Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML22250A7097 September 2022Generation Station, Emergency Plan, Revision 74
ML22173A08721 June 2022Generation Station (Pvngs), Units 1, 2, and 3 and Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 73
ML21203A15222 July 2021Generation Station (Pvngs), Units 1, 2, and 3 and Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 71
ML21203A13822 July 2021Generation Station (Pvngs), Units 1, 2, and 3 and Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 70
ML19309F30418 December 2019Issuance of Amendment Nos. 210, 210, and 210, to Revise Technical Specifications to Adopt Traveler TSTF-529, Revision 4,Clarify Use and Application
ML19304C5625 November 2019Safety Evaluation - Arizona Public Service Company - Palo Verde Nuclear Generating Station - License Amendment Request to Adopt TSTF-529
ML18361A84527 December 2018Application to Revise Technical Specifications to Adopt TSTF- 529, Revision 4, Clarify Use and Application Rules, Using the Consolidated Line Item Improvement Process
ML18341A1596 December 2018Emergency Plan, Revision 63
ML18269A36225 September 2018ISFSI - Emergency Plan, Revision 62
ML18172A00712 June 2018Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 61
ML17269A26421 September 2017Enclosure 1: Palo Verde, Units 1, 2, and 3, and ISFSI - Emergency Plan, Revision 60
ML17269A33415 September 2017Emergency Plan, Rev. 59. Part 1 of 2
ML16133A62112 May 2016ISFSI - Response to Request for Additional Information Regarding Proposed Changes to Emergency Action Levels
05000530/LER-2015-0045 February 2016Condition Prohibited by Technical Specifications 3.0.4 and 3.7.2 Due to an Inoperable Main Steam Isolation Valve
LER 15-004-01 for Palo Verde, Unit 3, Regarding Condition Prohibited by Technical Specifications 3.0.4 and 3.7.2 Due to an Inoperable Main Steam Isolation Valve
ML15293A3359 October 2015Independent Spent Fuel Storage Installation (ISFSI) - Request for NRC Approval of Proposed Changed to Emergency Action Levels
ML16154A58130 September 2015PVNGS, Units 1, 2, and 3 - Technical Requirements Manual, Revision 63
ML15027A12612 November 2014Technical Requirements Manual (TRM) Revision 62, Replacement Pages and Insertion Instructions
ML15027A12412 November 2014Technical Requirements Manual(Trm) Revision 62
ML14255A06520 August 2014Technical Requirements Manual, Revision 61
ML14091A95925 September 2013Technical Requirements Manual, Revision 59
ML13217A0573 July 2013Enclosure 1 - Technical Requirements Manual, Revision 58
ML13120A50310 April 2013Technical Requirements Manual, Revision 57
ML12193A04317 November 2011Technical Requirements Manual, Revision 56
ML11271003328 September 2011ROP Tabletop Examples and Results
ML11287A0321 September 2011Technical Requirements Manual, Revision 55
IR 05000528/201100311 August 2011IR 05000528-11-003, 05000529-11-003, 05000530-11-003; 04/01/2011 06/30/2011; Palo Verde Nuclear Generating Station, Integrated Resident and Regional Report; ISI Activities, Plant Mods., Exercise Evaluation and Ident. & Res. of Prob
ML05311004521 April 2011Current Facility Operating License NPF-41, Tech Specs, Revised 09/28/2017
ML11087195521 April 2011License Renewal - Appendices a, B, C, and D to the Renewed Operating License for Unit 1 (NPF-41)
ML11216A1393 February 2011Comment (3) of Arizona Public Service Co on Proposed Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notifications
ML11061075826 January 2011Technical Requirements Manual, Revision 54
ML10335064510 November 2010Technical Requirements Manual, Revision 53
