Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML22349A64720 January 2023Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules
CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)13 June 2022and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)
IR 05000254/20200039 November 2020Integrated Inspection Report 05000254/2020003; 05000265/2020003 and 07200053/2020001
ML18124A0894 May 2018Denial of Non-Cited Violation 05000260/2016002-03, Failure to Report a Condition That Could Have Prevented Fulfillment of a Safety Function
05000296/LER-2017-00229 December 20174kV Shutdown Board Potential Transformer Primary Fuses Do Not Coordinate with Secondary Fuses
LER 17-002-00 for Browns Ferry Nuclear Plant, Unit 3 Regarding 4kV Shutdown Board Potential Transformer Primary Fuses Do Not Coordinate with Secondary Fuses
IR 05000260/201700829 November 2017NRC Special Inspection Report 05000260/2017008 and 05000296/2017008
IR 05000259/201700331 October 2017NRC Integrated Inspection Report 05000259/2017003, 05000260/2017003, and 05000296/2017003
05000296/LER-2017-00131 October 2017Inoperable Residual Heat Removal Pump Results in Condition Prohibited by Technical Specifications
LER 17-001-00 for Browns Ferry Nuclear Plant, Unit 3, Regarding Inoperable Residual Heat Removal Pump Results in Condition Prohibited by Technical Specifications
CNL-17-098, Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels27 July 2017Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels
05000260/LER-2017-0047 July 2017Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints
LER 17-004-00 for Browns Ferry, Unit 2, Regarding Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints
CNL-17-085, Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels7 July 2017Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels
05000260/LER-2017-00330 May 2017Manual Reactor Scram Initiated During Startup Due to Multiple Rods Inserting
LER 17-003-00 for Browns Ferry Nuclear Plant, Unit 2 Regarding Manual Reactor Scram Initiated During Startup Due to Multiple Rods Inserting
05000259/LER-2017-00227 April 2017Unauthorized Firearm Introduced into the Protected Area
LER 17-002-00 for Browns Ferry, Unit 1, Regarding Unauthorized Firearm Introduced into the Protected Area
05000260/LER-2017-00224 April 2017Inoperable Primary Containment Isolation Valve Resulting in Condition Prohibited by Technical Specifications
LER 17-002-00 for Browns Ferry, Unit 2, Regarding Inoperable Primary Containment Isolation Valve Resulting in Condition Prohibited by Technical Specifications
05000260/LER-2017-00114 April 2017High Pressure Coolant Injection Safety System Functional Failure Due to a Blown Fuse
LER 17-001-00 for Browns Ferry, Unit 2, Regarding High Pressure Coolant Injection Safety System Functional Failure Due to a Blown Fuse
05000259/LER-2016-00219 September 2016High Pressure Coolant Injection Safety System Functional Failure due to Inoperability of Primary Containment Isolation Valve
LER 16-002-00 for Browns Ferry, Unit 1, Regarding High Pressure Coolant Injection Safety System Functional Failure Due to Inoperability of Primary Containment Isolation Valve
05000260/LER-2016-00213 September 2016High Pressure Coolant Injection System Failure Due To Stuck Contactor
LER 16-002-00 for Browns Ferry Nuclear Plant, Unit 2, Regarding High Pressure Coolant Injection System Failure Due To Stuck Contactor
05000260/LER-2016-00116 August 2016High Pressure Coolant Injection Safety System Functional Failure due to a Blown Fuse and a Failed Relay
LER 16-001-00 for Browns Ferry, Unit 2, Regarding High Pressure Coolant Injection Safety System Functional Failure Due to a Blown Fuse and a Failed Relay
IR 05000259/201600211 August 2016NRC Integrated Inspection Report 05000259/2016002, 05000260/2016002, and 05000296/2016002
ML16225A20811 August 2016NRC Integrated Inspection Report 05000259/2016002, 05000260/2016002, and 05000296/2016002
05000296/LER-2016-0065 August 20161 OF 8
LER 16-006-00 for Browns Ferry Nuclear Plant, Unit 3, Regarding High Pressure Coolant Injection System Found to be Inoperable During Testing
05000259/LER-2016-00121 June 2016Failure of 4kV Shutdown Board Normal Feeder Breaker Results in Actuations of Emergency Diesel Generators and Containment Isolation Valves
LER 16-001-00 for Browns Ferry, Unit 1, Regarding Failure of 4kV Shutdown Board Normal Feeder Breaker Results in Actuations of Emergency Diesel Generators and Containment Isolation Valves
05000296/LER-2016-00517 June 2016Automatic Depressurization System Valve Inoperability Exceeded Technical Specification Limits
LER 16-005-00 for Browns Ferry, Unit 3, Regarding Automatic Depressurization System Valve Inoperability Exceeded Technical Specification Limits
05000296/LER-2016-0046 June 2016Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints
LER 16-004-00 for Browns Ferry, Unit 3, Regarding Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints
IR 05000296/201600113 May 2016NRC Integrated Inspection Report 05000296/2016001, January 1, 2016, Through March 31, 2016
05000296/LER-2016-00222 April 2016Improperly Installed Switch Results in Condition Prohibited by Technical Specifications
LER 16-002-00 for Browns Ferry Nuclear Plant, Unit 3, Regarding Improperly Installed Switch Results in Condition Prohibited by Technical Specifications
05000296/LER-2016-00121 March 2016Inoperable Residual Heat Removal Pump Results in Condition Prohibited by Technical Specifications and Safety System Functional Failure
LER 16-001-00 for Browns Ferry, Unit 3, Regarding Inoperable Residual Heat Removal Pump Results in Condition Prohibited by Technical Specifications and Safety System Functional Failure
05000260/LER-2015-00217 March 2016High Pressure Coolant Injection System Inoperable due to Manual Isolation of Steam Leak I
LER 15-002-01 for Browns Ferry, Unit 2, Regarding High Pressure Coolant Injection System Inoperable Due to Manual Isolation of Steam Leak
ML15342A3737 December 2015Initial Exam 2015-302 Final SRO Written Exam
ML15040A5819 February 2015Initial Exam 2015-301 Final SRO Written Exam
ML14154A3732 June 2014Initial Exam 2014-301 Draft SRO Written Exam
ML14142A16121 May 201405202014 Final Browns Ferry 2014-301 SRO Written Exam
IR 05000259/201301427 January 2014IR 05000259-13-014, 05000260-13-014, 05000296-13-014; 12/02/2013 - 12/13/2013; Browns Ferry Nuclear Plant, Unit 1, 2, & 3; Follow-up Inspection - Inspection Procedure (IP) 92702
IR 05000259/201200922 August 2013IR 05000259-13-011, 05000260-13-011,05000296-13-011;05/24/2013; Browns Ferry Nuclear Plant - NRC Supplemental 95003 Inspection Report
IR 05000259/201301122 August 2013IR 05000259-13-011, 05000260-13-011,05000296-13-011;05/24/2013; Browns Ferry Nuclear Plant - NRC Supplemental 95003 Inspection Report
ML13191A8799 July 2013Initial 2013-301 Final SRO Written Exam
ML12331A31423 November 2012Initial Exam 2012-301 Final Administrative JPMs
IR 05000259/201200413 November 2012IR 05000259-12-004, 05000260-12-004, 05000296-12-004, on 07/01/2012 - 09/30/2012, Browns Ferry Nuclear Plant, Units 1, 2 and 3, Identification and Resolution of Problems, and Event Follow-up
IR 05000259/201200728 May 2012IR 05000259-12-007, 05000260-12-007; 05000296-12-007, 02/06/2012 - 03/01/2012; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Identification and Resolution of Problems
IR 05000259/201100513 February 2012IR 05000259-11-005, 05000260-11-005, 05000296-11-005; 10/01/2011 -12/31/2011; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Event Follow-up
ML11271003328 September 2011ROP Tabletop Examples and Results
ML11237011124 August 2011Initial Exam 2011-302 Final SRO Written Exam
ML11216A1184 August 2011Submittal of Reference Documents Related to EA-11-018 for Browns Ferry Nuclear Plant Unit 1
ML1115401933 June 2011Response to Disputed Notice of Violation (EA-11-012)
IR 05000259/201100213 May 2011IR 05000259-11-002, 05000260-11-002, 05000296-11-002 & 07200052-11-002, on 01/01/2011 - 03/31/2011, Browns Ferry, Units 1, 2 & 3, NRC Integrated Inspection and Notice of Violation
ML1110105934 April 2011Initial Exam 2011-301 Final RO-SRO Written Exam Working Copy
ML1103801293 February 2011Response to Request for Additional Information Regarding American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection Program for the 4th Ten-Year Inspection Interval
ML10252012016 August 2010Initial Exam 2010-301 Draft SRO Written Exam
ML10092054231 March 2010American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, Inservice Inspection Program for the Fourth Ten-Year Inspection Interval
IR 05000259/20090052 February 2010IR 05000259-09-005, 05000260-09-005, and 05000296-09-005; 10/01/2009 - 12/31/2009; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Event Follow-Up