Issue date | Title | |
---|---|---|
ML23334A234 | 30 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation |
ML21106A279 | 4 May 2021 | Technical Specifications |
ML20114E266 | 12 May 2020 | Final ASP Analysis - Surry 1 and 2 (LER 280-01-001) |
ML19249B774 | 29 August 2019 | Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) |
ML19249B772 | 29 August 2019 | Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) |
ML19249B768 | 29 August 2019 | Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) |
ML19011A174 | 4 January 2019 | Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents |
ML19011A173 | 4 January 2019 | Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents |
ML19011A172 | 4 January 2019 | Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up) |
ML18169A229 | 13 June 2018 | Attachment 5 - Proposed SPS Emergency Plan Changes |
ML18169A226 | 13 June 2018 | Attachment 1 - Response to Request for Additional Information |
ML18169A227 | 13 June 2018 | Attachment 3 - Proposed NAPS Emergency Plan Changes |
ML18169A228 | 13 June 2018 | Attachment 4 - Marked-Up SPS Emergency Plan Changes |
ML18025B488 | 16 January 2018 | Attachments 1 to 4: Proposed Consolidated Emergency Operations Facility |
ML18025B491 | 16 January 2018 | Attachments 5 and 6: North Anna - Proposed Changed to Emergency Plan Pages and Marked-Up SPS Emergency Plan Page Changes |
ML18025B493 | 16 January 2018 | Attachments 7 & 8: Surry - Proposed Changed SPS Emergency Plan Pages and Offsite Response Agency Letters of Concurrence |
ML17354B295 | 20 December 2017 | 281/2017-301 Final SRO Written Exam - Delay Release 2 Yrs |
ML16089A239 | 22 March 2016 | 301 Draft SRO Written Exam |
ML15021A307 | 14 January 2015 | (SPS) Units 1, 2 and ISFSIs - Revisions to North Anna and Surry Power Station Emergency Plans |
ML14219A748 | 7 August 2014 | 301 SRO Final Exam with Key |
ML102780323 | 14 September 2010 | Initial Exam 2010-301 Other Documents for Retention |
ML102310119 | 16 August 2010 | Initial Exam 2010-301 Final SRO Written Exam |
ML092260186 | 28 July 2009 | Initial Exam 2009-301 Final RO Written Exam |
ML071240263 | 3 May 2007 | Technical Specifications, Issuance of Amendments Regarding Missed Surveillance Requirements TSTF-358 (TAC Nos. MD4206 & MD4207) |
ML070320178 | 31 January 2007 | Proposed Technical Specifications Change Missed Surveillance Requirements |
IR 05000280/2006010 | 25 July 2006 | EA-06-071, Surry, Final Significance Determination for a White Finding & Notice of Violation (Surry Power Station - NRC Inspection Report Nos. 05000280-06-010, 05000281-06-010) |
IR 05000280/2005004 | 21 October 2005 | IR 05000280-05-004, IR 05000281-05-004, on 09/30/2005, for Surry Power Station, Units 1 and 2, Maintenance Effectiveness |
ML040290124 | 21 January 2004 | ISFSI - Revision 47 to the Emergency Plan |
ML18152B418 | 18 May 1999 | LER 99-002-00:on 990425,MSSVs Tested Out of Tolerance for as Found Setpoint.Caused by Minor Setpoint Drift.No Immediate Action Required.Deviation Rept Submitted for Each Valve.With 990518 Ltr |
ML18153A128 | 15 April 1997 | LER 97-004-00:on 970317,main Steam Safety Valve Was Outside as Found Setpoint Tolerance.Specific Cause Unknown,However, Minor Setpoint Drift Can Be Expected.No Immediate Corrective Actions performed.W/970415 Ltr |
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly | 5 August 1996 | Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly |
