 Issue dateTitle
IR 05000395/202300214 August 2023Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation
ML23131A41825 May 2023V.C. Summer Nuclear Station 2022 Annual Assessment Meeting.Pptx
IR 05000395/202200410 February 2023Integrated Inspection Report 05000395/2022004
ML22314A18314 November 2022Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000395/ 2022012
ML22216A1204 August 2022IR2022002 Summer for Workflow
IR 05000395/202100421 January 2022Integrated Inspection Report 05000395/2021004
ML20311A3586 November 20172017 Q1-Q4 ROP Inspection Findings
IR 05000395/20170029 August 2017NRC Integrated Inspection Report 05000395/2017002 and Notice of Violation
RC-17-0072, Special Report (Spr) 2017-003 Regarding Electrical Fire Barrier Assembly Not Being Restored to Operability within Seven Days After Declaration of Inoperability1 June 2017Special Report (Spr) 2017-003 Regarding Electrical Fire Barrier Assembly Not Being Restored to Operability within Seven Days After Declaration of Inoperability
ML16029A11229 January 2016NRC Integrated Inspection Report 05000395/2015004
ML15173A43822 June 2015VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam
ML15173A43920 May 2015VC Summer 2015-301 Initial Exam Final SRO Written Exam
IR 05000395/20140052 February 2015IR 05000395/2014005; on 10/01/2014 - 12/31/2014: Virgil C. Summer Nuclear Station, Unit 1; Integrated Inspection Report
IR 05000395/201400722 December 2014IR 05000395/2014007; on 10/6/2014 - 11/7/2014 Virgil C. Summer Nuclear Station, Unit 1; Component Design Bases Inspection
ML14141A4616 June 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident
RC-13-0177, South Carolina Electric & Gas Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic25 November 2013South Carolina Electric & Gas Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic
IR 05000395/20120057 February 2013IR 05000395-12-005; 10/01/2012 - 12/31/2012: Virgil C. Summer Nuclear Station; Radioactive Material Handling, Storage and Transportation; Identification and Resolution of Problems
RC-12-0175, WCAP-17688-NP, Rev 0, V.C. Summer Unit 1 Seismic Walkdown Inspection Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic.30 November 2012WCAP-17688-NP, Rev 0, V.C. Summer Unit 1 Seismic Walkdown Inspection Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic.
RC-12-0174, Final Flooding Walk Down Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near.26 November 2012Final Flooding Walk Down Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near.
RC-12-0189, Engineering Services Technical Report TR02060-00120 November 2012Engineering Services Technical Report TR02060-001
IR 05000395/20110034 August 2011IR 05000395-11-003, on 04/01/2011 - 06/30/2011, Virgil C. Summer Nuclear Station, Maintenance Risk Assessments & Emergent Work Control, Refueling & Other Outage Activities; & Identification and Resolution of Problems
IR 05000395/200900429 October 2009IR 05000395-09-004; on 07-01-2009 - 09/30/2009; Virgil C. Summer Nuclear Station; Routine Integrated Inspection Report
RC-07-0021, Inspection and Mitigation Plan/Schedule of Alloy 82/182 Pressurizer Butt Welds (C-04-1719)31 January 2007Inspection and Mitigation Plan/Schedule of Alloy 82/182 Pressurizer Butt Welds (C-04-1719)
RC-06-0067, LAR 05-2926 Implementation of WCAP-14333-P-A, Rev. 1, Probabilistic Risk Analysis of the RPS and ESFAS Test Times and Completion Times Response to Request for Additional Information31 May 2006LAR 05-2926 Implementation of WCAP-14333-P-A, Rev. 1, Probabilistic Risk Analysis of the RPS and ESFAS Test Times and Completion Times Response to Request for Additional Information
ML06038000321 February 2006RAI, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors.
ML0523006186 September 2005Response to NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors.
ML05165051116 August 2005Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors.
