 Issue dateTitle
ML23310A03213 November 2023Integrated Inspection Report 05000458/2023003
IR 05000458/202300313 November 2023Integrated Inspection Report 05000458/2023003
RBG-48148, 2021 Annual Radiological Environmental Operating Report27 April 20222021 Annual Radiological Environmental Operating Report
RBG-48093, Corrected 2020 Annual Radiological Environmental Operating Report20 May 2021Corrected 2020 Annual Radiological Environmental Operating Report
RBG-48082, 2020 Annual Radiological Environmental Operating Report20 April 20212020 Annual Radiological Environmental Operating Report
ML21096A02619 February 2021RB-2021-02 Draft Written Exam
ML21096A02819 February 2021RB-2021-02 Final Written Exam
ML19175A04211 September 2019Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules
CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 431 January 2019Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4
ML18284A37020 December 2018Renewed Facility Operating License NPF-47 Attachments and Appendices
RBG-47906, Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 618 October 2018Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6
ML18128A05230 April 2018License Amendment Request Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 - Evaluation of Proposed Changes
RBG-47805, Response to License Renewal Application NRC Request for Additional Information Set 212 December 2017Response to License Renewal Application NRC Request for Additional Information Set 2
ML17320B09916 November 2017Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application
IR 05000458/20160039 November 2016NRC Integrated Inspection Report 05000458/2016003
05000458/LER-2016-00725 July 20161 Operations Prohibited by Technical Specifications Due to Failure to Implement Required Actions Within Completion Time
LER 16-007-00 for River Bend Station, Unit 1, Regarding Operations Prohibited by Technical Specifications Due to Failure to Implement Required Actions Within Completion Time
ML14111A40427 March 20142014-03-Draft Operating Test
RBG-46419, Revisions to the Technical Requirements Manual and the Technical Specifications Bases8 April 2005Revisions to the Technical Requirements Manual and the Technical Specifications Bases
RBG-46049, Submittal of Revisions to Emergency Implementing Procedures11 December 2002Submittal of Revisions to Emergency Implementing Procedures
RBG-45992, License Amendment Request Application for Technical Specification Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement Process (CLIIP) (LAR 2002-22)21 August 2002License Amendment Request Application for Technical Specification Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement Process (CLIIP) (LAR 2002-22)
IR 05000458/200100811 January 2002IR 05000458/2001-008, Entergy Operations, Inc., River Bend Station, Baseline Inspection on 11/26-12/13/2001 of the Identification and Resolution of Problems. One Finding of No Color
IR 05000458/199900615 May 1999Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings
IR 05000458/199801327 October 1998Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering
IR 05000458/199700719 May 1997Insp Rept 50-458/97-07 on 970316-0426.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support
ML20116P1348 August 1996Technical Requirements Manual
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly5 August 1996Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly
RBG-41096, Responds to NRC Re Violations Noted in Insp Rept 50-458/94-19.Corrective Actions:Maint Lifting Procedures (Mlp) 7506, Refueling Platform & 7504, Fuel Handling Platform Will Be Revised9 December 1994Responds to NRC Re Violations Noted in Insp Rept 50-458/94-19.Corrective Actions:Maint Lifting Procedures (Mlp) 7506, Refueling Platform & 7504, Fuel Handling Platform Will Be Revised
ML20058K6008 December 1993Forwards Tia,Interpretation of Reporting Requirements, 93TIA006 Re Multiple Failures of safety-related Components
05000458/LER-1993-01226 August 1993LER 93-012-01:on 930603,deficiency in Plant Surveillance Test Procedures Identified.Caused by Inattention to Detail During Initial Procedure.Surveillance Test Procedures revised.W/930826 Ltr
ML20092H56613 February 1992Informational Rept:On 910228,hydraulic Control Unit 36-21 Found Leaking & Crack Discovered in Short,Horizontal Segment of Charging Water Piping.Caused by Fluid Transient.Reactor Scram History Developed
IR 05000458/199100721 February 1991Insp Rept 50-458/91-07 on 910116-0212.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance Observations,Complex Surveillance, & Engineering Safety Features
05000458/LER-1990-02218 June 1990LER 90-022-00:on 900518,HPCS Sys Declared Inoperable & 14-day Shutdown Limiting Condition for Operation Entered Due to Inoperative Suppression Pool Level Transmitter.Caused by Personnel Error.Reactor Operators trained.W/900618 Ltr
ML20011D62018 December 1989LER 89-040-00:on 891117,surveillance Test of Div II Penetration Valve Leakage Control Sys Air Supply Header Pressure Not Performed within Allowable Tolerance.Addl Training of Scheduling Group Will Be provided.W/891218 Ltr
IR 05000458/19890075 April 1989Insp Rept 50-458/89-07 on 890201-0314.No Violations or Deviations Noted.Major Areas Inspected:Plant Events, Emergency Preparedness Exercise,Operational Safety Verification & Surveillance Test Observation
RBG-23262, Submits Supplemental Response to Violations Noted in Insp Rept 50-458/85-69.Corrective Actions:Procedure Revised to Control Engineering Activities for Handling Mod Requests. Training of Personnel Commenced on 85120927 February 1986Submits Supplemental Response to Violations Noted in Insp Rept 50-458/85-69.Corrective Actions:Procedure Revised to Control Engineering Activities for Handling Mod Requests. Training of Personnel Commenced on 851209
RBG-22866, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-69.Corrective Actions:Nuclear Plant Engineering Procedure NuPE-AA-64 Issued to Provide Detailed Instructions & Restriction for Use of Field Change Notices19 December 1985Responds to NRC Re Violations Noted in Insp Rept 50-458/85-69.Corrective Actions:Nuclear Plant Engineering Procedure NuPE-AA-64 Issued to Provide Detailed Instructions & Restriction for Use of Field Change Notices
RBG-19736, Final Deficiency Rept DR-220 Re Tdi Standby Diesel Generator Cylinder Head Valve Seats.Initially Reported on 841119. Cylinder Heads Replaced19 December 1984Final Deficiency Rept DR-220 Re Tdi Standby Diesel Generator Cylinder Head Valve Seats.Initially Reported on 841119. Cylinder Heads Replaced