ML22349A647 | 20 January 2023 | Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules |
CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) | 13 June 2022 | and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) |
IR 05000254/2020003 | 9 November 2020 | Integrated Inspection Report 05000254/2020003; 05000265/2020003 and 07200053/2020001 |
ML18124A089 | 4 May 2018 | Denial of Non-Cited Violation 05000260/2016002-03, Failure to Report a Condition That Could Have Prevented Fulfillment of a Safety Function |
05000296/LER-2017-002 | 29 December 2017 | 4kV Shutdown Board Potential Transformer Primary Fuses Do Not Coordinate with Secondary Fuses LER 17-002-00 for Browns Ferry Nuclear Plant, Unit 3 Regarding 4kV Shutdown Board Potential Transformer Primary Fuses Do Not Coordinate with Secondary Fuses |
IR 05000260/2017008 | 29 November 2017 | NRC Special Inspection Report 05000260/2017008 and 05000296/2017008 |
IR 05000259/2017003 | 31 October 2017 | NRC Integrated Inspection Report 05000259/2017003, 05000260/2017003, and 05000296/2017003 |
05000296/LER-2017-001 | 31 October 2017 | Inoperable Residual Heat Removal Pump Results in Condition Prohibited by Technical Specifications LER 17-001-00 for Browns Ferry Nuclear Plant, Unit 3, Regarding Inoperable Residual Heat Removal Pump Results in Condition Prohibited by Technical Specifications |
CNL-17-098, Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels | 27 July 2017 | Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels |
05000260/LER-2017-004 | 7 July 2017 | Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints LER 17-004-00 for Browns Ferry, Unit 2, Regarding Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints |
CNL-17-085, Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels | 7 July 2017 | Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels |
05000260/LER-2017-003 | 30 May 2017 | Manual Reactor Scram Initiated During Startup Due to Multiple Rods Inserting LER 17-003-00 for Browns Ferry Nuclear Plant, Unit 2 Regarding Manual Reactor Scram Initiated During Startup Due to Multiple Rods Inserting |
05000259/LER-2017-002 | 27 April 2017 | Unauthorized Firearm Introduced into the Protected Area LER 17-002-00 for Browns Ferry, Unit 1, Regarding Unauthorized Firearm Introduced into the Protected Area |
05000260/LER-2017-002 | 24 April 2017 | Inoperable Primary Containment Isolation Valve Resulting in Condition Prohibited by Technical Specifications LER 17-002-00 for Browns Ferry, Unit 2, Regarding Inoperable Primary Containment Isolation Valve Resulting in Condition Prohibited by Technical Specifications |
05000260/LER-2017-001 | 14 April 2017 | High Pressure Coolant Injection Safety System Functional Failure Due to a Blown Fuse LER 17-001-00 for Browns Ferry, Unit 2, Regarding High Pressure Coolant Injection Safety System Functional Failure Due to a Blown Fuse |
05000259/LER-2016-002 | 19 September 2016 | High Pressure Coolant Injection Safety System Functional Failure due to Inoperability of Primary Containment Isolation Valve LER 16-002-00 for Browns Ferry, Unit 1, Regarding High Pressure Coolant Injection Safety System Functional Failure Due to Inoperability of Primary Containment Isolation Valve |
05000260/LER-2016-002 | 13 September 2016 | High Pressure Coolant Injection System Failure Due To Stuck Contactor LER 16-002-00 for Browns Ferry Nuclear Plant, Unit 2, Regarding High Pressure Coolant Injection System Failure Due To Stuck Contactor |
05000260/LER-2016-001 | 16 August 2016 | High Pressure Coolant Injection Safety System Functional Failure due to a Blown Fuse and a Failed Relay LER 16-001-00 for Browns Ferry, Unit 2, Regarding High Pressure Coolant Injection Safety System Functional Failure Due to a Blown Fuse and a Failed Relay |
IR 05000259/2016002 | 11 August 2016 | NRC Integrated Inspection Report 05000259/2016002, 05000260/2016002, and 05000296/2016002 |
ML16225A208 | 11 August 2016 | NRC Integrated Inspection Report 05000259/2016002, 05000260/2016002, and 05000296/2016002 |
05000296/LER-2016-006 | 5 August 2016 | 1 OF 8 LER 16-006-00 for Browns Ferry Nuclear Plant, Unit 3, Regarding High Pressure Coolant Injection System Found to be Inoperable During Testing |
05000259/LER-2016-001 | 21 June 2016 | Failure of 4kV Shutdown Board Normal Feeder Breaker Results in Actuations of Emergency Diesel Generators and Containment Isolation Valves LER 16-001-00 for Browns Ferry, Unit 1, Regarding Failure of 4kV Shutdown Board Normal Feeder Breaker Results in Actuations of Emergency Diesel Generators and Containment Isolation Valves |
