Issue date | Title | |
---|---|---|
IR 05000250/2023002 | 14 August 2023 | Integrated Inspection Report 05000250/2023002 and 05000251/2023002 |
IR 05000250/2020004 | 11 February 2021 | Integrated Inspection Report 05000250/2020004 and 05000251/2020004 and Independent Spent Fuel Storage Installation Inspection (ISFSI) 07200062/2020002 |
L-2019-019, Subsequent License Renewal Application Safety Review - December 20, 2018 Public Meeting Action Item Responses | 31 January 2019 | Subsequent License Renewal Application Safety Review - December 20, 2018 Public Meeting Action Item Responses |
ML18232A576 | 21 August 2018 | Plan for On-Site Regulatory Audit Regarding the Subsequent License Renewal Application Review |
L-2017-213, License Amendment Request 256, One-Time Extension of 3A Containment Spray (CS) Pump Completion Time | 18 December 2017 | License Amendment Request 256, One-Time Extension of 3A Containment Spray (CS) Pump Completion Time |
ML20311A347 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
ML20311A340 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
IR 05000250/2017008 | 12 May 2017 | NRC Reactive Inspection Report 05000250/2017008 and 05000251/2017008 |
IR 05000250/2016003 | 10 November 2016 | NRC Integrated Inspection Report 05000250/2016003, 05000251/2016003 |
ML15119A469 | 29 April 2015 | Initial Exam 2015-301 Draft RO Written Exam |
IR 05000250/2013004 | 31 October 2013 | IR 05000250-13-004, 05000251-13-004; 07/01/2013 - 09/30/2013; Turkey Point Nuclear Generating Units 3 & 4; Problem Identification and Resolution, Follow-up of Events and Notice of Enforcement Discretion |
L-2013-198, Rev. 2 to Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Turkey Point Unit 4. | 9 July 2013 | Rev. 2 to Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Turkey Point Unit 4. |
ML13213A190 | 9 July 2013 | Rev. 2 to Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Turkey Point Unit 3. |
L-2013-113, Inservice Inspection Plan Submittal of Relief Request No. 12 | 24 May 2013 | Inservice Inspection Plan Submittal of Relief Request No. 12 |
L-2013-107, Response to Request for Additional Information Re License Amendment Request No. 216 - Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) | 16 April 2013 | Response to Request for Additional Information Re License Amendment Request No. 216 - Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) |
ML13038A310 | 15 March 2013 | Request for Additional Information Regarding License Amendment Request to Adopt NFPA Standard 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (TAC Nos. ME8990-91) |
IR 05000250/2012005 | 30 January 2013 | IR 05000250-12-005 & 05000251-12-005, 10/01/2012 - 12/31/2012, Turkey Point Nuclear Power Plant, Units 3 and 4, Licensed Operator Requalification Program |
L-2012-416, Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic | 27 November 2012 | Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic |
IR 05000250/2010005 | 27 January 2011 | |
ML110280004 | 27 January 2011 | Integrated Inspection Report 2010-005 |
L-2010-115, 10 CFR 50.59 Summary Report Changes, Tests, and Experiments Implemented as Allowed by 10 CFR 50.59 for the Period Covering May 11, 2008 Through December 4, 2009 | 4 June 2010 | 10 CFR 50.59 Summary Report Changes, Tests, and Experiments Implemented as Allowed by 10 CFR 50.59 for the Period Covering May 11, 2008 Through December 4, 2009 |
IR 05000250/2009005 | 28 January 2010 | IR 05000250-09-005, 05000251-09-005; 10/1/2009 - 12/31/2009; Turkey Point Nuclear Power Plant, Units 3 and 4; Problem Identification and Resolution and Occupational Radiation Safety |
ML082540437 | 19 September 2008 | Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Proposed Alternative Course of Action |
L-2008-160, Updated Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. | 11 August 2008 | Updated Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. |
