Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000395/2023002 | 14 August 2023 | Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation |
ML23131A418 | 25 May 2023 | V.C. Summer Nuclear Station 2022 Annual Assessment Meeting.Pptx |
IR 05000395/2022004 | 10 February 2023 | Integrated Inspection Report 05000395/2022004 |
ML22314A183 | 14 November 2022 | Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000395/ 2022012 |
ML22216A120 | 4 August 2022 | IR2022002 Summer for Workflow |
IR 05000395/2021004 | 21 January 2022 | Integrated Inspection Report 05000395/2021004 |
ML20311A358 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
IR 05000395/2017002 | 9 August 2017 | NRC Integrated Inspection Report 05000395/2017002 and Notice of Violation |
RC-17-0072, Special Report (Spr) 2017-003 Regarding Electrical Fire Barrier Assembly Not Being Restored to Operability within Seven Days After Declaration of Inoperability | 1 June 2017 | Special Report (Spr) 2017-003 Regarding Electrical Fire Barrier Assembly Not Being Restored to Operability within Seven Days After Declaration of Inoperability |
ML16029A112 | 29 January 2016 | NRC Integrated Inspection Report 05000395/2015004 |
ML15173A438 | 22 June 2015 | VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam |
ML15173A439 | 20 May 2015 | VC Summer 2015-301 Initial Exam Final SRO Written Exam |
IR 05000395/2014005 | 2 February 2015 | IR 05000395/2014005; on 10/01/2014 - 12/31/2014: Virgil C. Summer Nuclear Station, Unit 1; Integrated Inspection Report |
IR 05000395/2014007 | 22 December 2014 | IR 05000395/2014007; on 10/6/2014 - 11/7/2014 Virgil C. Summer Nuclear Station, Unit 1; Component Design Bases Inspection |
ML14141A461 | 6 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident |
RC-13-0177, South Carolina Electric & Gas Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic | 25 November 2013 | South Carolina Electric & Gas Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic |
IR 05000395/2012005 | 7 February 2013 | IR 05000395-12-005; 10/01/2012 - 12/31/2012: Virgil C. Summer Nuclear Station; Radioactive Material Handling, Storage and Transportation; Identification and Resolution of Problems |
RC-12-0175, WCAP-17688-NP, Rev 0, V.C. Summer Unit 1 Seismic Walkdown Inspection Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. | 30 November 2012 | WCAP-17688-NP, Rev 0, V.C. Summer Unit 1 Seismic Walkdown Inspection Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. |
RC-12-0174, Final Flooding Walk Down Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near. | 26 November 2012 | Final Flooding Walk Down Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near. |
RC-12-0189, Engineering Services Technical Report TR02060-001 | 20 November 2012 | Engineering Services Technical Report TR02060-001 |
IR 05000395/2011003 | 4 August 2011 | IR 05000395-11-003, on 04/01/2011 - 06/30/2011, Virgil C. Summer Nuclear Station, Maintenance Risk Assessments & Emergent Work Control, Refueling & Other Outage Activities; & Identification and Resolution of Problems |
IR 05000395/2009004 | 29 October 2009 | IR 05000395-09-004; on 07-01-2009 - 09/30/2009; Virgil C. Summer Nuclear Station; Routine Integrated Inspection Report |
RC-07-0021, Inspection and Mitigation Plan/Schedule of Alloy 82/182 Pressurizer Butt Welds (C-04-1719) | 31 January 2007 | Inspection and Mitigation Plan/Schedule of Alloy 82/182 Pressurizer Butt Welds (C-04-1719) |
RC-06-0067, LAR 05-2926 Implementation of WCAP-14333-P-A, Rev. 1, Probabilistic Risk Analysis of the RPS and ESFAS Test Times and Completion Times Response to Request for Additional Information | 31 May 2006 | LAR 05-2926 Implementation of WCAP-14333-P-A, Rev. 1, Probabilistic Risk Analysis of the RPS and ESFAS Test Times and Completion Times Response to Request for Additional Information |
ML060380003 | 21 February 2006 | RAI, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors. |
ML052300618 | 6 September 2005 | Response to NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. |
ML051650511 | 16 August 2005 | Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors. |
RC-03-0197, Resubmittal of Request to Use Alternative to ASME Boiler and Pressure Vessel Code, Section XI (C-02-3202), RR-II-9, RR-11-9, RR-II-10, RR-II-11, RR-II-12 | 16 September 2003 | Resubmittal of Request to Use Alternative to ASME Boiler and Pressure Vessel Code, Section XI (C-02-3202), RR-II-9, RR-11-9, RR-II-10, RR-II-11, RR-II-12 |
RC-03-0164, Response to NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors | 6 August 2003 | Response to NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors |
ML20207H533 | 7 June 1999 | Insp Rept 50-395/99-03 on 990328-0508.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support |
IR 05000395/1999003 | 7 June 1999 | Insp Rept 50-395/99-03 on 990328-0508.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support |
IR 05000395/1998009 | 21 December 1998 | Insp Rept 50-395/98-09 on 981011-1121.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support |
NRC Generic Letter 1998-04 | 14 July 1998 | NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i |
RC-98-0081, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-395/98-01.Corrective actions:HPP-819 Will Be Revised to Include All Engineering Requirements | 17 April 1998 | Responds to NRC Ltr Re Violations Noted in Insp Rept 50-395/98-01.Corrective actions:HPP-819 Will Be Revised to Include All Engineering Requirements |
ML20217G465 | 20 March 1998 | Insp Rept 50-395/98-01 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support |
ML20217G443 | 20 March 1998 | Notice of Violation from Insp on 980111-0221.Violation Noted:Licensee Failed to Establish Adequate Requirements to Insure That Temporary Shielding Properly Controlled |
ML20140D452 | 2 June 1997 | Insp Rept 50-395/97-03 on 970323-0503.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support |
ML20134G618 | 27 January 1997 | Insp Rept 50-395/96-14 on 961201-28.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support |
IR 05000395/1996013 | 30 December 1996 | Insp Rept 50-395/96-13 on 961027-1130.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support |
RC-96-0223, Responds to Violations Noted in Insp Rept 50-395/96-02. Corrective Actions:Removed Scaffolding,Canceled Storage Area Request Number 476 & Reviewed Subject Violation W/Personnel | 29 August 1996 | Responds to Violations Noted in Insp Rept 50-395/96-02. Corrective Actions:Removed Scaffolding,Canceled Storage Area Request Number 476 & Reviewed Subject Violation W/Personnel |
RC-95-0107, Responds to 950316 Conference Call Between Plant,Nrc Project Manager & Idaho Falls.Informs That 10CFR50.55 Allows NRC to Grant Relief from Applicable ASME Code Requirements Provided Requestor Demonstrates Compliance W/Specified Requiremen | 27 April 1995 | Responds to 950316 Conference Call Between Plant,Nrc Project Manager & Idaho Falls.Informs That 10CFR50.55 Allows NRC to Grant Relief from Applicable ASME Code Requirements Provided Requestor Demonstrates Compliance W/Specified Requirements |
RC-95-0011, Monthly Operating Rept for Dec 1994 for VC Summer Nuclear Station,Unit 1 | 31 December 1994 | Monthly Operating Rept for Dec 1994 for VC Summer Nuclear Station,Unit 1 |
RC-94-0316, Monthly Operating Rept for Nov 1994 for Virgil C Summer Nuclear Station Unit 1 | 30 November 1994 | Monthly Operating Rept for Nov 1994 for Virgil C Summer Nuclear Station Unit 1 |
RC-94-0280, Requests Relief from ASME Section XI Requirements for Class 1 & 2 Insulated Pressure Retaining Bolted Connection, Receiving VT-2 Visual Exam During Performance of Sys Pressure Testing | 26 October 1994 | Requests Relief from ASME Section XI Requirements for Class 1 & 2 Insulated Pressure Retaining Bolted Connection, Receiving VT-2 Visual Exam During Performance of Sys Pressure Testing |
RC-94-0258, Forwards Rev 1 to ISI Relief Request RR-06,from ASME Section XI Requirements for Class 1 & 2 Insulated Pressure Retaining Bolted Connections Which Received VT-2 Visual Exam During Performance Sys Pressure Testing | 7 October 1994 | Forwards Rev 1 to ISI Relief Request RR-06,from ASME Section XI Requirements for Class 1 & 2 Insulated Pressure Retaining Bolted Connections Which Received VT-2 Visual Exam During Performance Sys Pressure Testing |
ML20058J409 | 22 November 1993 | Forwards Summary of 931116 Meeting at Region II Ofc in Atlanta,Ga to Discuss Plant Status & Current Issues |
Information Notice 1992-75, Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants | 12 November 1992 | Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants |
ML20246L573 | 31 August 1989 | Responds to Violations Noted in Insp Rept 50-395/89-13. Corrective Actions:Health Physics Procedure Being Developed to Delineate Requirements for Installation/Removal of Temporary or Portable Demineralizers |
ML20246A534 | 4 August 1989 | Insp Rept 50-395/89-13 on 890701-31.Violation Noted.Major Areas Inspected:Monthly Surveillance Observations,Monthly Maint Observation,Operational Safety Verification,Action on Previous Insp Findings & Other Areas |
IR 05000395/1989012 | 28 July 1989 | Insp Rept 50-395/89-12 on 890626-30.No Violations or Deviations Noted.Major Areas Inspected:Followup of Osti Insp Completed in Dec 1988 |