RC-03-0197, Resubmittal of Request to Use Alternative to ASME Boiler and Pressure Vessel Code, Section XI (C-02-3202), RR-II-9, RR-11-9, RR-II-10, RR-II-11, RR-II-1216 September 2003Resubmittal of Request to Use Alternative to ASME Boiler and Pressure Vessel Code, Section XI (C-02-3202), RR-II-9, RR-11-9, RR-II-10, RR-II-11, RR-II-12
RC-03-0164, Response to NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors6 August 2003Response to NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors
ML20207H5337 June 1999Insp Rept 50-395/99-03 on 990328-0508.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support
IR 05000395/19990037 June 1999Insp Rept 50-395/99-03 on 990328-0508.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support
IR 05000395/199800921 December 1998Insp Rept 50-395/98-09 on 981011-1121.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support
NRC Generic Letter 1998-0414 July 1998NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i
RC-98-0081, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-395/98-01.Corrective actions:HPP-819 Will Be Revised to Include All Engineering Requirements17 April 1998Responds to NRC Ltr Re Violations Noted in Insp Rept 50-395/98-01.Corrective actions:HPP-819 Will Be Revised to Include All Engineering Requirements
ML20217G46520 March 1998Insp Rept 50-395/98-01 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support
ML20217G44320 March 1998Notice of Violation from Insp on 980111-0221.Violation Noted:Licensee Failed to Establish Adequate Requirements to Insure That Temporary Shielding Properly Controlled
ML20140D4522 June 1997Insp Rept 50-395/97-03 on 970323-0503.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support
ML20134G61827 January 1997Insp Rept 50-395/96-14 on 961201-28.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support
IR 05000395/199601330 December 1996Insp Rept 50-395/96-13 on 961027-1130.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support
RC-96-0223, Responds to Violations Noted in Insp Rept 50-395/96-02. Corrective Actions:Removed Scaffolding,Canceled Storage Area Request Number 476 & Reviewed Subject Violation W/Personnel29 August 1996Responds to Violations Noted in Insp Rept 50-395/96-02. Corrective Actions:Removed Scaffolding,Canceled Storage Area Request Number 476 & Reviewed Subject Violation W/Personnel
RC-95-0107, Responds to 950316 Conference Call Between Plant,Nrc Project Manager & Idaho Falls.Informs That 10CFR50.55 Allows NRC to Grant Relief from Applicable ASME Code Requirements Provided Requestor Demonstrates Compliance W/Specified Requiremen27 April 1995Responds to 950316 Conference Call Between Plant,Nrc Project Manager & Idaho Falls.Informs That 10CFR50.55 Allows NRC to Grant Relief from Applicable ASME Code Requirements Provided Requestor Demonstrates Compliance W/Specified Requirements
RC-95-0011, Monthly Operating Rept for Dec 1994 for VC Summer Nuclear Station,Unit 131 December 1994Monthly Operating Rept for Dec 1994 for VC Summer Nuclear Station,Unit 1
RC-94-0316, Monthly Operating Rept for Nov 1994 for Virgil C Summer Nuclear Station Unit 130 November 1994Monthly Operating Rept for Nov 1994 for Virgil C Summer Nuclear Station Unit 1
RC-94-0280, Requests Relief from ASME Section XI Requirements for Class 1 & 2 Insulated Pressure Retaining Bolted Connection, Receiving VT-2 Visual Exam During Performance of Sys Pressure Testing26 October 1994Requests Relief from ASME Section XI Requirements for Class 1 & 2 Insulated Pressure Retaining Bolted Connection, Receiving VT-2 Visual Exam During Performance of Sys Pressure Testing
RC-94-0258, Forwards Rev 1 to ISI Relief Request RR-06,from ASME Section XI Requirements for Class 1 & 2 Insulated Pressure Retaining Bolted Connections Which Received VT-2 Visual Exam During Performance Sys Pressure Testing7 October 1994Forwards Rev 1 to ISI Relief Request RR-06,from ASME Section XI Requirements for Class 1 & 2 Insulated Pressure Retaining Bolted Connections Which Received VT-2 Visual Exam During Performance Sys Pressure Testing
ML20058J40922 November 1993Forwards Summary of 931116 Meeting at Region II Ofc in Atlanta,Ga to Discuss Plant Status & Current Issues
Information Notice 1992-75, Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants12 November 1992Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants
ML20246L57331 August 1989Responds to Violations Noted in Insp Rept 50-395/89-13. Corrective Actions:Health Physics Procedure Being Developed to Delineate Requirements for Installation/Removal of Temporary or Portable Demineralizers
ML20246A5344 August 1989Insp Rept 50-395/89-13 on 890701-31.Violation Noted.Major Areas Inspected:Monthly Surveillance Observations,Monthly Maint Observation,Operational Safety Verification,Action on Previous Insp Findings & Other Areas
IR 05000395/198901228 July 1989Insp Rept 50-395/89-12 on 890626-30.No Violations or Deviations Noted.Major Areas Inspected:Followup of Osti Insp Completed in Dec 1988