Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML24012A065 | 30 January 2024 | Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) |
NL-23-0879, Request for Exemption from Security Event Notification Implementation | 29 November 2023 | Request for Exemption from Security Event Notification Implementation |
ML23206A053 | 25 July 2023 | 2A, Exam Draft Items (Hatch 2021-301) |
ML21109A359 | 22 April 2021 | Issuance of Amendment No. 254, Regarding Revision to Technical Specifications for One-Time Extension of Completion Times Related to Residual Heat Removal System (Emergency Circumstances) |
IR 05000321/2020010 | 22 December 2020 | Design Basis Assurance Inspection (Programs) Inspection Report 05000321/2020010 and 05000366/2020010 |
ML20303A180 | 29 September 2020 | Rev. 123 to Technical Requirement Manual, Unit 2 |
NL-17-1122, Minor Typographical Corrections to License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules | 22 June 2017 | Minor Typographical Corrections to License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules |
ML17010A369 | 10 January 2017 | FSAR Part 8 - Redacted |
ML16340A005 | 1 December 2016 | License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Rev 4, Clarify Use and Application Rules. |
NL-16-1830, Southern Nuclear Operating Company Response to RAI for License Amendment Regarding Emergency Action Level Schemes to Adopt NEI 99-01 Rev 6 and to Modify Radiation Monitors at Farley Nuclear Plant, Part 1C of 1C | 3 November 2016 | Southern Nuclear Operating Company Response to RAI for License Amendment Regarding Emergency Action Level Schemes to Adopt NEI 99-01 Rev 6 and to Modify Radiation Monitors at Farley Nuclear Plant, Part 1C of 1C |
05000366/LER-2016-001 | 8 June 2016 | 2C EDG Fuel Oil Relief Valve Leakage Caused Train Inoperability LER 16-001-00 for E.I. Hatch, Unit 2, Regarding 2C EDG Fuel Oil Relief Valve Leakage Caused Train Inoperability |
NL-15-1898, Enclosure 6: Clean-Typed EAL Schemes - License Amendment Request for Changes to EAL Schemes to Adopt NEI 99-01 Rev. 6 and to Modify Radiation Monitors at Farley Nuclear Plant | 3 March 2016 | Enclosure 6: Clean-Typed EAL Schemes - License Amendment Request for Changes to EAL Schemes to Adopt NEI 99-01 Rev. 6 and to Modify Radiation Monitors at Farley Nuclear Plant |
NL-15-1898, Enclosure 5: Marked-Up EAL Schemes - License Amendment Request for Changes to EAL Schemes to Adopt NEI 99-01 Rev. 6 and to Modify Radiation Monitors at Farley Nuclear Plant. Part 5 of 8 | 3 March 2016 | Enclosure 5: Marked-Up EAL Schemes - License Amendment Request for Changes to EAL Schemes to Adopt NEI 99-01 Rev. 6 and to Modify Radiation Monitors at Farley Nuclear Plant. Part 5 of 8 |
NL-15-1898, Enclosure 5: Marked-Up EAL Schemes - License Amendment Request for Changes to EAL Schemes to Adopt NEI 99-01 Rev. 6 and to Modify Radiation Monitors at Farley Nuclear Plant. Part 1 of 8 | 3 March 2016 | Enclosure 5: Marked-Up EAL Schemes - License Amendment Request for Changes to EAL Schemes to Adopt NEI 99-01 Rev. 6 and to Modify Radiation Monitors at Farley Nuclear Plant. Part 1 of 8 |
NL-15-1898, Enclosure 5: Vogtle Marked-Up EAL Schemes - License Amendment Request for Changes to EAL Schemes to Adopt NEI 99-01 Rev. 6 and to Modify Radiation Monitors at Farley Nuclear Plant. Part 1 of 4 | 3 March 2016 | Enclosure 5: Vogtle Marked-Up EAL Schemes - License Amendment Request for Changes to EAL Schemes to Adopt NEI 99-01 Rev. 6 and to Modify Radiation Monitors at Farley Nuclear Plant. Part 1 of 4 |