ML1025006711 February 2008NRC000052-Palo Verde Nuclear Generating Station NRC Supplemental Inspection 95003 Inspection Report February 1, 2008
ML06024038929 November 2005Final Precursor Analysis - Palo Verde 1, 2, 3 - Emergency Core Cooling System Piping Voids May Have Prevented Fulfillment of Safety Function
IR 05000528/20040133 December 2004IR 05000528-04-013, 05000529-04-013, 05000530-04-013, on 09/07/2004 - 10/26/2004; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Augmented Inspection Followup
IR 05000528/20040045 November 2004IR 05000528-04-004, IR 05000529-04-004, and IR 05000530-04-004,on 07/01/04 - 09/30/04 for Palo Verde, Units 1, 2 and 3; Integrated Resident and Regional Report; Heat Sink Performance, Post-Maintenance Test, Event Followup, and Other Activit
ML04202006116 July 2004IR 05000528-04-012; IR 05000529-04-012; and IR 05000530-04-012; June 14 Through July 12, 2004, and Completed on June 18, 2004; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Augmented Inspection
ML08029062116 July 2004Email from S. Shields (NRR) to OPEX Daily Report - Braidwood, Et Al, Subject: DIER - Daily Industry Event Report for Monday, July 19, 2004
IR 05000529/20040094 May 2004IR 05000529-04-009, on February 25 Through April 8, 2004, for Palo Verde Nuclear Generating Station, Unit 2; Special Inspection to Evaluate Extended Period of Reduced Inventory Operation with Gas Entrainment in Shutdown Cooling System
IR 05000529/20033018 May 2003May 2003 Retake Exam 50-529-2003-301 Final JPMs & Outline
ML03038053131 January 2003LER 03-S01-00 for Palo Verde, Units 1, 2 and 3 Safeguards Material Left Unattended
ML0222506697 August 2002LER 02-S01-00 for Palo Verde Nuclear Station (Pvng), Units 1,2 & 3 Re Reports Discovery of Uncontrolled Safeguards Material in Palo Verde Nuclear Station (PVNGS) Office Complex Outside of Protected Area
ML0212803057 May 2002Issuance of Amends 141, Tech Specification Pages Missed Surveillance
ML0207803631 March 2002Request for Amendment to Technical Specification Surveillance Requirement 3.0.3 Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process (CLIIP)
ML17313A5768 September 1998LER 98-003-01:on 980113,discovered That One Channel of RWT Level Sys Had Failed High.Caused by Water Intrusion Into Electrical Termination Pull Box.Weep Holes Were Drilled Into Bottoms of Pull Boxes Nearest Level Transmitters
ML17313A5726 September 1998Responds to NRC 980810 Ltr Re Violations Noted in Insp Repts 50-528/98-05,50-529/98-05 & 50-530/98-05,respectively. Corrective Actions:Verified That Letdown Backpressure Cv Was in Correct Position & Properly Locked & Statused in CR
ML17313A52030 July 1998LER 98-004-00:on 980630,personnel Discovered That Pressure Safety Valve Had Not Received Periodic Set Pressure Test for ASME Class 1 Pressure Safety Valve.Caused by Personnel Error.Pressure Safety Valve reviewed.W/980730 Ltr
ML17313A38615 May 1998Responds to NRC 980416 Ltr Re Violations Noted in Insp Repts 50-528/98-12,50-529/98-12 & 50-530/98-12.Corrective Actions: Addl Evaluation of Reason for Incorrect Surveillance Test Procedure Has Been Completed
ML17313A3251 April 1998LER 98-004-00:on 980304,safety Valves as-found Pressures Out of Tolerance.Cause of Event Is Under Investigation.Three Mssv'S & Psv Will Be Replaced W/Refurbished & Recertified Valves During Refueling Outage U1R7
ML17313A2045 February 1998LER 97-006-00:on 971028,missed TS 4.0.5 SR Was Noted.Caused by Personnel Error.Independent Investigation of Event Is Being Conducted IAW W/Aps Corrective Action Program
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly5 August 1996Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly