Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000250/202300214 August 2023Integrated Inspection Report 05000250/2023002 and 05000251/2023002
IR 05000250/202000411 February 2021Integrated Inspection Report 05000250/2020004 and 05000251/2020004 and Independent Spent Fuel Storage Installation Inspection (ISFSI) 07200062/2020002
L-2019-019, Subsequent License Renewal Application Safety Review - December 20, 2018 Public Meeting Action Item Responses31 January 2019Subsequent License Renewal Application Safety Review - December 20, 2018 Public Meeting Action Item Responses
ML18232A57621 August 2018Plan for On-Site Regulatory Audit Regarding the Subsequent License Renewal Application Review
L-2017-213, License Amendment Request 256, One-Time Extension of 3A Containment Spray (CS) Pump Completion Time18 December 2017License Amendment Request 256, One-Time Extension of 3A Containment Spray (CS) Pump Completion Time
ML20311A3476 November 20172017 Q1-Q4 ROP Inspection Findings
ML20311A3406 November 20172017 Q1-Q4 ROP Inspection Findings
IR 05000250/201700812 May 2017NRC Reactive Inspection Report 05000250/2017008 and 05000251/2017008
IR 05000250/201600310 November 2016NRC Integrated Inspection Report 05000250/2016003, 05000251/2016003
ML15119A46929 April 2015Initial Exam 2015-301 Draft RO Written Exam
IR 05000250/201300431 October 2013IR 05000250-13-004, 05000251-13-004; 07/01/2013 - 09/30/2013; Turkey Point Nuclear Generating Units 3 & 4; Problem Identification and Resolution, Follow-up of Events and Notice of Enforcement Discretion
L-2013-198, Rev. 2 to Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Turkey Point Unit 4.9 July 2013Rev. 2 to Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Turkey Point Unit 4.
ML13213A1909 July 2013Rev. 2 to Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Turkey Point Unit 3.
L-2013-113, Inservice Inspection Plan Submittal of Relief Request No. 1224 May 2013Inservice Inspection Plan Submittal of Relief Request No. 12
L-2013-107, Response to Request for Additional Information Re License Amendment Request No. 216 - Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)16 April 2013Response to Request for Additional Information Re License Amendment Request No. 216 - Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)
ML13038A31015 March 2013Request for Additional Information Regarding License Amendment Request to Adopt NFPA Standard 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (TAC Nos. ME8990-91)
IR 05000250/201200530 January 2013IR 05000250-12-005 & 05000251-12-005, 10/01/2012 - 12/31/2012, Turkey Point Nuclear Power Plant, Units 3 and 4, Licensed Operator Requalification Program
L-2012-416, Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic27 November 2012Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic
IR 05000250/201000527 January 2011
ML11028000427 January 2011Integrated Inspection Report 2010-005
L-2010-115, 10 CFR 50.59 Summary Report Changes, Tests, and Experiments Implemented as Allowed by 10 CFR 50.59 for the Period Covering May 11, 2008 Through December 4, 20094 June 201010 CFR 50.59 Summary Report Changes, Tests, and Experiments Implemented as Allowed by 10 CFR 50.59 for the Period Covering May 11, 2008 Through December 4, 2009
IR 05000250/200900528 January 2010IR 05000250-09-005, 05000251-09-005; 10/1/2009 - 12/31/2009; Turkey Point Nuclear Power Plant, Units 3 and 4; Problem Identification and Resolution and Occupational Radiation Safety
ML08254043719 September 2008Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Proposed Alternative Course of Action
L-2008-160, Updated Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.11 August 2008Updated Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.
IR 05000250/200800330 July 2008IR 05000250-08-003, 05000251-08-003, on 4/1/2008 - 6/30/2008, Turkey Point Nuclear Power Plant, Units 3 and 4, Fire Protection, Refueling and Other Outage Activities, Problem Identification and Resolution
L-2008-138, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.30 June 2008Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.
L-2008-105, Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems9 May 2008Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
ML08084032624 March 2008Notification of Inspection and Request for Information
IR 05000250/200700924 January 2008IR 05000250-07-009, 05000251-07-009; on 12/17/2007 - 12/21/2007; Turkey Point Nuclear Plant, Units 3 & 4; Follow-up Inspection of Substantive Cross-cutting Issue in the Area of Identification and Resolution of Problems
Information Notice 2007-29, Temporary Scaffolding Affects Operability of Safety-Related Equipment17 September 2007Temporary Scaffolding Affects Operability of Safety-Related Equipment
IR 05000250/20070086 July 2007IR 05000250-07-008 and 05000251-07-008, on 05/21/2007 - 06/08/2007; Turkey Point Nuclear Plant, Units 3 & 4; Identification and Resolution of Problems
IR 05000250/200600717 March 2006IR 05000250-06-007 & IR 05000251-06-007, on 01/30/2006 - 02/17/2006, Turkey Point Nuclear Plant, Units 3 & 4; Biennial Baseline Inspection of the Identification and Resolution of Problems
ML0603704388 February 2006Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-basis Accidents at Pressurized-water Reactors
IR 05000250/200400422 October 2004IR 05000250-04-004, 05000251-04-004; on 06/27/2004 - 09/25/2004; Turkey Point Nuclear Power Plant, Units 3 and 4; Problem Identification and Resolution
IR 05000250/200400823 July 2004IR 05000250-04-008, IR 05000251-04-008 on 06/07/2004 - 06/10/2004 and 06/21/2004 - 06/24/2004 for Turkey Point, Units 3 and 4; Safety System Design and Performance Capability Inspection
L-2004-125, Request for Additional Information - Triennial Fire Protection Inspection2 July 2004Request for Additional Information - Triennial Fire Protection Inspection
L-2004-108, CFR 50.59 Report3 May 2004CFR 50.59 Report
IR 05000250/200300521 January 2004IR 05000250-03-005 and IR 05000251-03-005 on 09/28-12/27/03, Turkey Point Nuclear Plant, Units 3 and 4
L-2003-201, NRC Bulletin 2003-01 Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors8 August 2003NRC Bulletin 2003-01 Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors
L-2002-198, 10 CFR 50.59 Report7 October 200210 CFR 50.59 Report
L-2002-074, Emergency Plan Implementing Procedure Changes2 May 2002Emergency Plan Implementing Procedure Changes
ML17355A39027 July 1999Application for Amend to License DPR-31,modifying TSs 3.8.1.1,3.4.3 & 3.5.2 to Extend AOT for Inoperable EDG from 72 Hours to 7 Days on one-time Basis
ML17355A3716 July 1999Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes
NRC Generic Letter 1998-0414 July 1998NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i
ML17354A8809 April 1998Requests Relief from Certain Requirements of ASME Section XI Code,1989 Edition.Util Requesting Approval to Expand Applicability of Code Case N-533 from Class 1 Sys to Class 1 & 2 Sys
ML17354A82611 March 1998Forwards Revised Epips,Including 0-EPIP-20106, Natural Emergencies, 0-EPIP-20132, Technical Support Center Activation & Operation, & 0-EPIP-20133, Operations Support Center Activation & Operation.
ML17354A79113 February 1998Forwards Rev 33 to Radiological Emergency Plan for Turkey Point Plant
ML17354A88513 October 1997FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013.
ML17354A43413 March 1997Requests Approval to Incorporate Code Case N-533,Alternative Requirements for VT-2 Visual Exam of Class 1,for Use in Units 3 & 4 10-Yr ISI Program
ML17354A37217 December 1996Application for Amends to Licenses DPR-31 & DPR-41,modifying TS to Change SR for TS 4.4.10 Re Reactor Coolant Pump Flywheel Insp