05000296/LER-2016-005 | 17 June 2016 | Automatic Depressurization System Valve Inoperability Exceeded Technical Specification Limits LER 16-005-00 for Browns Ferry, Unit 3, Regarding Automatic Depressurization System Valve Inoperability Exceeded Technical Specification Limits |
05000296/LER-2016-004 | 6 June 2016 | Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints LER 16-004-00 for Browns Ferry, Unit 3, Regarding Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints |
IR 05000296/2016001 | 13 May 2016 | NRC Integrated Inspection Report 05000296/2016001, January 1, 2016, Through March 31, 2016 |
05000296/LER-2016-002 | 22 April 2016 | Improperly Installed Switch Results in Condition Prohibited by Technical Specifications LER 16-002-00 for Browns Ferry Nuclear Plant, Unit 3, Regarding Improperly Installed Switch Results in Condition Prohibited by Technical Specifications |
05000296/LER-2016-001 | 21 March 2016 | Inoperable Residual Heat Removal Pump Results in Condition Prohibited by Technical Specifications and Safety System Functional Failure LER 16-001-00 for Browns Ferry, Unit 3, Regarding Inoperable Residual Heat Removal Pump Results in Condition Prohibited by Technical Specifications and Safety System Functional Failure |
05000260/LER-2015-002 | 17 March 2016 | High Pressure Coolant Injection System Inoperable due to Manual Isolation of Steam Leak I LER 15-002-01 for Browns Ferry, Unit 2, Regarding High Pressure Coolant Injection System Inoperable Due to Manual Isolation of Steam Leak |
ML15342A373 | 7 December 2015 | Initial Exam 2015-302 Final SRO Written Exam |
ML15040A581 | 9 February 2015 | Initial Exam 2015-301 Final SRO Written Exam |
ML14154A373 | 2 June 2014 | Initial Exam 2014-301 Draft SRO Written Exam |
ML14142A161 | 21 May 2014 | 05202014 Final Browns Ferry 2014-301 SRO Written Exam |
IR 05000259/2013014 | 27 January 2014 | IR 05000259-13-014, 05000260-13-014, 05000296-13-014; 12/02/2013 - 12/13/2013; Browns Ferry Nuclear Plant, Unit 1, 2, & 3; Follow-up Inspection - Inspection Procedure (IP) 92702 |
IR 05000259/2012009 | 22 August 2013 | IR 05000259-13-011, 05000260-13-011,05000296-13-011;05/24/2013; Browns Ferry Nuclear Plant - NRC Supplemental 95003 Inspection Report |
IR 05000259/2013011 | 22 August 2013 | IR 05000259-13-011, 05000260-13-011,05000296-13-011;05/24/2013; Browns Ferry Nuclear Plant - NRC Supplemental 95003 Inspection Report |
ML13191A879 | 9 July 2013 | Initial 2013-301 Final SRO Written Exam |
ML12331A314 | 23 November 2012 | Initial Exam 2012-301 Final Administrative JPMs |
IR 05000259/2012004 | 13 November 2012 | IR 05000259-12-004, 05000260-12-004, 05000296-12-004, on 07/01/2012 - 09/30/2012, Browns Ferry Nuclear Plant, Units 1, 2 and 3, Identification and Resolution of Problems, and Event Follow-up |
IR 05000259/2012007 | 28 May 2012 | IR 05000259-12-007, 05000260-12-007; 05000296-12-007, 02/06/2012 - 03/01/2012; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Identification and Resolution of Problems |
IR 05000259/2011005 | 13 February 2012 | IR 05000259-11-005, 05000260-11-005, 05000296-11-005; 10/01/2011 -12/31/2011; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Event Follow-up |
ML112710033 | 28 September 2011 | ROP Tabletop Examples and Results |
ML112370111 | 24 August 2011 | Initial Exam 2011-302 Final SRO Written Exam |
ML11216A118 | 4 August 2011 | Submittal of Reference Documents Related to EA-11-018 for Browns Ferry Nuclear Plant Unit 1 |
ML111540193 | 3 June 2011 | Response to Disputed Notice of Violation (EA-11-012) |
IR 05000259/2011002 | 13 May 2011 | IR 05000259-11-002, 05000260-11-002, 05000296-11-002 & 07200052-11-002, on 01/01/2011 - 03/31/2011, Browns Ferry, Units 1, 2 & 3, NRC Integrated Inspection and Notice of Violation |
ML111010593 | 4 April 2011 | Initial Exam 2011-301 Final RO-SRO Written Exam Working Copy |
ML110380129 | 3 February 2011 | Response to Request for Additional Information Regarding American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection Program for the 4th Ten-Year Inspection Interval |
ML102520120 | 16 August 2010 | Initial Exam 2010-301 Draft SRO Written Exam |
ML100920542 | 31 March 2010 | American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, Inservice Inspection Program for the Fourth Ten-Year Inspection Interval |
IR 05000259/2009005 | 2 February 2010 | IR 05000259-09-005, 05000260-09-005, and 05000296-09-005; 10/01/2009 - 12/31/2009; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Event Follow-Up |