December 2018 | Current Renewed Facility Operating License NPF-38 Attachment 2 and Tech Specs |
ML18319A379 | 15 November 2018 | NRC Problem Identification and Resolution Inspection Report 05000382/2018008 and Notice of Violation |
IR 05000382/2017002 | 8 August 2017 | NRC Integrated Inspection Report 05000382/2017002 |
05000382/LER-2017-001 | 4 May 2017 | 1 of 5 LER 17-001-00 for Waterford, Unit 3 Regarding Both Trains of Emergency Core Cooling System Inoperable due to Inadvertently Performing Maintenance on Train 'B' Resulting in Event or Condition that Could Have Prevented Fulfillment of a Safety Function |
IR 05000382/2016003 | 10 November 2016 | NRC Integrated Inspection Report 05000382/2016003 |
05000382/LER-2016-001 | 1 September 2016 | Incorrect Core Protection Calculator Addressable Constant Entered Because of Inadequate Procedure Resulting in a Condition Prohibited by Technical Specifications LER 16-001-00 for Waterford, Unit 3, Regarding Incorrect Core Protection Calculator Addressable Constant Entered Because of Inadequate Procedure Resulting in a Condition Prohibited by Technical Specifications |
IR 05000382/2015007 | 27 May 2015 | IR 05000382/2015007; on 01/26/2015 - 04/15/2015; Waterford Steam Electric Station, Unit 3; Triennial Fire Protection Team Inspection |
ML15147A192 | 27 May 2015 | IR 05000382/2015007; on 01/26/2015 - 04/15/2015; Waterford Steam Electric Station, Unit 3; Triennial Fire Protection Team Inspection |
IR 05000382/2013003 | 13 August 2013 | IR 05000382-13-003; 04/01/2013 - 06/30/2013; Waterford Steam Electric Station, Unit 3, Integrated Resident & Regional Report; Adv. Weather Prot.; Eval of Changes, Test, or Exper & Perm Plant Mods; Refuel. & Other Outage Act.; Pi&R; Other Ac |
IR 05000382/2011004 | 14 November 2011 | IR 05000382-11-004, on 07/01/2011 - 09/30/2011, Waterford Steam Electric Station, Unit 3, NRC Integrated Inspection Report |
ML110970398 | 21 March 2011 | 2011-03-Draft Written Exam |
ML103080008 | 4 November 2010 | 2010-10-Draft Written Exam |
ML093100257 | 6 November 2009 | IR 05000382-09-008; 12/15/08 - 09/24/09; Waterford Steam Electric Station, Unit 3; Operability Evaluation |
W3F1-2009-0047, Notification of Potential Part 21 Re NRC Special Inspection Reportability Position Papers, Waterford Steam Electric Station, Unit 3 | 3 September 2009 | Notification of Potential Part 21 Re NRC Special Inspection Reportability Position Papers, Waterford Steam Electric Station, Unit 3 |
ML070530072 | 31 December 2006 | Wat - Init Exam - 11/2006 - Draft Written Exam |
ML063530162 | 2 May 2006 | Initial Exam - 11/2006 - Final RO Written Exam |
W3F1-2006-0007, Supplement to Amendment Request NPF-38-262, Steam Generator Tube Inservice Inspection Program | 15 February 2006 | Supplement to Amendment Request NPF-38-262, Steam Generator Tube Inservice Inspection Program |
ML060460590 | 9 February 2006 | Request for Relief from the Requirements of the American Society of Mechanical Engineered (ASME) Boiler and Vessel Code (Code) |
CNRO-2005-00053, Request WF3-R&R-004, Request to Deviate from Provision of ASME Code Case N-523-2 | 16 September 2005 | Request WF3-R&R-004, Request to Deviate from Provision of ASME Code Case N-523-2 |
IR 05000382/2004002 | 29 March 2004 | IR 05000382-04-002, on 01/01-03/23/2004; Waterford Steam Electric Station, Unit 3; Equipment Alignment, Operability Evaluations, Identification and Resolution of Problems |
