Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23332A19228 November 2023Solutions, Inc., Request for Exemptions from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation
ML22290A00828 June 2022(KPS) Independent Spent Fuel Storage Installation (ISFSI) Only Emergency Plan (Ioep), Revision 0KS
ML16097A41729 March 2016Technical Specifications Bases Changes and Technical Requirements Manual Changes
ML15261A23814 September 2015License Amendment Request 259, ISFSI-Only Emergency Plan and Emergency Action Level Scheme
ML14237A04513 February 2015Issuance of Amendment No. 215, Revise Operating License and Technical Specifications to the Permanently Defueled Technical Specifications Consistent with Permanent Cessation of Reactor Operation
ML14178A16719 June 2014Supplement 1 and Response to Request for Additional Information Regarding License Amendment Request 257, Permanently Defueled Emergency Plan and Emergency Action Level Scheme
ML14029A05916 January 2014Enclosure 3 to 13-495A - Permanently Defueled Emergency Action Level Basis Document
ML13094A2704 April 2013EA-12-272, Kewaunee Power Station, Notice of Violation
ML13066A3317 March 2013Regulatory Conference Presentation 3-12-2013
IR 05000305/201100328 July 2011IR 05000305-11-003, 4/01/2011 - 6/30/2011; Kewaunee Power Station; Maintenance Effectiveness, Operability Evaluations, and Identification and Resolution of Problems
ML11129A08118 April 20112010 Annual Radiological Environmental Operating Report
ML05304035224 February 2011Current Facility Operating License DPR-43, Tech Specs, Revised 10/07/2015
ML1020206642 February 2011Part 090 ME2139 KPS (Kewaunee) Improved Technical Specifications 2010-10-21
ML1018902111 July 2010Attachment 1, Volume 5, Revision 1, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.0, LCO and SR Applicability
ML1018902151 July 2010Attachment 1, Volume 3, Revision 1, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Chapter 1.0 Use and Application
ML10125014626 April 20102009 Annual Environmental Monitoring Report
IR 05000305/201000712 March 2010IR 05000305-10-007 (DRS) on 01/25/2010 - 02/12/2010 for Kewaunee Power Station, Evaluations of Changes, Tests or Experiments and Permanent Plant Modifications
ML09244042324 August 2009Attachment 1 - Volume 5, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.0, LCO and SR Applicability, Revision 0
ML09244042124 August 2009Attachment 1 - Volume 3, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Chapter 1.0, Use and Application, Revision 0
ML0922306186 August 2009Response to Request for Additional Information for the Review of the License Renewal Application - Leak Before Break/Boral
IR 05000305/20090035 August 2009IR 05000305-09-003, on 04/01/2009 - 06/30/2009, Kewaunee Power Station, Operability Evaluations, Component Design Bases Inspection, Surveillance Testing; and Follow Up of Events and Notices of Enforcement Discretion
ML09216041313 April 20092009 Kewaunee Initial Examination Proposed Written Examination
ML09148035131 December 20082008 Radiological Monitoring Program, Annual Report Parts I and II
IR 05000305/20070111 February 2008IR 05000305-07-011; on 10/26/2007-12/19/2007; Kewaunee Power Station; Supplemental Inspection 95002, Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area
ML07296017031 October 2007Public Meeting Summary on the Reactor Oversight Process
ML07253061421 September 2007Public Meeting Summary on the Reactor Oversight Process
ML0721904619 August 2007Appeal of FAQ 69.2 - Emergency Diesel Generator Fuel Oil Line Filling Failure
ML07200042826 July 2007FAQ Log, Dated 6/13/07
IR 05000305/20070061 June 2007IR 05000305-07-006, on 01/29/2007 - 03/02/2007; Kewaunee Power Station; Component Design Basis Inspection (CDBI)
IR 05000305/200700210 May 2007IR 05000305-07-002, 01/01/2007 - 03/31/2007; Kewaunee Power Station. Adverse Weather, Maintenance Effectiveness, Maintenance Risk Assessments and Emergent Work Control, Operability Evaluations, Refueling and Other Outage Activities
ML05361009516 December 2005Appendix C - Fault Tree Analysis - Attachment 1 - Human Error Probabilities; Attachment 1:A - Human Error Probabilities
ML05046022014 February 2005IR 05000305-04-009 on 10/01/2004 - 12/31/2004 for Kewaunee Nuclear Power Plant; Fire Protection, Refueling and Outage Activities, Identification and Resolution of Problems, Event Follow-up, Other Activities and Cross-Cutting Areas
ML04357001714 December 2004from NMC Re Technical Evaluation of Proposed Method of Class 3 Pipe Leak Operability Determinations
ML05144029726 October 2004Revision to Emergency Action Levels, Facility Operating License as Amended Through October 21, 2004 Document
ML0416100461 June 2004License Amendment Request 204 to Technical Specifications; Extend Reactor Trip System and Engineered Safety Features Actuation System Surveillance Test Intervals as Evaluated in WCAP-15376-P-A
ML04042041830 January 2004Responses to NRC Clarification Questions on Responses to Requests for Additional Information Regarding License Amendment Request 195, Stretch Power Uprate
ML02288037511 October 2002Correction to Issuance of Amendment 163 - S105862
ML02268063324 September 2002Technical Specifications, Revise Requirements for Missed Surveillance Using the Consolidated Line Item Improvement Process, (MB5185) - S105735
IR 05000305/200200325 July 2002IR 05000305-02-003, on April 1-June 30, 2002, Nuclear Management Co., Llc. Operability Evaluations, Surveillance Testing & Event Followup. Non-Cited Violations Noted
ML0214402327 May 2002Proposed Amendment 180 Application for Technical Specification Change Re Missed Surveillance & Adoption of Technical Specifications Bases Control Program) Using Consolidated Line Item Improvement Process
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly5 August 1996Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly