 Issue dateTitle
IR 05000458/20220041 February 2023Integrated Inspection Report 05000458/2022004
ML22354A08120 December 2022Inservice Inspection Request for Information
IR 05000458/202201012 December 2022Triennial Fire Protection Inspection Report 05000458/2022010
ML20337A4452 December 2020Riverbend Station Inservice Inspection Request for Information
RBG-48033, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements4 September 2020Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements
IR 05000458/202000129 April 2020Integrated Inspection Report 05000458/2020001
IR 05000458/20190028 August 2019Integrated Inspection Report 05000458/2019002
RBG-47951, 2018 Annual Radioactive Effluent Release Report1 May 20192018 Annual Radioactive Effluent Release Report
RBG-47808, Inservice Inspection Plan for the Fourth Ten-Year Interval30 November 2017Inservice Inspection Plan for the Fourth Ten-Year Interval
RBG-47801, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control15 November 2017Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control
RBG-47776, Redacted-River Bend Station, Unit 1, Revision 25 to the Updated Safety Analysis Report, Chapter 9, Section 9.1 Through Appendix 9B28 July 2017Redacted-River Bend Station, Unit 1, Revision 25 to the Updated Safety Analysis Report, Chapter 9, Section 9.1 Through Appendix 9B
ML17138A14424 May 2017Relief from the Requirements of the ASME Code
IR 05000458/20170011 May 2017
RBG-47737, Relief Requests for 10-year Updates to the 120-Month Inservice Testing Intervals27 February 2017Relief Requests for 10-year Updates to the 120-Month Inservice Testing Intervals
ML15071A14123 March 2015Relief Request No. VRR-RBS-2014-1 Regarding the Third 10-Year Inservice Testing Interval
RBG-47456, Relief Request; ASME Code Case OMN-17, Alternative Rules for Testing ASME Class 1 Pressure Relief/Safety Valves14 May 2014Relief Request; ASME Code Case OMN-17, Alternative Rules for Testing ASME Class 1 Pressure Relief/Safety Valves
ML14111A40427 March 20142014-03-Draft Operating Test
IR 05000458/20130028 May 2013IR 05000458-13-002; Entergy Operations, Inc; 01/01/2013 - 03/30/2013; River Bend Station, NRC Integrated Inspection Report
RBG-47307, Engineering Report RBS-CS-12-00001, Rev. 000, River Bend Station Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic.14 November 2012Engineering Report RBS-CS-12-00001, Rev. 000, River Bend Station Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic.
IR 05000458/20120038 August 2012IR 05000458-12-003; 04/01/2012 - 06/30/2012; River Bend Station; Integrated Resident and Regional Report; Adverse Weather Protection; Problem Identification and Resolution; Followup of Events and Notices of Enforcement Discretion; Other Act
IR 05000458/201200214 May 2012IR 05000458-12-002; 01/01/2012 - 03/31/2012; River Bend Station; Integrated Resident and Regional Report; Maintenance Effectiveness; Maintenance Risk Assessments and Emergent Work Control; Evaluations of Changes, Tests, or Experiments and P
ML11223A27721 June 2011FEMA River Bend Station Medical Services Drill, Final Exercise Report, Exercise Date - May 25-26, 2011
ML11194050225 May 2011FEMA River Bend Station Medical Services Final Exercise Report, Exercise Date - May 25-26, 2011
IR 05000458/201100212 May 2011IR 05000458-11-002; 01/01/2011 - 03/31/2011; River Bend; Integrated Resident &Regional Report; Equipment Alignments; Refueling &Other Outage Activities; Emergency Action Level and Emergency Plan Changes; Radiological Hazard Assessment & Exp
RBG-47110, Inservice Inspection Plan for the Third 10-Year Interval17 January 2011Inservice Inspection Plan for the Third 10-Year Interval
ML1031605862 September 2010FEMA River Bend Station After Action Report/Improvement Plan, Drill Date - September 2, 2010, Radiological Emergency Preparedness (REP) Program
IR 05000458/200900412 November 2009IR 05000458-09-004; 07/01/2009 - 09/30/2009; Integrated Resident and Regional Report; Equipment Alignments; Operability Evaluations; Surveillance Testing
ML09209077328 July 2009July 28, 2009 Meeting Slides from Entergy Operations(River Bend Station) to Discuss Ri ISI
RBG-46922, Request for Alternative - Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-71616 June 2009Request for Alternative - Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716
RBG-46923, Request for Alternative RBS-ISI-012 Request to Extend the Second ASME Inservice Inspection Interval16 June 2009Request for Alternative RBS-ISI-012 Request to Extend the Second ASME Inservice Inspection Interval
CNRO-2009-00001, Relief Requests for Third 120 Month Inservice Inspection Interval23 January 2009Relief Requests for Third 120 Month Inservice Inspection Interval
ML08196068423 September 2008Assessment of 3-Month Response/Proposed Alternative Course of Action to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
CNRO-2008-00016, Relief Requests for Third 120 Month Inservice Testing Interval20 May 2008Relief Requests for Third 120 Month Inservice Testing Interval
RBG-46815, Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems15 May 2008Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
CNRO-2007-00044, Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan30 November 2007Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan
IR 05000458/200600414 November 2006IR 05000458-06-004; 07/01/2006 - 09/30/2006; River Bend Station; Postmaintenance Testing; Access Controls to Radiologically Significant Areas
IR 05000458/200500310 August 2005IR 05000458-05-003; on 04/01/2005 - 06/30/2005; River Bend Station; Fire Protection
IR 05000458/200300522 October 2003IR 05000458-03-005 & 07200049-03-001; 06/29/2003 - 09/27/2003; River Bend Station; ALARA Planning and Controls
IR 05000458/20030038 May 2003IR 05000458-03-003; 12/29/2002 - 04/12/2003; River Bend Station; Flood Prot Measures, Personnel Perf During Nonroutine Plant Evolutions, Access Ctrl to Rad Significant Areas, ALARA Planning & Controls, & Ident & Res of Problems
ML02119067222 April 2002Supplement to Amendment Request License Amendment Request (LAR) 2001-027, Emergency Diesel Generator Extended Allowed Outage Time, TS 3.8.1
IR 05000458/200100717 April 2002IR 05000458/2001-007; on 12/31/2001-03/30/2002; Entergy Operations, Inc; River Bend Station. Integrated Resident & Regional Report. No Findings of Significance Were Identified
IR 05000458/199801013 August 1999Forwards Summary of 990805 Mgt Meeting with Licensee in Arlington,Tx Re Radiological Control Problems Noted in Insp Repts 50-458/98-10 & 50-458/99-04.With Attendance List & Licensee Presentation
IR 05000458/199900318 May 1999Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support
RBG-44925, Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations15 March 1999Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations
NRC Generic Letter 1998-0414 July 1998NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i
RBG-44551, Responds to NRC Re Fire Protection Functional Insp Rept 50-458/97-201 on 970616-20 & 0630-0703.Requested Addl Info in Re Review of Certain Issues Found During Insp,Also Included30 June 1998Responds to NRC Re Fire Protection Functional Insp Rept 50-458/97-201 on 970616-20 & 0630-0703.Requested Addl Info in Re Review of Certain Issues Found During Insp,Also Included
IR 05000458/19970205 February 1998Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support
ML20202F03626 November 1997Rev 0 to IST Plan for Pumps & Valves Second Ten-Yr Interval
IR 05000458/199701326 September 1997Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support
ML20140D8235 June 1997Provides Draft Fire Protection Functional Insp Procedure to Be Used to Conduct Upcoming NRR Lead Pilot Team Insp at Plant