Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML22250A709 | 7 September 2022 | Generation Station, Emergency Plan, Revision 74 |
ML22173A087 | 21 June 2022 | Generation Station (Pvngs), Units 1, 2, and 3 and Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 73 |
ML21203A152 | 22 July 2021 | Generation Station (Pvngs), Units 1, 2, and 3 and Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 71 |
ML21203A138 | 22 July 2021 | Generation Station (Pvngs), Units 1, 2, and 3 and Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 70 |
ML19309F304 | 18 December 2019 | Issuance of Amendment Nos. 210, 210, and 210, to Revise Technical Specifications to Adopt Traveler TSTF-529, Revision 4,Clarify Use and Application |
ML19304C562 | 5 November 2019 | Safety Evaluation - Arizona Public Service Company - Palo Verde Nuclear Generating Station - License Amendment Request to Adopt TSTF-529 |
ML18361A845 | 27 December 2018 | Application to Revise Technical Specifications to Adopt TSTF- 529, Revision 4, Clarify Use and Application Rules, Using the Consolidated Line Item Improvement Process |
ML18341A159 | 6 December 2018 | Emergency Plan, Revision 63 |
ML18269A362 | 25 September 2018 | ISFSI - Emergency Plan, Revision 62 |
ML18172A007 | 12 June 2018 | Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 61 |
ML17269A264 | 21 September 2017 | Enclosure 1: Palo Verde, Units 1, 2, and 3, and ISFSI - Emergency Plan, Revision 60 |
ML17269A334 | 15 September 2017 | Emergency Plan, Rev. 59. Part 1 of 2 |
ML16133A621 | 12 May 2016 | ISFSI - Response to Request for Additional Information Regarding Proposed Changes to Emergency Action Levels |
05000530/LER-2015-004 | 5 February 2016 | Condition Prohibited by Technical Specifications 3.0.4 and 3.7.2 Due to an Inoperable Main Steam Isolation Valve LER 15-004-01 for Palo Verde, Unit 3, Regarding Condition Prohibited by Technical Specifications 3.0.4 and 3.7.2 Due to an Inoperable Main Steam Isolation Valve |
ML15293A335 | 9 October 2015 | Independent Spent Fuel Storage Installation (ISFSI) - Request for NRC Approval of Proposed Changed to Emergency Action Levels |
ML16154A581 | 30 September 2015 | PVNGS, Units 1, 2, and 3 - Technical Requirements Manual, Revision 63 |
ML15027A126 | 12 November 2014 | Technical Requirements Manual (TRM) Revision 62, Replacement Pages and Insertion Instructions |
ML15027A124 | 12 November 2014 | Technical Requirements Manual(Trm) Revision 62 |
ML14255A065 | 20 August 2014 | Technical Requirements Manual, Revision 61 |
ML14091A959 | 25 September 2013 | Technical Requirements Manual, Revision 59 |
ML13217A057 | 3 July 2013 | Enclosure 1 - Technical Requirements Manual, Revision 58 |
ML13120A503 | 10 April 2013 | Technical Requirements Manual, Revision 57 |
ML12193A043 | 17 November 2011 | Technical Requirements Manual, Revision 56 |
ML112710033 | 28 September 2011 | ROP Tabletop Examples and Results |
ML11287A032 | 1 September 2011 | Technical Requirements Manual, Revision 55 |
IR 05000528/2011003 | 11 August 2011 | IR 05000528-11-003, 05000529-11-003, 05000530-11-003; 04/01/2011 06/30/2011; Palo Verde Nuclear Generating Station, Integrated Resident and Regional Report; ISI Activities, Plant Mods., Exercise Evaluation and Ident. & Res. of Prob |
ML053110045 | 21 April 2011 | Current Facility Operating License NPF-41, Tech Specs, Revised 09/28/2017 |
ML110871955 | 21 April 2011 | License Renewal - Appendices a, B, C, and D to the Renewed Operating License for Unit 1 (NPF-41) |
ML11216A139 | 3 February 2011 | Comment (3) of Arizona Public Service Co on Proposed Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notifications |
ML110610758 | 26 January 2011 | Technical Requirements Manual, Revision 54 |
ML103350645 | 10 November 2010 | Technical Requirements Manual, Revision 53 |
