Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23348A21615 December 2023Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0030 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting))
RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information10 November 2023Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information
ML23304A02230 October 2023NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Braidwood 1 & 2 - Exemption from Security Rule (L-2023-LLE-0030)
ML21008A42217 December 2020Technical Requirements Manual
ML20141L63610 July 2020Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2
JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability22 June 2020Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability
ML18067A1814 June 2018Correction to Technical Specification Amendment Identification Format
ML18117A05727 April 20182017 Radioactive Effluent Release Report
ML20311A6406 November 20172017 Q1-Q4 ROP Inspection Findings
ML17163A35531 August 2017Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490)
ML17088A7035 July 2017Issuance of Amendments to Regarding Request to Delete Obsolete License Conditions and Make Administrative Changes to Technical Specifications (CAC Nos. MF9338-MF9341)
ML17132A39612 May 20172016 Radioactive Effluent Release Report
ML17118A05728 April 2017Transmittal of 2016 Radioactive Effluent Release Report
RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process28 March 2017Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process
ML16357A54915 December 2016Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements Manual
RS-16-248, Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements Manual15 December 2016Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements Manual
05000456/LER-2016-00219 July 2016Inadequate Protection from Tornado Missiles Identified Due to Non-Conforming Design Conditions
LER 16-002-00 for Braidwood, Unit 1, Regarding Inadequate Protection from Tornado Missiles Identified Due to Non-Conforming Design Conditions
ML15336A73127 January 2016TS 50456-Bwd-AppsABC
ML15286A27619 November 2015Technical Specifications
IR 05000456/201400413 November 2014IR 05000456/2014004; 05000457/2014004 and 07200073/2014001; 07/01/2014 - 09/30/2014; Braidwood Station, Units 1 & 2; Flood Protection Measures; Operability Determinations and Functionality Assessments; Post-Maintenance Testing; Emergency Pr
IR 05000456/20120057 February 2013IR 05000456-12-005 & 05000457-12-005, 10/01/2012 - 12/31/2012, Braidwood Station, Units 1 & 2, Flooding, Operability Determinations and Functionality Assessments; Surveillance Testing
ML12314A0838 November 2012Nuclear Regulatory Commission Integrated Inspection Report 05000456-12-004; 05000457-12-004 and Notice of Violation
IR 05000456/201100510 February 2012IR 05000456-11-005, 05000457-11-005, on 10/01/2011 ?12/31/2011, Braidwood Station, Units 1 & 2, Equipment Alignment, Maintenance Effectiveness, Operability Determinations and Functional Assessments, Surveillance Testing, Other Activities
IR 05000456/201000214 May 2010IR 05000456-10-002, 05000457-10-002, on 01/01/2010 - 03/31/2010, Braidwood Station, Units 1 & 2, Operability Evaluations, Plant Modifications, Event Follow-Up, and Other Activities
IR 05000456/20100076 May 2010IR 05000456-10-007 & 05000457-10-007, on 03/01/2010 - 04/02/2010; Braidwood Station; Component Design Bases Inspection (CDBI)
ML14030A28828 February 2010Plan Completion Report for the VB 7 Area
RS-14-029, Plan Completion Report for the VB 7 Area28 February 2010Plan Completion Report for the VB 7 Area
IR 05000456/200900730 November 2009IR 05000456-09-007; 6/24/09 - 11/3/09; Braidwood Station Unit 1; Surveillance Testing
RS-14-029, Plan Completion Report for the VB 6 Area31 August 2009Plan Completion Report for the VB 6 Area
ML14030A28731 August 2009Plan Completion Report for the VB 6 Area
IR 05000456/200900619 March 2009IR 05000456-09-006, 05000457-09-006, on 01/26/2009 - 03/06/2009, Braidwood Station, Units 1 and 2, Routine Triennial Fire Protection Baseline Inspection
ML08247030528 August 2008Technical Specifications, TSTF Change Traveler TSTF-479 & TSTF-497
ML07354107620 December 2007Ro/Sro Initial Examination
RS-07-044, Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program8 August 2007Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program
Information Notice 2006-13, Ground-Water Contamination Due To Undetected Leakage of Radioactive Water10 July 2006Ground-Water Contamination Due To Undetected Leakage of Radioactive Water
IR 05000456/20050129 December 2005IR 05000456-05-012(DRP), 05000457-05-012(DRP); 10/11/2005 - 10/24/2005; Braidwood Station, Units 1 and 2. Identification and Resolution of Problems
IR 05000456/20050089 November 2005IR 05000456-05-008, 05000457-05-008; on 07/01/2005 - 09/30/2005; Braidwood Station, Units 1 & 2; Other Activities
ML0511202865 April 20054/5/05, Braidwood - TS 134 - License Amd to Increase Flexibility in Mode Restraints
ML08029062116 July 2004Email from S. Shields (NRR) to OPEX Daily Report - Braidwood, Et Al, Subject: DIER - Daily Industry Event Report for Monday, July 19, 2004
IR 05000456/200400323 April 2004IR 05000456-04-003, IR 05000457-04-003, on 01/01/04 - 03/31/04, for Braidwood Station, Units 1 and 2; Routine Integrated Inspection Report
ML02128029830 April 2002Byron/Braidwood, Units 1 and 2, Tech. Spec. Pages for Amendment Nos. 128 and 123 - Review Surveillance Requirement 3.0.3 to Extend the Delay Period, Before Entering a Limiting Condition for Operation Following a Missed Surveillance
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly5 August 1996Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly
ML20096E65118 January 1996Part 21 Rept Re Failure of MOV Motor Pinion Gear Mfg by Limitorque at Byron Station.Replacement & Insp Activities Initiated for Potentially Impacted Populations of MOVs at Byron & Braidwood Stations
ML20071J18922 July 1994Final Part 21 Rept Re Cracks Found in Body to Bonnet Nuts on Copes-Vulcan Airoperated Valves.Operability Evaluation for Byron Units 1 & 2,of Affected Valves W/Nuts of Heat Numbers H & I Completed on 940622
ML20205R9981 April 1987Affidavit of Jt Louden Re Review of Lk Comstock Welding Procedures,Including Specs & Supporting Procedure Qualification Records in Effect from 841109-851231.Joint Welding Procedure Specs Encl
ML20214A81710 June 1986Applicant Exhibit A-11,consisting of 841205 Rev F to 4.3.3, Welding Procedure for Structural Attachments (7018). Related Info Encl
ML20133P65829 October 1985Transcript of 851029 Evidentiary Hearing in Joliet,Il.Pp 369-564.Supporting Documentation Encl