Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML22021B6601 February 2022Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1
ML21277A19316 November 2021Enclosure 2, Draft Conforming License Amendments
ML19046A2228 February 2019NRC-2019-000158 - Resp 1 - Final. Agency Records Subject to the Request Are Enclosed
ML18052A95021 February 2018Restoration Project: License Termination Plan, Chapter 2, Revision 2, Site Characterization
ML18052A95621 February 2018Restoration Project: License Termination Plan, Chapter 5, Revision 2, Final Status Survey Plan
ZS-2018-0008, ZS-LT-100-001-001, Rev 2, Characterization Survey Package Development.7 November 2017ZS-LT-100-001-001, Rev 2, Characterization Survey Package Development.
ML17215A13920 July 2017Restoration Project License Termination Plan Chapter 5, Revision 1 Final Status Survey Plan.
ML17215A13620 July 2017Restoration Project License Termination Plan Chapter 2, Revision 1 Site Characterization.
ML17215A13720 July 2017Restoration Project License Termination Plan Chapter 3, Revision 1 Identification of Remaining Site Dismantlement Activities.
ML17194A32722 March 2017E-Mail from Jerry Houff, Zion Solutions to John Hickman, Nrg, Dated March 22, 2017, Forwarding Continuing Characterization Plan
ML17194A33322 March 2017E-Mail from Jerry Houff, Zion Solutions to John Hickman, NRC, Dated March 22, 2017, Forwarding ZS-LT-100-001, Rev. 1 - Characterization Survey Package Development
ML17208A12327 February 2017Ltp Ch 3 Rev 1 021317 L
ML17208A12627 February 2017Ltp Ch 5 Rev 1 022617 L
ML17208A12227 February 2017Ltp Ch 2 Rev 1 022017 L
ML17194A33128 October 2016E-Mail from Gerry Van Noordennen, Zion Solutions, to John Hickman, Nrc, Dated October 28, 2016, Forwarding ZS-L T-400-001-001, Rev. 3, Unconditional Release of Material, Equipment and Secondary Structures, and ZS-LT-400-001-002, Rev 2, ...
ML17129A32819 January 2016ZS-LT-300-001-001, Rev. 2 - Frs Package Development
ML18255A01723 December 2015Revised Final Report-Independent Confirmatory Survey Summary and Results for the Crib House and Non-Impacted Open Land Areas at the Zion Nuclear Power Station, Zion, Illinois, Dated December 23, 2015
ML17129A32915 October 2015ZS-LT-300-001-003, Rev. 2 - Isolation and Control for Final Radiation Survey
ML15245A52531 August 2015Final Report - Independent Confirmatory Survey Summary and Results for the Crib House and Non-Impacted Open Land Areas at the Zion Nuclear Power Station, Zion, Illinois (Rfta No. 15-005); Dcn 5271-SR-01-0
ZS-2015-0116, License Termination Plan Table 3-2 Replacement22 July 2015License Termination Plan Table 3-2 Replacement
ML15344A35821 May 2015ZS-SA-01, Revision 6, Restoration Project Health & Safety Plan
ML17129A33115 April 2015ZS-LT-400-001-001, Rev. 3, Unconditional Release Materials, Equipment and Secondary Structures
ML15005A33019 December 2014License Amendment Request for the License Termination Plan
ZS-2014-0413, Restoration Project License Termination Plan Chapter 4 Remediation Plan19 December 2014Restoration Project License Termination Plan Chapter 4 Remediation Plan
NRC Generic Letter 1998-0414 July 1998NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i
IR 05000295/199702324 March 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/97-23 & 50-304/97-23.Actions Will Be Examined During Future Insp
A98009, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-02 & 50-304/97-02.Corrective Actions:Wa Pope Raychem Training Documentation Was Reviewed for Contractor Electricians Who Installed Raychem Splice on 97072426 February 1998Responds to NRC Re Violations Noted in Insp Repts 50-295/97-02 & 50-304/97-02.Corrective Actions:Wa Pope Raychem Training Documentation Was Reviewed for Contractor Electricians Who Installed Raychem Splice on 970724
ML20199G19427 January 1998Forwards Insp Repts 50-295/97-23 & 50-304/97-23 on 970908-1216 & Nov.Violation Involved Failure to Adhere to Scaffolding Procedure Requirements & Failure to Ensure That Proficiency & Qualifications Were Adequately Achieved