ML18153A653 | 17 October 1995 | LER 95-008-00:on 950919,pressurizer Safety Valve Found Setpoint Out of Tolerance.Caused by Psvs Being Installed Prior to Start of Most Recent Operating cycle.W/951018 Ltr |
ML18153A860 | 30 June 1995 | LER 95-005-00:on 950531,review Identified Min Value Speed Used in Periodic Test Procedures Incorrect.Caused by Cognitive Personnel Error.Cat Level Verified in Compliance W/Revised Calculated Min Level of 98.4%.W/950630 Ltr |
ML18152A544 | 21 April 1995 | LER 95-003-01:on 950210, as Found Calibration Test Data for Three RPS Transmitters Not within Allowable Tolerance. Caused by Calibration W/O Accounting for sub-atmospheric Conditions.Pressure Gauge replaced.W/950421 Ltr |
ML18153B264 | 24 March 1995 | LER 95-003-00:on 950224, as Found Calibration Test Data for Three RPS Transmitters Not within Allowable Tolerance. Caused by Faulty Pressure Gauge Used in Calibration.Pressure Gauge Replaced & Repeated Calibration check.W/950324 Ltr |
ML18153B249 | 9 March 1995 | LER 95-002-00:on 950210,lift Settings for Two MSSVs & Two Psvs Found to Be Outside as Found Range Allowed by TSs 3.6.A & 3.1.A.3.b.Caused by Setpoint Drift.Safety Valves Repaired & readjusted.W/950309 Ltr |
ML18153A940 | 11 May 1994 | NPDES Noncompliance Notification:On 940509,oil Sheen Observed in Plant Discharge Canal.Hydrostatic Testing of Supply Lines to EDG Indicates Existence of Leak in One Line. Leaking Suppl Line Isolated Until Corrections Can Be Made |
ML18153B436 | 27 December 1993 | Submits follow-up to Telephone Notification of Oil Discharge Rept 94-1332.On 931220,oil Found at Permanent Oil Boom in Discharge Canal |
ML18153C862 | 30 December 1991 | LER 91-022-00:on 911204 Discovered That Containment Spray Pumps Had Not Been Demonstrated Operable Between 910101 & 0514,exceeding 92 Day Interval Between Surveillance Tests. Caused by Personnel Error.Task Team formed.W/911230 Ltr |
ML18153C341 | 24 August 1990 | LER 89-019-01:on 891122,noted That Flood Protection Dikes Removed from One Side of Valve Pits for Svc Water Supply motor-operated Valves to Recirculation Spray Hxs.Caused by Personnel Error.Flood Dikes reinstalled.W/900824 Ltr |
ML18153C261 | 21 June 1990 | Responds to NRC 900522 Ltr Re Violations Noted in Insp Repts 50-280/90-07 & 50-281/90-07.Corrective actions:as-built Configurations of 120-volt Ac & Dc Vital & Semivital Panel Breaker Installations Verified to Be Acceptable |
ML18153B768 | 14 June 1989 | LER 89-020-00:on 890515,determined That Leakage Current in Cables Mfg by Continental Cable Excessive.Caused by Calculation Error Since Total Loop Errors Was Not Considered.Review of Loops initiated.W/890614 Ltr |
ML18153B568 | 9 January 1989 | LER 88-025-00:on 881208,determined That Power Supplies for Two Safety Injection Valve Operators Reversed.Caused by Error During Initial Plant Const.Engineering Work Request Issued to Correct as-found conditions.W/890109 Ltr |
ML20041F931 | 8 March 1982 | LER 82-029/01T-0:on 820222,steam Line Flow Instruments for a Main Steam Line,Channels 3 & 4, & B Main Steam Line,Channel 3,reported Inoperable During Startup.Caused by Lack of Power Supply Fuses to Transmitters.Fuses Replaced |
ML18139B215 | 27 March 1981 | Updated LER 80-020/01X-1:on 800310,heat Tracing Circuits 24A,B & C for Unit Boric Acid Filter Sys Found Tagged Out of Svc Since 800211,during Review of Penetrant Test 27B.Caused by Error During Maint on Unit 1 Drain Line |