Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML11256A0519 September 2011Application for Consent to Proposed License Transfers: Request for Threshold Determination
ML05227007318 April 2005Event Notification Report for April 18, 2005
ML0434400148 December 2004M041208A - Affirmation Session: I. SECY-04-0180 (Rio Rancho); Ii. SECY-04-0190 (Portable Gauges); Iii. SECY-04-0192 (Rene Chun); Iv. SECY-04-0208 (Louisiana Energy Services); V. SECY-04-0212 (Millstone); Vi. SECY-04-0216 Catawba
ML0222004848 August 2002Memorandum and Order (Denying Request for Evidentiary Hearing on Reopened Contention 4, and Terminating Proceeding)
ML0210600763 April 2002Letter from David A. Repka Forwarding Dominion Nuclear Connecticut'S Response, Dated 03/28/2002, to the Apparent Violations Noted in IR 05000245/2001-013
ML0210702102 April 2002Transcript of Hearing Held in Mystic, CT on 04/02/02; Pp. 698 - 859
ML02102032828 March 2002Response to Apparent Violations in Inspection Report No.05000245/2001013
ML02092040418 March 2002Connecticut Coalition Against Millstone and Long Island Coalition Against Millstone Detailed Written Summary Pursuant to 10 CFR Section 2.1113
ML02081057115 March 2002Letter from David A. Repka to ASLBP Enclosing Exhibits 1 Through 5 for Dnc'S 03/18/2002 Filing, Summary of Facts, Data and Arguments on Which Dominion Nuclear Connecticut Will Rely at the Reopened Proceeding Subpart K Oral Argument
ML0205800167 November 2001Intervenors' First Set of Interrogatories and Request for Production in the Reopened Proceedings Directed to Dominion Nuclear Connecticut, Inc. and Northeast Nuclear Energy Company
Information Notice 1998-12, Licensees' Responsibilities Regarding Reporting & Follow-up Requirements for Nuclear-Powered Pacemakers3 April 1998Licensees' Responsibilities Regarding Reporting & Follow-up Requirements for Nuclear-Powered Pacemakers
Information Notice 1998-01, Thefts of Portable Gauges15 January 1998Thefts of Portable Gauges
ML20149M24328 October 1996Forwards Article from Hartford Courant Published by M Mcintire on 961028 Re Millstone Nuclear Plant
ML20216D91229 May 1996Transcript of 960529 Interview of J Carter in Newton,Ct. Pp 1-84.W/addl Pages Listing Corrections to Transcript. Transcript Partially Deleted,Per Exemption 6
Information Notice 1993-18, Portable Moisture-Density Gauge User Responsibilities During Field Operations10 March 1993Portable Moisture-Density Gauge User Responsibilities During Field Operations
ML08269057228 March 1988NRC Information Notice No. 87-44, Supplement 1: Thimble Tube Thinning in Westinghouse Reactors
Information Notice 1988-08, Chemical Reactions with Radioactive Waste Solification Agents14 March 1988Chemical Reactions with Radioactive Waste Solification Agents
Information Notice 1988-07, Inadvertent Transfer of Licensed Material to Uncontrolled Locations7 March 1988Inadvertent Transfer of Licensed Material to Uncontrolled Locations
Information Notice 1988-06, Foreign Objects in Steam Generators29 February 1988Foreign Objects in Steam Generators
Information Notice 1988-05, Fire in Annunciator Control Cabinets12 February 1988Fire in Annunciator Control Cabinets
Information Notice 1988-04, Inadequate Qualification and Documentation of Fire Barrier Penetration Seals5 February 1988Inadequate Qualification and Documentation of Fire Barrier Penetration Seals
Information Notice 1988-03, Cracks in Shroud Support Access Hole Cover Welds2 February 1988Cracks in Shroud Support Access Hole Cover Welds
Information Notice 1987-62, Mechanical Failure of Indicating-Type Fuses8 December 1987Mechanical Failure of Indicating-Type Fuses
Information Notice 1987-61, Failure of Westinghouse W-2-Type Circuit Breaker Cell Switches7 December 1987Failure of Westinghouse W-2-Type Circuit Breaker Cell Switches
Information Notice 1987-60, Depressurization of Reactor Coolant Systems in Pressurized-Water Reactors4 December 1987Depressurization of Reactor Coolant Systems in Pressurized-Water Reactors
Information Notice 1987-57, Loss of Emergency Boration Capability Due to Nitrogen Gas Intrusion6 November 1987Loss of Emergency Boration Capability Due to Nitrogen Gas Intrusion
Information Notice 1987-56, Improper Hydraulic Control Unit Installation at BWR Plants4 November 1987Improper Hydraulic Control Unit Installation at BWR Plants
Information Notice 1987-55, Portable Moisture/Density Gauges: Recent Incidents of Portable Gauges Being Stolen or Lost29 October 1987Portable Moisture/Density Gauges: Recent Incidents of Portable Gauges Being Stolen or Lost
Information Notice 1986-67, Portable Moisture/Density Gauges; Recent Incidents and Common Violations of Requirements for Use, Transportation, and Storage15 August 1986Portable Moisture/Density Gauges; Recent Incidents and Common Violations of Requirements for Use, Transportation, and Storage