U-604780, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation17 November 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation
ML22111A22431 March 20222 to Updated Safety Analysis Report, Clinton Power Station Operational Requirements Manual (Orm)
ML20141L63610 July 2020Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2
JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability22 June 2020Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability
ML20105A27731 March 20201 to Updated Safety Analysis Report, CPS Operational Requirements
ML17163A35531 August 2017Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490)
05000461/LER-2017-00410 July 2017Main Steam Isolation Valve Local Leak Rate Test Limit Exceeded During Refueling Outage
LER 17-004-00 For Clinton Power Station, Unit 1 Re: Main Steam Isolation Valve Local Leak Rate Test Limit Exceeded During Refueling Outage
RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process28 March 2017Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process
RS-16-228, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition17 November 2016License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition
IR 05000461/20160019 May 2016NRC Integrated Inspection Report 05000461/2016001, January 1, 2016 Through March 31, 2016, Clinton Power Station
IR 05000461/20150024 August 2015IR 05000461/2015002; on 04/01/2015-06/30/2015; Clinton Power Station, Unit 1; Integrated, Post Maintenance Testing, Occupational Dose Assessment, and Identification and Resolution of Problems
RS-14-006, Updated Safety Analysis Report, Revision 16, CPS Operational Requirements Manual9 January 2014Updated Safety Analysis Report, Revision 16, CPS Operational Requirements Manual
ML13276A13527 August 20132013 Clinton Power Station Initial License Examination As-Administered SRO Written Examination
ML13255A10021 June 20132013 Clinton Power Station Initial License Examination Proposed SRO Written Examination
IR 05000461/201300223 April 2013IR 05000461-13-002, 01/01/2013 - 03/31/2013, Clinton Power Station, Unit 1, Radiological Hazard Assessment and Exposure Controls, Identification and Resolution of Problems
IR 05000461/201200528 January 2013IR 05000461-12-005, on 10/01/12 - 12/31/12, Clinton Power Station, Unit 1, Maintenance Effectiveness, Operability Evaluations, Identification and Resolution of Problems
RS-13-009, Operational Requirements Manual (Orm) 201310 January 2013Operational Requirements Manual (Orm) 2013
IR 05000461/20120045 November 2012IR 05000461-12-004; 09/30/2012; Clinton Power Station; Maintenance Effectiveness
IR 05000461/20120036 August 2012IR 05000461-12-003, 04/01/12 - 06/30/12; Clinton Power Station, Unit 1; Adverse Weather Protection, Problem Identification and Resolution
IR 05000461/20110043 November 2011IR 05000461-11-004, on 07/01/11 - 09/30/11, Clinton Power Station, Unit 1, Integrated Inspection Report
ML11271003328 September 2011ROP Tabletop Examples and Results
U-604018, Annual Radioactive Effluent Release Report28 April 2011Annual Radioactive Effluent Release Report
ML1100501621 October 2010Offsite Dose Calculation Manual
ML1021504683 August 2010IR 05000461-10-003, on 04/01/10 - 06/30/10; Clinton Power Station, Unit 1; Flood Protection Measures, Maintenance Risk Assessments and Emergent Work Control, Operability Evaluations, Emergency Response Organization Augmentation Testing..
U-603962, Addenda to 2009 Annual Radioactive Effluent Release Report7 June 2010Addenda to 2009 Annual Radioactive Effluent Release Report
U-603953, 2009 Annual Radioactive Effluent Release Report28 April 20102009 Annual Radioactive Effluent Release Report
ML10110010119 April 2010Task Interface Agreement - Evaluation of Application of Technical Specification Surveillance Requirement 3.0.3, Surveillance Requirement Applicability, at Clinton Power Station (TIA 2010-001)
IR 05000461/200900328 July 2009IR 05000461-09-003, 04/01/09 - 06/30/09, Clinton Power Station, Unit 1, Operability Evaluations, Surveillance Testing
U-603858, Addenda to 2005 Annual Radioactive Effluent Release Report27 May 2008Addenda to 2005 Annual Radioactive Effluent Release Report
ML05298000821 October 2005Tech Spec Pages for Amendment 169 Changes to Technical Specifications to Accommodate 24-Month Fuel Cycles
IR 05000461/200400530 July 2004IR 05000461-04-005, on 04/01/2004 - 06/30/2004; Clinton Power Station; as Low as Reasonably Achievable Planning and Control and Event Follow-Up
ML08029062116 July 2004Email from S. Shields (NRR) to OPEX Daily Report - Braidwood, Et Al, Subject: DIER - Daily Industry Event Report for Monday, July 19, 2004
U-603660, 2003 Annual Radiological Environmental Operating Report27 April 20042003 Annual Radiological Environmental Operating Report
ML04029074713 February 2004Initial Ro/Sro Examination 01/2004
ML0410707076 January 2004Initial Submittal Written Exam
ML03272161125 September 2003Site Redress Plan for the Exelon Generation Company, LLC Early Site Permit
ML03272160825 September 2003Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Chapter 3 Through Figure 5.1-2
IR 05000461/200300323 April 2003IR 05000461-03-003, on 12/29/2002 - 03/31/2003, for Exelon Generator Co. LLC, Warrenville, Il DRP Integrated Report. Non-Cited Violation Noted
U-603543, Part 2 of 2, Clinton Power Station, Annual Radioactive Effluent Release Report, CPS-Offsite Dose Calculation Manual8 March 2002Part 2 of 2, Clinton Power Station, Annual Radioactive Effluent Release Report, CPS-Offsite Dose Calculation Manual
IR 05000461/199900218 March 1999Insp Rept 50-461/99-02 on 990107-0216.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering, & Plant Support
ML20206E62831 December 1998Rev 17 to ODCM for Clinton Power Station
U-602734, Annual Radioactive Effluent Release Rept for 199631 December 1996Annual Radioactive Effluent Release Rept for 1996
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly5 August 1996Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly
ML20106D06631 May 199210CFR50.59 Rept for May 1991 Through May 1992
U-601820, Proposed Tech Specs Re Operational Leakage & Reactor Coolant Leakage Detection Sys,In Response to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping7 May 1991Proposed Tech Specs Re Operational Leakage & Reactor Coolant Leakage Detection Sys,In Response to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping
IR 05000461/199001125 July 1990Safety Insp Rept 50-461/90-11 on 900512-0703.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Operational Safety,Event Followup,Radiological Controls,Maint/Surveillance,Lers,Tmi Items & Meetings
ML20044B24811 July 1990Proposed Tech Specs 4.0.5,3/4.4.3.1, RCS Leakage Detection Sys, 3/4.4.3.2, Operational Leakage, 3/4.8.3.1, Onsite Power Distribution Sys-Operating & 3/4.8.1.1, AC Sources - Operating.
ML20042E67823 April 1990LER 90-005-00:on 900322,containment Penetration Identified to Have motor-operated Valve W/Inadequate Actuator on Inboard Isolation Valve.Caused by Failure to Consider Design Capabilities of Actuators.Actuators reworked.W/900423 Ltr
IR 05000461/19870364 December 1987Insp Rept 50-461/87-36 on 871014-1125.Violation Noted.Major Areas Inspected:Offsite Review Committee,Onsite Followup of Written Repts of Nonroutine Events at Power Facilities, Operational Safety Verification & ESF Sys Walkdown
ML20215G85810 April 1987Advises That Review of Facility Reportability Matrix for Security Events,Submitted on 870304,adequate Except for Compensatory Measure Column.Matrix Must Be Revised to Ensure Compensatory Measures Taken within 10 Minutes of Event