ML102500671 | 1 February 2008 | NRC000052-Palo Verde Nuclear Generating Station NRC Supplemental Inspection 95003 Inspection Report February 1, 2008 |
ML060240389 | 29 November 2005 | Final Precursor Analysis - Palo Verde 1, 2, 3 - Emergency Core Cooling System Piping Voids May Have Prevented Fulfillment of Safety Function |
IR 05000528/2004013 | 3 December 2004 | IR 05000528-04-013, 05000529-04-013, 05000530-04-013, on 09/07/2004 - 10/26/2004; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Augmented Inspection Followup |
IR 05000528/2004004 | 5 November 2004 | IR 05000528-04-004, IR 05000529-04-004, and IR 05000530-04-004,on 07/01/04 - 09/30/04 for Palo Verde, Units 1, 2 and 3; Integrated Resident and Regional Report; Heat Sink Performance, Post-Maintenance Test, Event Followup, and Other Activit |
ML042020061 | 16 July 2004 | IR 05000528-04-012; IR 05000529-04-012; and IR 05000530-04-012; June 14 Through July 12, 2004, and Completed on June 18, 2004; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Augmented Inspection |
ML080290621 | 16 July 2004 | Email from S. Shields (NRR) to OPEX Daily Report - Braidwood, Et Al, Subject: DIER - Daily Industry Event Report for Monday, July 19, 2004 |
IR 05000529/2004009 | 4 May 2004 | IR 05000529-04-009, on February 25 Through April 8, 2004, for Palo Verde Nuclear Generating Station, Unit 2; Special Inspection to Evaluate Extended Period of Reduced Inventory Operation with Gas Entrainment in Shutdown Cooling System |
IR 05000529/2003301 | 8 May 2003 | May 2003 Retake Exam 50-529-2003-301 Final JPMs & Outline |
ML030380531 | 31 January 2003 | LER 03-S01-00 for Palo Verde, Units 1, 2 and 3 Safeguards Material Left Unattended |
ML022250669 | 7 August 2002 | LER 02-S01-00 for Palo Verde Nuclear Station (Pvng), Units 1,2 & 3 Re Reports Discovery of Uncontrolled Safeguards Material in Palo Verde Nuclear Station (PVNGS) Office Complex Outside of Protected Area |
ML021280305 | 7 May 2002 | Issuance of Amends 141, Tech Specification Pages Missed Surveillance |
ML020780363 | 1 March 2002 | Request for Amendment to Technical Specification Surveillance Requirement 3.0.3 Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process (CLIIP) |
ML17313A576 | 8 September 1998 | LER 98-003-01:on 980113,discovered That One Channel of RWT Level Sys Had Failed High.Caused by Water Intrusion Into Electrical Termination Pull Box.Weep Holes Were Drilled Into Bottoms of Pull Boxes Nearest Level Transmitters |
ML17313A572 | 6 September 1998 | Responds to NRC 980810 Ltr Re Violations Noted in Insp Repts 50-528/98-05,50-529/98-05 & 50-530/98-05,respectively. Corrective Actions:Verified That Letdown Backpressure Cv Was in Correct Position & Properly Locked & Statused in CR |
ML17313A520 | 30 July 1998 | LER 98-004-00:on 980630,personnel Discovered That Pressure Safety Valve Had Not Received Periodic Set Pressure Test for ASME Class 1 Pressure Safety Valve.Caused by Personnel Error.Pressure Safety Valve reviewed.W/980730 Ltr |
ML17313A386 | 15 May 1998 | Responds to NRC 980416 Ltr Re Violations Noted in Insp Repts 50-528/98-12,50-529/98-12 & 50-530/98-12.Corrective Actions: Addl Evaluation of Reason for Incorrect Surveillance Test Procedure Has Been Completed |
ML17313A325 | 1 April 1998 | LER 98-004-00:on 980304,safety Valves as-found Pressures Out of Tolerance.Cause of Event Is Under Investigation.Three Mssv'S & Psv Will Be Replaced W/Refurbished & Recertified Valves During Refueling Outage U1R7 |
ML17313A204 | 5 February 1998 | LER 97-006-00:on 971028,missed TS 4.0.5 SR Was Noted.Caused by Personnel Error.Independent Investigation of Event Is Being Conducted IAW W/Aps Corrective Action Program |
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly | 5 August 1996 | Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly |