Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000458/2022004 | 1 February 2023 | Integrated Inspection Report 05000458/2022004 |
ML22354A081 | 20 December 2022 | Inservice Inspection Request for Information |
IR 05000458/2022010 | 12 December 2022 | Triennial Fire Protection Inspection Report 05000458/2022010 |
ML20337A445 | 2 December 2020 | Riverbend Station Inservice Inspection Request for Information |
RBG-48033, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 4 September 2020 | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements |
IR 05000458/2020001 | 29 April 2020 | Integrated Inspection Report 05000458/2020001 |
IR 05000458/2019002 | 8 August 2019 | Integrated Inspection Report 05000458/2019002 |
RBG-47951, 2018 Annual Radioactive Effluent Release Report | 1 May 2019 | 2018 Annual Radioactive Effluent Release Report |
RBG-47808, Inservice Inspection Plan for the Fourth Ten-Year Interval | 30 November 2017 | Inservice Inspection Plan for the Fourth Ten-Year Interval |
RBG-47801, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control | 15 November 2017 | Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control |
RBG-47776, Redacted-River Bend Station, Unit 1, Revision 25 to the Updated Safety Analysis Report, Chapter 9, Section 9.1 Through Appendix 9B | 28 July 2017 | Redacted-River Bend Station, Unit 1, Revision 25 to the Updated Safety Analysis Report, Chapter 9, Section 9.1 Through Appendix 9B |
ML17138A144 | 24 May 2017 | Relief from the Requirements of the ASME Code |
IR 05000458/2017001 | 1 May 2017 | |
RBG-47737, Relief Requests for 10-year Updates to the 120-Month Inservice Testing Intervals | 27 February 2017 | Relief Requests for 10-year Updates to the 120-Month Inservice Testing Intervals |
ML15071A141 | 23 March 2015 | Relief Request No. VRR-RBS-2014-1 Regarding the Third 10-Year Inservice Testing Interval |
RBG-47456, Relief Request; ASME Code Case OMN-17, Alternative Rules for Testing ASME Class 1 Pressure Relief/Safety Valves | 14 May 2014 | Relief Request; ASME Code Case OMN-17, Alternative Rules for Testing ASME Class 1 Pressure Relief/Safety Valves |
ML14111A404 | 27 March 2014 | 2014-03-Draft Operating Test |
IR 05000458/2013002 | 8 May 2013 | IR 05000458-13-002; Entergy Operations, Inc; 01/01/2013 - 03/30/2013; River Bend Station, NRC Integrated Inspection Report |
RBG-47307, Engineering Report RBS-CS-12-00001, Rev. 000, River Bend Station Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. | 14 November 2012 | Engineering Report RBS-CS-12-00001, Rev. 000, River Bend Station Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. |
IR 05000458/2012003 | 8 August 2012 | IR 05000458-12-003; 04/01/2012 - 06/30/2012; River Bend Station; Integrated Resident and Regional Report; Adverse Weather Protection; Problem Identification and Resolution; Followup of Events and Notices of Enforcement Discretion; Other Act |
IR 05000458/2012002 | 14 May 2012 | IR 05000458-12-002; 01/01/2012 - 03/31/2012; River Bend Station; Integrated Resident and Regional Report; Maintenance Effectiveness; Maintenance Risk Assessments and Emergent Work Control; Evaluations of Changes, Tests, or Experiments and P |
ML11223A277 | 21 June 2011 | FEMA River Bend Station Medical Services Drill, Final Exercise Report, Exercise Date - May 25-26, 2011 |
ML111940502 | 25 May 2011 | FEMA River Bend Station Medical Services Final Exercise Report, Exercise Date - May 25-26, 2011 |
IR 05000458/2011002 | 12 May 2011 | IR 05000458-11-002; 01/01/2011 - 03/31/2011; River Bend; Integrated Resident &Regional Report; Equipment Alignments; Refueling &Other Outage Activities; Emergency Action Level and Emergency Plan Changes; Radiological Hazard Assessment & Exp |
RBG-47110, Inservice Inspection Plan for the Third 10-Year Interval | 17 January 2011 | Inservice Inspection Plan for the Third 10-Year Interval |
ML103160586 | 2 September 2010 | FEMA River Bend Station After Action Report/Improvement Plan, Drill Date - September 2, 2010, Radiological Emergency Preparedness (REP) Program |
IR 05000458/2009004 | 12 November 2009 | IR 05000458-09-004; 07/01/2009 - 09/30/2009; Integrated Resident and Regional Report; Equipment Alignments; Operability Evaluations; Surveillance Testing |
ML092090773 | 28 July 2009 | July 28, 2009 Meeting Slides from Entergy Operations(River Bend Station) to Discuss Ri ISI |
RBG-46922, Request for Alternative - Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 | 16 June 2009 | Request for Alternative - Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 |
RBG-46923, Request for Alternative RBS-ISI-012 Request to Extend the Second ASME Inservice Inspection Interval | 16 June 2009 | Request for Alternative RBS-ISI-012 Request to Extend the Second ASME Inservice Inspection Interval |
CNRO-2009-00001, Relief Requests for Third 120 Month Inservice Inspection Interval | 23 January 2009 | Relief Requests for Third 120 Month Inservice Inspection Interval |
ML081960684 | 23 September 2008 | Assessment of 3-Month Response/Proposed Alternative Course of Action to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems |
CNRO-2008-00016, Relief Requests for Third 120 Month Inservice Testing Interval | 20 May 2008 | Relief Requests for Third 120 Month Inservice Testing Interval |
RBG-46815, Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | 15 May 2008 | Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems |
CNRO-2007-00044, Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan | 30 November 2007 | Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan |
IR 05000458/2006004 | 14 November 2006 | IR 05000458-06-004; 07/01/2006 - 09/30/2006; River Bend Station; Postmaintenance Testing; Access Controls to Radiologically Significant Areas |
IR 05000458/2005003 | 10 August 2005 | IR 05000458-05-003; on 04/01/2005 - 06/30/2005; River Bend Station; Fire Protection |
IR 05000458/2003005 | 22 October 2003 | IR 05000458-03-005 & 07200049-03-001; 06/29/2003 - 09/27/2003; River Bend Station; ALARA Planning and Controls |
IR 05000458/2003003 | 8 May 2003 | IR 05000458-03-003; 12/29/2002 - 04/12/2003; River Bend Station; Flood Prot Measures, Personnel Perf During Nonroutine Plant Evolutions, Access Ctrl to Rad Significant Areas, ALARA Planning & Controls, & Ident & Res of Problems |
ML021190672 | 22 April 2002 | Supplement to Amendment Request License Amendment Request (LAR) 2001-027, Emergency Diesel Generator Extended Allowed Outage Time, TS 3.8.1 |
IR 05000458/2001007 | 17 April 2002 | IR 05000458/2001-007; on 12/31/2001-03/30/2002; Entergy Operations, Inc; River Bend Station. Integrated Resident & Regional Report. No Findings of Significance Were Identified |
IR 05000458/1998010 | 13 August 1999 | Forwards Summary of 990805 Mgt Meeting with Licensee in Arlington,Tx Re Radiological Control Problems Noted in Insp Repts 50-458/98-10 & 50-458/99-04.With Attendance List & Licensee Presentation |
IR 05000458/1999003 | 18 May 1999 | Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support |
RBG-44925, Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations | 15 March 1999 | Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations |
NRC Generic Letter 1998-04 | 14 July 1998 | NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i |
RBG-44551, Responds to NRC Re Fire Protection Functional Insp Rept 50-458/97-201 on 970616-20 & 0630-0703.Requested Addl Info in Re Review of Certain Issues Found During Insp,Also Included | 30 June 1998 | Responds to NRC Re Fire Protection Functional Insp Rept 50-458/97-201 on 970616-20 & 0630-0703.Requested Addl Info in Re Review of Certain Issues Found During Insp,Also Included |
IR 05000458/1997020 | 5 February 1998 | Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support |
ML20202F036 | 26 November 1997 | Rev 0 to IST Plan for Pumps & Valves Second Ten-Yr Interval |
IR 05000458/1997013 | 26 September 1997 | Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support |
ML20140D823 | 5 June 1997 | Provides Draft Fire Protection Functional Insp Procedure to Be Used to Conduct Upcoming NRR Lead Pilot Team Insp at Plant |