Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23275A115 | 2 October 2023 | Improved Technical Specifications Conversion, Section 3.0, LCO and SR Applicability, Revision 2 - Volume 5 |
IR 05000335/2021003 | 3 November 2021 | Integrated Inspection Report 05000335/2021003 and 05000389/2021003 |
ML21265A290 | 15 September 2021 | Enclosure 2 - Volume 5 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.0 LCO and SR Applicability, Revision 0 |
ML21034A519 | 3 February 2021 | 1A -PSL L-20-1 RO and SRO Student Exam Final as Given with Key |
L-2019-111, Attachments 1 Through 5: Evaluation of Proposed Changes, EAL Technical Bases Document, Mark-Up of EAL, EAL Comparison Matrix and Emergency Action Level Matrix Wall Charts | 30 September 2019 | Attachments 1 Through 5: Evaluation of Proposed Changes, EAL Technical Bases Document, Mark-Up of EAL, EAL Comparison Matrix and Emergency Action Level Matrix Wall Charts |
ML19148A744 | 31 July 2019 | Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 |
L-2019-034, In-Service Inspection Plans Fourth Ten-Year Interval: Unit 1 Relief Requests 15 and 16 | 7 February 2019 | In-Service Inspection Plans Fourth Ten-Year Interval: Unit 1 Relief Requests 15 and 16 |
L-2018-049, Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications | 29 May 2018 | Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications |
ML18150A482 | 23 April 2018 | NRR E-mail Capture - (External_Sender) LCO 3.0.6 LAR Pre-submittal Call |
ML17027A078 | 7 April 2017 | Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) |
ML16214A276 | 28 July 2016 | NextEra Energy Resources, LLC, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to t |
IR 05000335/2015002 | 4 August 2015 | IR 05000335/2015002, 05000389/2015002 & 05000335/2015011, 05000389/2015011; Assessment Follow-up Letter; 04/01/2015 -06/30/2015; St. Lucie Nuclear Plant, Units 1 & 2; Follow-up of Events and Notice of Enforcement Discretion; Radioactive Gas |
ML15097A267 | 7 April 2015 | 301 Final SRO Written Exam |
ML14343A918 | 27 February 2015 | Issuance of Amendments to Revise Limiting Condition for Operation 3.0.4 and Surveillance Requirement 4.0.4 |
L-2014-239, Units I and 2, Clarification Regarding License Amendment Request for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process - | 25 July 2014 | Units I and 2, Clarification Regarding License Amendment Request for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process - |
L-2014-207, Inservice Inspection Plan Third Ten-Year Interval Unit 2 Relief Request No. 16 | 30 June 2014 | Inservice Inspection Plan Third Ten-Year Interval Unit 2 Relief Request No. 16 |
L-2014-144, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | 29 May 2014 | Response to Request for Additional Information (RAI) Regarding License Amendment Request for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process |
L-2013-233, Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | 26 February 2014 | Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process |
ML13018A013 | 18 January 2013 | Initial Exam 2012-301 Post Exam Comments |
L-2012-427, Q4116-R-002, Rev. 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Force Recommendation 2.3: Seismic | 30 November 2012 | Q4116-R-002, Rev. 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Force Recommendation 2.3: Seismic |
IR 05000335/2010004 | 29 October 2010 | IR 05000335-10-004, 05000389-10-004; 07/01/2010-09/30/2010; St. Lucie Nuclear Plant, Units 1 & 2; Equipment Alignment, Identification and Resolution of Problems Other Activities |
L-2009-169, Response to Request for Additional Information, Third Interval Relief Request 32 | 20 July 2009 | Response to Request for Additional Information, Third Interval Relief Request 32 |
L-2009-035, Third Interval Relief Requests 31 and 32 | 6 February 2009 | Third Interval Relief Requests 31 and 32 |
IR 05000335/2007004 | 23 October 2007 | IR 05000335-07-004 & IR 05000389-07-004, on 07/01/2007 - 09/30/2007, St. Lucie Nuclear Plant, Units 1 & 2; Event Followup |
L-2007-147, Comment (11) of D. E. Grissette, on Behalf of Florida Power & Light Company on Draft Regulatory Guide DG-5019, Reporting of Safeguards Events. | 1 October 2007 | Comment (11) of D. E. Grissette, on Behalf of Florida Power & Light Company on Draft Regulatory Guide DG-5019, Reporting of Safeguards Events. |
L-2004-180, in Service Inspection Plan, Closeout of Second Ten-Year Interval, Revised Relief Requests 1A and 1OA | 6 August 2004 | in Service Inspection Plan, Closeout of Second Ten-Year Interval, Revised Relief Requests 1A and 1OA |
ML052790654 | 2 October 2003 | Current Facility Operating License DPR-067, Tech Specs, Revised 01/31/2020 |
ML032731661 | 2 October 2003 | DPR-67 Appendix a |
ML032800846 | 2 October 2003 | NPF-16 Appendix a |
ML023090371 | 4 November 2002 | Technical Specification Pages for Amendments 186 and 129 Regarding Missed Surveillances |
