Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
U-604780, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 17 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation |
ML22111A224 | 31 March 2022 | 2 to Updated Safety Analysis Report, Clinton Power Station Operational Requirements Manual (Orm) |
ML20141L636 | 10 July 2020 | Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 |
JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | 22 June 2020 | Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability |
ML20105A277 | 31 March 2020 | 1 to Updated Safety Analysis Report, CPS Operational Requirements |
ML17163A355 | 31 August 2017 | Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) |
05000461/LER-2017-004 | 10 July 2017 | Main Steam Isolation Valve Local Leak Rate Test Limit Exceeded During Refueling Outage LER 17-004-00 For Clinton Power Station, Unit 1 Re: Main Steam Isolation Valve Local Leak Rate Test Limit Exceeded During Refueling Outage |
RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process | 28 March 2017 | Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process |
RS-16-228, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition | 17 November 2016 | License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition |
IR 05000461/2016001 | 9 May 2016 | NRC Integrated Inspection Report 05000461/2016001, January 1, 2016 Through March 31, 2016, Clinton Power Station |
IR 05000461/2015002 | 4 August 2015 | IR 05000461/2015002; on 04/01/2015-06/30/2015; Clinton Power Station, Unit 1; Integrated, Post Maintenance Testing, Occupational Dose Assessment, and Identification and Resolution of Problems |
RS-14-006, Updated Safety Analysis Report, Revision 16, CPS Operational Requirements Manual | 9 January 2014 | Updated Safety Analysis Report, Revision 16, CPS Operational Requirements Manual |
ML13276A135 | 27 August 2013 | 2013 Clinton Power Station Initial License Examination As-Administered SRO Written Examination |
ML13255A100 | 21 June 2013 | 2013 Clinton Power Station Initial License Examination Proposed SRO Written Examination |
IR 05000461/2013002 | 23 April 2013 | IR 05000461-13-002, 01/01/2013 - 03/31/2013, Clinton Power Station, Unit 1, Radiological Hazard Assessment and Exposure Controls, Identification and Resolution of Problems |
IR 05000461/2012005 | 28 January 2013 | IR 05000461-12-005, on 10/01/12 - 12/31/12, Clinton Power Station, Unit 1, Maintenance Effectiveness, Operability Evaluations, Identification and Resolution of Problems |
RS-13-009, Operational Requirements Manual (Orm) 2013 | 10 January 2013 | Operational Requirements Manual (Orm) 2013 |
IR 05000461/2012004 | 5 November 2012 | IR 05000461-12-004; 09/30/2012; Clinton Power Station; Maintenance Effectiveness |
IR 05000461/2012003 | 6 August 2012 | IR 05000461-12-003, 04/01/12 - 06/30/12; Clinton Power Station, Unit 1; Adverse Weather Protection, Problem Identification and Resolution |
IR 05000461/2011004 | 3 November 2011 | IR 05000461-11-004, on 07/01/11 - 09/30/11, Clinton Power Station, Unit 1, Integrated Inspection Report |
ML112710033 | 28 September 2011 | ROP Tabletop Examples and Results |
U-604018, Annual Radioactive Effluent Release Report | 28 April 2011 | Annual Radioactive Effluent Release Report |
ML110050162 | 1 October 2010 | Offsite Dose Calculation Manual |
ML102150468 | 3 August 2010 | IR 05000461-10-003, on 04/01/10 - 06/30/10; Clinton Power Station, Unit 1; Flood Protection Measures, Maintenance Risk Assessments and Emergent Work Control, Operability Evaluations, Emergency Response Organization Augmentation Testing.. |
U-603962, Addenda to 2009 Annual Radioactive Effluent Release Report | 7 June 2010 | Addenda to 2009 Annual Radioactive Effluent Release Report |
U-603953, 2009 Annual Radioactive Effluent Release Report | 28 April 2010 | 2009 Annual Radioactive Effluent Release Report |
ML101100101 | 19 April 2010 | Task Interface Agreement - Evaluation of Application of Technical Specification Surveillance Requirement 3.0.3, Surveillance Requirement Applicability, at Clinton Power Station (TIA 2010-001) |