W3F1-2002-0102, Supplemental to License Amendment Request NPF-38-242 Technical Specification Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement Process | 19 December 2002 | Supplemental to License Amendment Request NPF-38-242 Technical Specification Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement Process |
W3F1-2002-0073, Application for Technical Specification Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement Process | 19 August 2002 | Application for Technical Specification Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement Process |
IR 05000382/1999007 | 8 September 1999 | Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations |
ML20199H806 | 30 January 1998 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/97-21 Issued on 971202.Corrective Actions Will Be Examined During Future Inspections |
ML20198T259 | 22 January 1998 | Responds to Violations Noted in Insp Rept 50-382/97-21. Corrective Actions:Initiated Technical Requirements Manual Change Request 98-001 & Reviewed & Discussed Event to Accentuate Importance of Action Item Tracking & Completion |
IR 05000382/1997016 | 17 October 1997 | Insp Rept 50-382/97-16 on 970810-0920.Violations Noted: Major Areas Inspected:Operations,Maint,Engineering & Plant Support |
IR 05000382/1996202 | 13 December 1996 | Insp Rept 50-382/96-202 on 960923-1010.No Violations Noted. Major Areas Inspected:Engineering |
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly | 5 August 1996 | Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly |
ML20058K596 | 8 December 1993 | Forwards Tia,Interpretation of Reporting Requirements - 93TIA006,re Multiple Failures of safety-related Components |
ML19351A406 | 16 October 1989 | Special Rept SR-89-002-00:on 890930,video Scan of Steam Generator 1 Tubesheet Indicated Presence of Foreign Object Lodged in Tube.Object Identified as Calibr Tube Pressure Cap.Caused by Inadequate Corrective Action |
W3P88-1212, Application for Amend to License NPF-38,consisting of Tech Spec Change Request NPF-38-81,revising Number of Fans Which Must Be Operable in Tech Spec 3.6.2.2, Containment Cooling Sys. Fee Paid | 31 May 1988 | Application for Amend to License NPF-38,consisting of Tech Spec Change Request NPF-38-81,revising Number of Fans Which Must Be Operable in Tech Spec 3.6.2.2, Containment Cooling Sys. Fee Paid |
W3P88-1213, Requests Temporary Waiver of Compliance W/Tech Spec 3.6.2.2 Re Containment Cooling Fans Which Need to Be Operable in Modes 1-4.Tech Spec Change Request Revises Tech Spec 3.6.2.2 to Allow Only Two Fans to Be Operable During Modes 1-4 | 31 May 1988 | Requests Temporary Waiver of Compliance W/Tech Spec 3.6.2.2 Re Containment Cooling Fans Which Need to Be Operable in Modes 1-4.Tech Spec Change Request Revises Tech Spec 3.6.2.2 to Allow Only Two Fans to Be Operable During Modes 1-4 |
ML20132B697 | 16 July 1985 | Response to Notice of Violation & Proposed Imposition of Civil Penalties EA 85-10 |
ML19309B897 | 31 March 1980 | Final Deficiency Rept Re Noncompliance to Welding Requirements for Heating,Ventilation & Air Conditioning Seismic Support Hanger to Embedded Plates.All Affected Welds Repaired & Insps Documented for QA Files |
ML19323D529 | 31 March 1980 | Final Rept of Significant Const Deficiency 9,re Welding of Heating,Ventilation & Air Conditioning Seismic Support Hangers to Embedded Plates.Caused by Engineering Error. Contractor Initiated Repairs for Hanger to Embedded Plates |
ML20064D247 | 29 September 1978 | Interim Rept of Significant Deficiency 9 Re Noncompliance W/ Weld Requirements for HVAC Seismic Support Hangers to Embedded Plates & Lack of Preheating |