L-2002-117, to Proposed License Amendments Re Consolidated Line Item Improvement Process from Florida Power & Light Company | 15 August 2002 | to Proposed License Amendments Re Consolidated Line Item Improvement Process from Florida Power & Light Company |
IR 05000335/2002002 | 29 July 2002 | IR 05000335-02-002, IR 05000389-02-002, on 06/29/02 for Florida Power & Light Company, St. Lucie Plant, Units 1 & 2. Resident Integrated Inspection Report |
L-2002-002, Florida Power and Light Letter Re St. Lucie Units 1 and 2, Proposed License Amendments - Supplement Consolidated Line Item Improvement Process TSTF-358 - Missed Surveillance Requirements | 25 January 2002 | Florida Power and Light Letter Re St. Lucie Units 1 and 2, Proposed License Amendments - Supplement Consolidated Line Item Improvement Process TSTF-358 - Missed Surveillance Requirements |
ML17229B079 | 7 April 1999 | LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr |
ML17309A972 | 11 February 1999 | Requests Approval of Revised Relief Requests 1 & 4 & New Relief Requests 21 & 22 as Part of Closeout of Second ten-yr ISI Interval for St Lucie,Unit 1.Subject Relief Requests Encl |
L-98-104, Responds to Violations Noted in Insp Rept 50-335/97-16. Corrective Actions:Performed Review of Remaining Setpoints for Rps,Afas & ESFAS Which Concluded Setpoints & Loop Calibrations Meet TS Requirements & Revised Procedures | 20 April 1998 | Responds to Violations Noted in Insp Rept 50-335/97-16. Corrective Actions:Performed Review of Remaining Setpoints for Rps,Afas & ESFAS Which Concluded Setpoints & Loop Calibrations Meet TS Requirements & Revised Procedures |
ML17229A673 | 26 March 1998 | LER 98-002-00:on 980224,radiation Monitor Surveillance Inadequacies Led to Operating of Facility Prohibited by Tss. Caused by Congnitive Personnel Error.Permanent Procedure Changes Were implemented.W/980326 Ltr |
ML17229A375 | 2 June 1997 | LER 97-006-00:on 970501,operation Was Prohibited by TS Due to Inadequately Tested Degraded Voltage Sys.Revised Unit 1 ESFAS Surveillance Test procedure.W/970602 Ltr |
ML17229A193 | 9 January 1997 | LER 96-007-00:on 961211,operation Prohibited by TSs Occurred Due to Inadequate Surveillance of MSIS Actuation Logic. Testing of MSIS High Containment Pressure 2/4 Actuation Logic Was Satisfactorily Performed on 961211.W/970109 Ltr |
L-96-296, LER 96-S02-00:on 961011,failed to Terminate Access of Temporary Licensee Employee.Caused by Cognitive Personnel Error.Security Unassigned Card Key & Plant Administrative Procedure 0010509 Revised | 7 November 1996 | LER 96-S02-00:on 961011,failed to Terminate Access of Temporary Licensee Employee.Caused by Cognitive Personnel Error.Security Unassigned Card Key & Plant Administrative Procedure 0010509 Revised |
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly | 5 August 1996 | Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly |
ML20137N791 | 28 June 1996 | Scoping Document for Implementation of Maint Rule for Monitoring Effectiveness of Maint on Structures |
ML20137M416 | 21 December 1995 | Independent Assessment of Maint Rule Implementation at Plant, 951211-15 |
ML17228B309 | 30 October 1995 | LER 95-004-00:on 951010,RCS Instrument Nozzle Leakage Occurred.Caused by Primary Water Stress Corrosion Cracking. Completed Visual Insp of Other RCS Instrument Nozzles. W/951030 Ltr |
L-94-016, Forwards Safeguards Event Log Entries for Fourth Quarter 1993.Log Does Not Contain Safeguards Info as Defined by 10CFR73.21 | 25 January 1994 | Forwards Safeguards Event Log Entries for Fourth Quarter 1993.Log Does Not Contain Safeguards Info as Defined by 10CFR73.21 |
ML17223A324 | 13 September 1989 | LER 89-006-00:on 890816,diesel Generator 2B Placed Out of Svc W/Hydrogen Analyzer 2A Also Out of Svc.Caused by Cognitive Personnel Error by util-licensed Operator. Generator & Analyzer Returned to svc.W/890913 Ltr |
ML17222A492 | 15 September 1988 | LER 87-018-00:on 870131,util Identified That Specific Masonry Block Walls Which Were Assumed to Be 3 H Fire Barriers May Not Have Been Completely Filled W/Grout.Caused by Const Practices.Fire Watch established.W/880915 Ltr |
ML17221A686 | 19 March 1988 | LER 88-002-00:on 880218,reactor Containment Bldg Polar Crane Power Supply Breaker Found in Tagged Open Position.Caused by Personnel Error.Reactor Containment Bldg Polar Crane Power Supply Breaker Locked open.W/880321 Ltr |
ML17221A497 | 6 November 1987 | LER 87-014-00:on 871008,unidentified RCS Leakage Greater than Tech Spec Limit Discovered.Caused by Weld Joint Failure Due to Previous Misalignment of Listed Flanges.Reactor Shut Down & Required Repairs performed.W/871106 Ltr |
ML17216A488 | 10 April 1986 | LER 86-006-00:on 860312,both Emergency Diesel Generators Out of Svc.Caused by Damaged Idler Pulley Wheel & Loose Locknut in Friction Clutch Assembly.Generators Repaired & Remaining Generators inspected.W/860410 Ltr |