IR 05000461/2009003 | 28 July 2009 | IR 05000461-09-003, 04/01/09 - 06/30/09, Clinton Power Station, Unit 1, Operability Evaluations, Surveillance Testing |
U-603858, Addenda to 2005 Annual Radioactive Effluent Release Report | 27 May 2008 | Addenda to 2005 Annual Radioactive Effluent Release Report |
ML052980008 | 21 October 2005 | Tech Spec Pages for Amendment 169 Changes to Technical Specifications to Accommodate 24-Month Fuel Cycles |
IR 05000461/2004005 | 30 July 2004 | IR 05000461-04-005, on 04/01/2004 - 06/30/2004; Clinton Power Station; as Low as Reasonably Achievable Planning and Control and Event Follow-Up |
ML080290621 | 16 July 2004 | Email from S. Shields (NRR) to OPEX Daily Report - Braidwood, Et Al, Subject: DIER - Daily Industry Event Report for Monday, July 19, 2004 |
U-603660, 2003 Annual Radiological Environmental Operating Report | 27 April 2004 | 2003 Annual Radiological Environmental Operating Report |
ML040290747 | 13 February 2004 | Initial Ro/Sro Examination 01/2004 |
ML041070707 | 6 January 2004 | Initial Submittal Written Exam |
ML032721611 | 25 September 2003 | Site Redress Plan for the Exelon Generation Company, LLC Early Site Permit |
ML032721608 | 25 September 2003 | Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Chapter 3 Through Figure 5.1-2 |
IR 05000461/2003003 | 23 April 2003 | IR 05000461-03-003, on 12/29/2002 - 03/31/2003, for Exelon Generator Co. LLC, Warrenville, Il DRP Integrated Report. Non-Cited Violation Noted |
U-603543, Part 2 of 2, Clinton Power Station, Annual Radioactive Effluent Release Report, CPS-Offsite Dose Calculation Manual | 8 March 2002 | Part 2 of 2, Clinton Power Station, Annual Radioactive Effluent Release Report, CPS-Offsite Dose Calculation Manual |
IR 05000461/1999002 | 18 March 1999 | Insp Rept 50-461/99-02 on 990107-0216.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering, & Plant Support |
ML20206E628 | 31 December 1998 | Rev 17 to ODCM for Clinton Power Station |
U-602734, Annual Radioactive Effluent Release Rept for 1996 | 31 December 1996 | Annual Radioactive Effluent Release Rept for 1996 |
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly | 5 August 1996 | Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly |
ML20106D066 | 31 May 1992 | 10CFR50.59 Rept for May 1991 Through May 1992 |
U-601820, Proposed Tech Specs Re Operational Leakage & Reactor Coolant Leakage Detection Sys,In Response to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping | 7 May 1991 | Proposed Tech Specs Re Operational Leakage & Reactor Coolant Leakage Detection Sys,In Response to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping |
IR 05000461/1990011 | 25 July 1990 | Safety Insp Rept 50-461/90-11 on 900512-0703.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Operational Safety,Event Followup,Radiological Controls,Maint/Surveillance,Lers,Tmi Items & Meetings |
ML20044B248 | 11 July 1990 | Proposed Tech Specs 4.0.5,3/4.4.3.1, RCS Leakage Detection Sys, 3/4.4.3.2, Operational Leakage, 3/4.8.3.1, Onsite Power Distribution Sys-Operating & 3/4.8.1.1, AC Sources - Operating. |
ML20042E678 | 23 April 1990 | LER 90-005-00:on 900322,containment Penetration Identified to Have motor-operated Valve W/Inadequate Actuator on Inboard Isolation Valve.Caused by Failure to Consider Design Capabilities of Actuators.Actuators reworked.W/900423 Ltr |
IR 05000461/1987036 | 4 December 1987 | Insp Rept 50-461/87-36 on 871014-1125.Violation Noted.Major Areas Inspected:Offsite Review Committee,Onsite Followup of Written Repts of Nonroutine Events at Power Facilities, Operational Safety Verification & ESF Sys Walkdown |
ML20215G858 | 10 April 1987 | Advises That Review of Facility Reportability Matrix for Security Events,Submitted on 870304,adequate Except for Compensatory Measure Column.Matrix Must Be Revised to Ensure Compensatory Measures Taken within 10 Minutes of Event |