ML16071A176 | 3 March 2016 | Enclosure 5: Marked-Up EAL Schemes - License Amendment Request for Changes to EAL Schemes to Adopt NEI 99-01 Rev. 6 and to Modify Radiation Monitors at Farley Nuclear Plant. Part 1 of 8 |
ML16071A160 | 3 March 2016 | Enclosure 5: Vogtle Marked-Up EAL Schemes - License Amendment Request for Changes to EAL Schemes to Adopt NEI 99-01 Rev. 6 and to Modify Radiation Monitors at Farley Nuclear Plant. Part 1 of 4 |
ML16071A185 | 3 March 2016 | Enclosure 5: Marked-Up EAL Schemes - License Amendment Request for Changes to EAL Schemes to Adopt NEI 99-01 Rev. 6 and to Modify Radiation Monitors at Farley Nuclear Plant. Part 5 of 8 |
ML16071A195 | 3 March 2016 | Enclosure 6: Clean-Typed EAL Schemes - License Amendment Request for Changes to EAL Schemes to Adopt NEI 99-01 Rev. 6 and to Modify Radiation Monitors at Farley Nuclear Plant |
IR 05000321/2014005 | 26 January 2015 | IR 05000321/2014005 and 05000366/2014005, on October 1, 2014, Through December 31, 2014; Edwin I. Hatch, Units 1 and 2, Fire Protection, Problem Identification and Resolution |
ML13324A261 | 18 November 2013 | Initial Exam 2013-301 Draft SRO Written Exams |
IR 05000321/2012005 | 28 January 2013 | IR 05000321-12-005, 05000366-12-005, 05000321-12-502 & 05000366-12-502, 10/01/2012 - 12/31/2012, Edwin I. Hatch Nuclear Plant, Unit 1 & 2, Flood Protection Measures, Follow-up of Events and Notices of Enforcement Discretion, Other Activitie |
ML12342A043 | 6 December 2012 | Initial Exam 2012-301 Draft SRO Written Exam |
IR 05000321/2012008 | 10 October 2012 | IR 05000321-12-008, 05000366-12-008; 6/4/2012 - 9/6/2012; Edwin I. Hatch Nuclear Plant, Units 1 and 2; Component Design Bases Inspection |
ML11320A128 | 24 October 2011 | Technical Requirements Manual |
NL-11-1812, Technical Requirements Manual | 24 October 2011 | Technical Requirements Manual |
NL-11-1812, Edwin I. Hatch, Unit 1 - Technical Requirements Manual | 24 October 2011 | Edwin I. Hatch, Unit 1 - Technical Requirements Manual |
ML112301688 | 21 June 2011 | Initial Exam 2011-301 Draft SRO Written Exam |
NL-10-0403, Response to Apparent Violation in Inspection Report 05000366-09-005 | 19 March 2010 | Response to Apparent Violation in Inspection Report 05000366-09-005 |
IR 05000321/2009005 | 12 February 2010 | IR 05000321-09-005, 05000366-09-005; 10/01/2009-12/31/2009; Edwin I. Hatch Nuclear Plant, Units 1 and 2; Maintenance Effectiveness, Event Follow-up, and Other Activities and a Preliminary Greater than Green Finding |
Information Notice 2008-04, Counterfeit Parts Supplied to Nuclear Power Plants | 7 April 2008 | Counterfeit Parts Supplied to Nuclear Power Plants |
NL-05-1699, Application for Technical Specification Amendment to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process | 17 February 2006 | Application for Technical Specification Amendment to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process |
ML040570280 | 20 February 2004 | Attachment 3, Technical Specifications Pages 3.0.3, SR Applicability 3.0, Amendments 228 & 170 |
ML023250388 | 13 November 2002 | HI-STROM 100 Certificate of Compliance 1014 Report Pursuant to 10CFR 72.242(d) |
ML020930422 | 28 March 2002 | Part 1 of 2, Edwin I. Hatch Nuclear Plant, Units 1 & 2, Technical Specifications |
