Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23334A23430 November 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation
ML21106A2794 May 2021Technical Specifications
ML20114E26612 May 2020Final ASP Analysis - Surry 1 and 2 (LER 280-01-001)
ML19249B77429 August 2019Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated)
ML19249B77229 August 2019Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated)
ML19249B76829 August 2019Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated)
ML19011A1744 January 2019Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents
ML19011A1734 January 2019Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents
ML19011A1724 January 2019Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up)
ML18169A22913 June 2018Attachment 5 - Proposed SPS Emergency Plan Changes
ML18169A22613 June 2018Attachment 1 - Response to Request for Additional Information
ML18169A22713 June 2018Attachment 3 - Proposed NAPS Emergency Plan Changes
ML18169A22813 June 2018Attachment 4 - Marked-Up SPS Emergency Plan Changes
ML18025B48816 January 2018Attachments 1 to 4: Proposed Consolidated Emergency Operations Facility
ML18025B49116 January 2018Attachments 5 and 6: North Anna - Proposed Changed to Emergency Plan Pages and Marked-Up SPS Emergency Plan Page Changes
ML18025B49316 January 2018Attachments 7 & 8: Surry - Proposed Changed SPS Emergency Plan Pages and Offsite Response Agency Letters of Concurrence
ML17354B29520 December 2017281/2017-301 Final SRO Written Exam - Delay Release 2 Yrs
ML16089A23922 March 2016301 Draft SRO Written Exam
ML15021A30714 January 2015(SPS) Units 1, 2 and ISFSIs - Revisions to North Anna and Surry Power Station Emergency Plans
ML14219A7487 August 2014301 SRO Final Exam with Key
ML10278032314 September 2010Initial Exam 2010-301 Other Documents for Retention
ML10231011916 August 2010Initial Exam 2010-301 Final SRO Written Exam
ML09226018628 July 2009Initial Exam 2009-301 Final RO Written Exam
ML0712402633 May 2007Technical Specifications, Issuance of Amendments Regarding Missed Surveillance Requirements TSTF-358 (TAC Nos. MD4206 & MD4207)
ML07032017831 January 2007Proposed Technical Specifications Change Missed Surveillance Requirements
IR 05000280/200601025 July 2006EA-06-071, Surry, Final Significance Determination for a White Finding & Notice of Violation (Surry Power Station - NRC Inspection Report Nos. 05000280-06-010, 05000281-06-010)
IR 05000280/200500421 October 2005IR 05000280-05-004, IR 05000281-05-004, on 09/30/2005, for Surry Power Station, Units 1 and 2, Maintenance Effectiveness
ML04029012421 January 2004ISFSI - Revision 47 to the Emergency Plan
ML18152B41818 May 1999LER 99-002-00:on 990425,MSSVs Tested Out of Tolerance for as Found Setpoint.Caused by Minor Setpoint Drift.No Immediate Action Required.Deviation Rept Submitted for Each Valve.With 990518 Ltr
ML18153A12815 April 1997LER 97-004-00:on 970317,main Steam Safety Valve Was Outside as Found Setpoint Tolerance.Specific Cause Unknown,However, Minor Setpoint Drift Can Be Expected.No Immediate Corrective Actions performed.W/970415 Ltr
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly5 August 1996Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly
ML18153A65317 October 1995LER 95-008-00:on 950919,pressurizer Safety Valve Found Setpoint Out of Tolerance.Caused by Psvs Being Installed Prior to Start of Most Recent Operating cycle.W/951018 Ltr
ML18153A86030 June 1995LER 95-005-00:on 950531,review Identified Min Value Speed Used in Periodic Test Procedures Incorrect.Caused by Cognitive Personnel Error.Cat Level Verified in Compliance W/Revised Calculated Min Level of 98.4%.W/950630 Ltr
ML18152A54421 April 1995LER 95-003-01:on 950210, as Found Calibration Test Data for Three RPS Transmitters Not within Allowable Tolerance. Caused by Calibration W/O Accounting for sub-atmospheric Conditions.Pressure Gauge replaced.W/950421 Ltr
ML18153B26424 March 1995LER 95-003-00:on 950224, as Found Calibration Test Data for Three RPS Transmitters Not within Allowable Tolerance. Caused by Faulty Pressure Gauge Used in Calibration.Pressure Gauge Replaced & Repeated Calibration check.W/950324 Ltr
ML18153B2499 March 1995LER 95-002-00:on 950210,lift Settings for Two MSSVs & Two Psvs Found to Be Outside as Found Range Allowed by TSs 3.6.A & 3.1.A.3.b.Caused by Setpoint Drift.Safety Valves Repaired & readjusted.W/950309 Ltr
ML18153A94011 May 1994NPDES Noncompliance Notification:On 940509,oil Sheen Observed in Plant Discharge Canal.Hydrostatic Testing of Supply Lines to EDG Indicates Existence of Leak in One Line. Leaking Suppl Line Isolated Until Corrections Can Be Made
ML18153B43627 December 1993Submits follow-up to Telephone Notification of Oil Discharge Rept 94-1332.On 931220,oil Found at Permanent Oil Boom in Discharge Canal
ML18153C86230 December 1991LER 91-022-00:on 911204 Discovered That Containment Spray Pumps Had Not Been Demonstrated Operable Between 910101 & 0514,exceeding 92 Day Interval Between Surveillance Tests. Caused by Personnel Error.Task Team formed.W/911230 Ltr
ML18153C34124 August 1990LER 89-019-01:on 891122,noted That Flood Protection Dikes Removed from One Side of Valve Pits for Svc Water Supply motor-operated Valves to Recirculation Spray Hxs.Caused by Personnel Error.Flood Dikes reinstalled.W/900824 Ltr
ML18153C26121 June 1990Responds to NRC 900522 Ltr Re Violations Noted in Insp Repts 50-280/90-07 & 50-281/90-07.Corrective actions:as-built Configurations of 120-volt Ac & Dc Vital & Semivital Panel Breaker Installations Verified to Be Acceptable
ML18153B76814 June 1989LER 89-020-00:on 890515,determined That Leakage Current in Cables Mfg by Continental Cable Excessive.Caused by Calculation Error Since Total Loop Errors Was Not Considered.Review of Loops initiated.W/890614 Ltr
ML18153B5689 January 1989LER 88-025-00:on 881208,determined That Power Supplies for Two Safety Injection Valve Operators Reversed.Caused by Error During Initial Plant Const.Engineering Work Request Issued to Correct as-found conditions.W/890109 Ltr
ML20041F9318 March 1982LER 82-029/01T-0:on 820222,steam Line Flow Instruments for a Main Steam Line,Channels 3 & 4, & B Main Steam Line,Channel 3,reported Inoperable During Startup.Caused by Lack of Power Supply Fuses to Transmitters.Fuses Replaced
ML18139B21527 March 1981Updated LER 80-020/01X-1:on 800310,heat Tracing Circuits 24A,B & C for Unit Boric Acid Filter Sys Found Tagged Out of Svc Since 800211,during Review of Penetrant Test 27B.Caused by Error During Maint on Unit 1 Drain Line