IR 05000250/2008003 | 30 July 2008 | IR 05000250-08-003, 05000251-08-003, on 4/1/2008 - 6/30/2008, Turkey Point Nuclear Power Plant, Units 3 and 4, Fire Protection, Refueling and Other Outage Activities, Problem Identification and Resolution |
L-2008-138, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. | 30 June 2008 | Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. |
L-2008-105, Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | 9 May 2008 | Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems |
ML080840326 | 24 March 2008 | Notification of Inspection and Request for Information |
IR 05000250/2007009 | 24 January 2008 | IR 05000250-07-009, 05000251-07-009; on 12/17/2007 - 12/21/2007; Turkey Point Nuclear Plant, Units 3 & 4; Follow-up Inspection of Substantive Cross-cutting Issue in the Area of Identification and Resolution of Problems |
Information Notice 2007-29, Temporary Scaffolding Affects Operability of Safety-Related Equipment | 17 September 2007 | Temporary Scaffolding Affects Operability of Safety-Related Equipment |
IR 05000250/2007008 | 6 July 2007 | IR 05000250-07-008 and 05000251-07-008, on 05/21/2007 - 06/08/2007; Turkey Point Nuclear Plant, Units 3 & 4; Identification and Resolution of Problems |
IR 05000250/2006007 | 17 March 2006 | IR 05000250-06-007 & IR 05000251-06-007, on 01/30/2006 - 02/17/2006, Turkey Point Nuclear Plant, Units 3 & 4; Biennial Baseline Inspection of the Identification and Resolution of Problems |
ML060370438 | 8 February 2006 | Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-basis Accidents at Pressurized-water Reactors |
IR 05000250/2004004 | 22 October 2004 | IR 05000250-04-004, 05000251-04-004; on 06/27/2004 - 09/25/2004; Turkey Point Nuclear Power Plant, Units 3 and 4; Problem Identification and Resolution |
IR 05000250/2004008 | 23 July 2004 | IR 05000250-04-008, IR 05000251-04-008 on 06/07/2004 - 06/10/2004 and 06/21/2004 - 06/24/2004 for Turkey Point, Units 3 and 4; Safety System Design and Performance Capability Inspection |
L-2004-125, Request for Additional Information - Triennial Fire Protection Inspection | 2 July 2004 | Request for Additional Information - Triennial Fire Protection Inspection |
L-2004-108, CFR 50.59 Report | 3 May 2004 | CFR 50.59 Report |
IR 05000250/2003005 | 21 January 2004 | IR 05000250-03-005 and IR 05000251-03-005 on 09/28-12/27/03, Turkey Point Nuclear Plant, Units 3 and 4 |
L-2003-201, NRC Bulletin 2003-01 Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors | 8 August 2003 | NRC Bulletin 2003-01 Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors |
L-2002-198, 10 CFR 50.59 Report | 7 October 2002 | 10 CFR 50.59 Report |
L-2002-074, Emergency Plan Implementing Procedure Changes | 2 May 2002 | Emergency Plan Implementing Procedure Changes |
ML17355A390 | 27 July 1999 | Application for Amend to License DPR-31,modifying TSs 3.8.1.1,3.4.3 & 3.5.2 to Extend AOT for Inoperable EDG from 72 Hours to 7 Days on one-time Basis |
ML17355A371 | 6 July 1999 | Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes |
NRC Generic Letter 1998-04 | 14 July 1998 | NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i |
ML17354A880 | 9 April 1998 | Requests Relief from Certain Requirements of ASME Section XI Code,1989 Edition.Util Requesting Approval to Expand Applicability of Code Case N-533 from Class 1 Sys to Class 1 & 2 Sys |
ML17354A826 | 11 March 1998 | Forwards Revised Epips,Including 0-EPIP-20106, Natural Emergencies, 0-EPIP-20132, Technical Support Center Activation & Operation, & 0-EPIP-20133, Operations Support Center Activation & Operation. |
ML17354A791 | 13 February 1998 | Forwards Rev 33 to Radiological Emergency Plan for Turkey Point Plant |
ML17354A885 | 13 October 1997 | FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. |
ML17354A434 | 13 March 1997 | Requests Approval to Incorporate Code Case N-533,Alternative Requirements for VT-2 Visual Exam of Class 1,for Use in Units 3 & 4 10-Yr ISI Program |
ML17354A372 | 17 December 1996 | Application for Amends to Licenses DPR-31 & DPR-41,modifying TS to Change SR for TS 4.4.10 Re Reactor Coolant Pump Flywheel Insp |