ML20199G32727 January 1998Notice of Violation from Insp on 970908-1216.Violation Noted:As of 970724,licensee Failed to Ensure That Training Provided to Selected Contractor Craft & Quality Control Insp Personnel Performing Raychem Splice Applications
ML20199G34627 January 1998Insp Repts 50-295/97-23 & 50-304/97-23 on 970908-1216. Violations Noted.Major Areas Inspected:Engineering
A97016, Provides Response to 970107 RAI Concerning Containment Coatings at Plant5 September 1997Provides Response to 970107 RAI Concerning Containment Coatings at Plant
IR 05000295/199701628 August 1997Insp Repts 50-295/97-16 & 50-304/97-16 on 970530-0718. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering
A97014, Responds to RAI Re Third Interval ISI Relief Request CR-13 & New Relief Request CR-2313 August 1997Responds to RAI Re Third Interval ISI Relief Request CR-13 & New Relief Request CR-23
ML20216E80431 July 1997Evaluation of Paint Chip Head Loss on Vertically Oriented Zion Station Strainer Screen July 1997 Test Phases. W/Two Oversize Drawings
ML20196J42231 July 1997Forwards Summary of Changes Made at Zion,Units 1 & 2 During 1996,per 10CFR50.59(b)(2).Descriptions of Changes,Including Summaries of Applicable Safety Evaluations,Encl
ML20148U05723 June 1997Forwards NRC Oversight Panel Meeting Summaries of Meetings Held W/Zion Station within Past Months & Open to Public Observation.Encl 2 Contains Handouts Provided During Meetings
ML20217D54618 April 1997Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission
IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission18 April 1997Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission
A97002, Responds to NRC Re Violations Noted in Insp Repts 50-295/96-11 & 50-304/96-11.Corrective Actions:Clarifed Mgt Expectations to Workforce,Revised Procedures & Conducted Enhanced Safety Evaluation Training.Payment Encl.W/O Encl11 April 1997Responds to NRC Re Violations Noted in Insp Repts 50-295/96-11 & 50-304/96-11.Corrective Actions:Clarifed Mgt Expectations to Workforce,Revised Procedures & Conducted Enhanced Safety Evaluation Training.Payment Encl.W/O Encl
ML20136G62512 March 1997Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Violation Noted:On 960318 Licensee Did Not Perform Adequate Safety Evaluation to Determine If Temporary Alteration 96-014 Constituted Safety Questions
A97001, Responds to NRC Re Violations Noted in Insp Repts 50-295/96-14,50-304/96-14,50-295/96-17 & 50-304/96-17. Corrective Actions:Equipment Attendant Removed from Assigned Duties6 March 1997Responds to NRC Re Violations Noted in Insp Repts 50-295/96-14,50-304/96-14,50-295/96-17 & 50-304/96-17. Corrective Actions:Equipment Attendant Removed from Assigned Duties
IR 05000295/19960173 February 1997Insp Repts 50-295/96-17 & 50-304/96-17 on 961012-1206. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering
IR 05000295/199600130 January 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/96-01 & 50-304/96-01 on 961223
ML20134A24722 January 1997Responds to NRC Re Violations Noted in Insp Repts 50-295/96-13 & 50-304/96-13.Corrective actions:C-E Issued CEN-628-P,rev 1 to Address Resolution of Problems
ML20135B68527 November 1996Predecisonal Enforcement Conference Repts 50-295/96-11 & 50-304/96-11 on 961112.No Violations Noted.Areas Discussed: Apparent Violations Identified During 960722-0822 Insp Along W/Corrective Actions Taken or Planned by Licensee
ML20135A73525 November 1996Responds to NRC Re Violations Noted in Insp Repts 50-295/96-10 & 50-304/96-10.Corrective Actions:Revises Procedure Zrp 5820-12,implemented Operations Performance Plan & Inspected Affected Fuel Assemblies
IR 05000295/199601621 November 1996Insp Repts 50-295/96-16 & 50-304/96-16 on 960923-1024. Violations Noted.Major Areas Insp:Radiation Protection Program
ML20129E34022 October 1996Insp Repts 50-295/96-11 & 50-304/96-11 on 960722-0822. Violations Noted.Major Areas Inspected:Team Insp of Engineering & Technical Support
ML20129F11222 October 1996Insp Repts 50-295/96-10 & 50-304/96-10 on 960713-0829. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security
ML20129F07616 September 1996Insp Repts 50-295/96-08 & 50-304/96-08 on 960608-0726. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support