ML020720414 | 8 March 2002 | Technical Specification Pages for Amendments 228 & 170 for Edwin I. Hatch, Units 1 & 2 |
ML031640174 | 15 January 2002 | Issuance of Renewed Operating Licenses for Hatch Units 1 & 2 (Technical Specifications, Appendix a) |
HL-5576, Provides Response to Violations Noted in Insp Repts 50-321/97-11 & 50-366/97-11.Corrective Actions:Involved Personnel Have Been Counseled Re Need to Fully Utilize Resources Available to Them to Ensure,Events Reported | 20 February 1998 | Provides Response to Violations Noted in Insp Repts 50-321/97-11 & 50-366/97-11.Corrective Actions:Involved Personnel Have Been Counseled Re Need to Fully Utilize Resources Available to Them to Ensure,Events Reported |
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly | 5 August 1996 | Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly |
ML20076L691 | 19 October 1994 | Proposed Improved Tech Specs,Rev F |
ML20029B062 | 26 February 1991 | LER 91-001-00:on 910129,determined That Setpoints for Condensate Storage Tank Level Switches Not Set to Initiate Required Transfer When 10,000 Gallons Water Available.Caused by Inadequate Documentation.Setpoints raised.W/910226 Ltr |
ML19332E614 | 30 November 1989 | LER 89-016-00:on 891103,discovered That Procedures 57SV-C51-001-1/2S Did Not Fully Test Rod Block Monitor Function.Caused by Procedural Deficiency.Limiting Condition for Operation Initiated & Procedure revised.W/891130 Ltr |
IR 05000321/1987018 | 31 August 1987 | Insp Repts 50-321/87-18 & 50-366/87-18 on 870720-24. Violations Noted.Major Areas Inspected:Emergency Preparedness |
ML20203C462 | 2 April 1986 | Responds to NRC Re Violations Noted in Insp Rept 50-321/85-32.Alleged Violation Denied.Unisolable Crack in Purge Line Not Reportable Per 10CFR50.72(b)(2)(i) |
ML20154J887 | 5 March 1986 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-321/85-32 & 50-366/85-32.Violation 1 Remains as Stated in Notice of Violation.Response to Violation 1 Requested |
ML20092P097 | 13 April 1984 | Responds to NRC Re Violations Noted in IE Insp Repts 50-321/84-07 & 50-366/84-07.Corrective Actions:Mgt Overview Committee Established to Review safety-related Maint Requests |
05000366/LER-1983-040, Updated LER 83-040/03X-1:on 830709 & 14,control Rod Drive Low Pressure or High Level Alarm Received for HCV 2C11-26-31 & 02-29.Caused by Leaking EP-111 Nitrogen Charging Valves. Valves Replaced & HCVs Returned to Svc | 12 March 1984 | Updated LER 83-040/03X-1:on 830709 & 14,control Rod Drive Low Pressure or High Level Alarm Received for HCV 2C11-26-31 & 02-29.Caused by Leaking EP-111 Nitrogen Charging Valves. Valves Replaced & HCVs Returned to Svc |
ML20080R767 | 10 February 1984 | Responds to IE Bulletin 84-01 Re Insp for Cracks in Mark I Containment Torus Vent Header.No Apparent Cracking or Relevant Indications Found on Unit 1.No Addl Cracking Found Beyond Original Cracking on Unit 2 |
ML20054G298 | 13 May 1982 | Ro:On 820513,error Discovered in Odyn Transient Code Which Could Result in .01 Nonconservatism in Cycle 3 Limiting Condition for Operation for Max Critical Power Ratio.Caused by Incorrect Programming in Axial Distribution Calculation |
ML19340E176 | 30 December 1980 | LER 80-122/01T-0:on 801219,QC Insp of Cable Spreading Room & Control Bldg Sprinkler Hangers Installed in 1978 Revealed Deficiencies Which Jeopardize Seismic Qualification of Sprinkler Sys.Caused by Improper Installation |