Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML19225D19713 August 2019Independent Spent Fuel Storage Facility - Application for Approval of Indirect Transfer of Control of Licenses
ML11216A1393 February 2011Comment (3) of Arizona Public Service Co on Proposed Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notifications
IR 05000529/20033018 May 2003May 2003 Retake Exam 50-529-2003-301 Final JPMs & Outline
Information Notice 1998-12, Licensees' Responsibilities Regarding Reporting & Follow-up Requirements for Nuclear-Powered Pacemakers3 April 1998Licensees' Responsibilities Regarding Reporting & Follow-up Requirements for Nuclear-Powered Pacemakers
ML20203L55225 February 1998Forwards Comments on Draft Reg Guide DG-5008, Reporting of Safeguards Events
Information Notice 1998-01, Thefts of Portable Gauges15 January 1998Thefts of Portable Gauges
ML17310B26329 April 1994Requests Exemption from Certain Requirements of 10CFR73.55 (d)(5) & Requirements for Physical Protection Against Radiological Sabotage
Information Notice 1993-18, Portable Moisture-Density Gauge User Responsibilities During Field Operations10 March 1993Portable Moisture-Density Gauge User Responsibilities During Field Operations
ML08269057228 March 1988NRC Information Notice No. 87-44, Supplement 1: Thimble Tube Thinning in Westinghouse Reactors
Information Notice 1988-08, Chemical Reactions with Radioactive Waste Solification Agents14 March 1988Chemical Reactions with Radioactive Waste Solification Agents
Information Notice 1988-07, Inadvertent Transfer of Licensed Material to Uncontrolled Locations7 March 1988Inadvertent Transfer of Licensed Material to Uncontrolled Locations
Information Notice 1988-06, Foreign Objects in Steam Generators29 February 1988Foreign Objects in Steam Generators
Information Notice 1988-05, Fire in Annunciator Control Cabinets12 February 1988Fire in Annunciator Control Cabinets
Information Notice 1988-04, Inadequate Qualification and Documentation of Fire Barrier Penetration Seals5 February 1988Inadequate Qualification and Documentation of Fire Barrier Penetration Seals
Information Notice 1988-03, Cracks in Shroud Support Access Hole Cover Welds2 February 1988Cracks in Shroud Support Access Hole Cover Welds
Information Notice 1987-62, Mechanical Failure of Indicating-Type Fuses8 December 1987Mechanical Failure of Indicating-Type Fuses
Information Notice 1987-61, Failure of Westinghouse W-2-Type Circuit Breaker Cell Switches7 December 1987Failure of Westinghouse W-2-Type Circuit Breaker Cell Switches
Information Notice 1987-60, Depressurization of Reactor Coolant Systems in Pressurized-Water Reactors4 December 1987Depressurization of Reactor Coolant Systems in Pressurized-Water Reactors
Information Notice 1987-57, Loss of Emergency Boration Capability Due to Nitrogen Gas Intrusion6 November 1987Loss of Emergency Boration Capability Due to Nitrogen Gas Intrusion
Information Notice 1987-56, Improper Hydraulic Control Unit Installation at BWR Plants4 November 1987Improper Hydraulic Control Unit Installation at BWR Plants
Information Notice 1987-55, Portable Moisture/Density Gauges: Recent Incidents of Portable Gauges Being Stolen or Lost29 October 1987Portable Moisture/Density Gauges: Recent Incidents of Portable Gauges Being Stolen or Lost
ML20214H40314 October 1986Transcript of R Zimmerman 861014 Deposition in Phoenix,Az. Pp 1-108
ML20214H53110 October 1986Transcript of MD Schuster 861010 Desposition.Pp 1-81
Information Notice 1986-67, Portable Moisture/Density Gauges; Recent Incidents and Common Violations of Requirements for Use, Transportation, and Storage15 August 1986Portable Moisture/Density Gauges; Recent Incidents and Common Violations of Requirements for Use, Transportation, and Storage
ML20210A4493 November 1983Partially Withheld Investigation Rept 5-82-009 on 820526- 830408.Major Areas Investigated:Allegations Re Deficiencies in Electrical Sys.No Further Investigative Effort Re Allegation 1 Warranted & Investigation Closed
ML20072K65226 January 1983Public Version of Rev 1 to Emergency Plan Implementing Procedure EPIP-14B, Dose Assessment & Rev 0 to Procedures EPIP-01 Through EPIP-14A & EPIP-15 Through EPIP-55.Revised Index Encl
ML20128N17029 June 1982Transcript of Interview of HR Nunez on 820629 Re Responses to Allegations.Pp 1-44.Info Deleted
ML20127P51829 June 1982Transcript of Tape Recorded 820629 Interview W/Hr Nunez Re Allegation of Falsification of Termination Cards for Work at Facilities
ML20127P70916 June 1982Transcript of Interview W/K Wallerstein by Ej Power & Oc Shuckleton Re Allegations of Falsification of Termination Cards for Work at Facilities
ML18192A39230 June 1975Public Service Company of New Mexico and Subsidiary. Interim Consolated Financial Statements. (Subject to Year End Audit Adjustment