ML20155D480 | 27 October 1998 | Amend 3 to Rancho Seco DSAR, Representing Updated Licensing Basis for Operation of Permanently Shutdown & Defueled Rancho Seco Nuclear Facility During Permanently Defueled Mode |
IR 05000312/1998003 | 7 August 1998 | Insp Rept 50-312/98-03 on 980706-09.No Violations Noted. Major Areas Inspected:Review of Licensee Programs Related to SFP Safety,Status of Decommissioning,Safety Review & self-assessments & Radiological Safety Programs |
NRC Generic Letter 1998-04 | 14 July 1998 | NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i |
ML20248C430 | 6 May 1998 | Annual Rept, Covering Period 970507-980506 |
ML20217D327 | 30 July 1997 | Update of 1995 Decommissioning Evaluation for Rancho Seco Nuclear Generating Station |
Information Notice 1992-75, Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants | 12 November 1992 | Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants |
IR 05000312/1988033 | 17 February 1989 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-312/88-33 |
ML20151W087 | 25 July 1988 | Insp Rept 50-312/88-02 on 880104-0309.Weaknesses Noted. Major Areas Inspected:Past & Present Procurement,Matls Control & Warehouse Activities Before Restart |
ML20246H231 | 28 June 1988 | Forwards Monthly Performance Data for May 1988 |
ML20151U501 | 18 April 1988 | Special Rept 88-09:during Dec 1987 & Jan 1988,annual Surveillance of Reactor Bldg Surfaces Made |
ML20147C375 | 1 March 1988 | Procurement Engineering Assessment Plan,Interim Rept |
IR 05000312/1987037 | 3 February 1988 | Insp Rept 50-312/87-37 on 871024-1204.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint, Surveillance & Followup Items |
ML20148T007 | 20 January 1988 | Rev 1 to STP.961, Loss of Offsite Power |
PNO-V-87-080, on 871204,inspectors Identified Worker Lying Down on Scaffolding Erected at Grade Level in Reactor Bldg. Individual Waiting for Addl Staging of Equipment.Security Badge Suspended & Investigation Initiated | 8 December 1987 | PNO-V-87-080:on 871204,inspectors Identified Worker Lying Down on Scaffolding Erected at Grade Level in Reactor Bldg. Individual Waiting for Addl Staging of Equipment.Security Badge Suspended & Investigation Initiated |
IR 05000312/1987023 | 30 September 1987 | Insp Rept 50-312/87-23 on 870714-0911.No Violations Noted. Major Areas Inspected:Activities Re Containment Integrated Leak Rate Test & IE Info Notice |
IR 05000312/1987022 | 11 August 1987 | Insp Rept 50-312/87-22 on 870615-25.Violation Noted.Major Areas Inspected:External Occupational Exposure Control & Personnel Dosimetry,Audits & Review,Liquids & Liquid Wastes, Radiological Environ Monitoring & post-accident Sampling |
ML20206Q509 | 3 April 1987 | Rev 0 to Wire & Cable Program Description & Action Plan. Related Info Encl |
ML20211P612 | 31 December 1986 | Amend 2 to Action Plan for Performance Improvement |
ML20212Q019 | 15 December 1986 | Amend 2 of Rancho Seco Action Plan for Performance Improvement |
IR 05000312/1986005 | 10 April 1986 | Insp Rept 50-312/86-05 on 860116-24.Violation Noted: Failure to Perform Evaluation of Unreviewed Safety Question Per 10CFR50.59(a) |
ML20211E015 | 30 October 1985 | Transient Assessment Program Rept for Rancho Seco Reactor Trip on High Pressure,Followed by Cooldown Transient on 851002,Transient Assessment Program RS-86-05 |
Information Notice 1985-43, Radiography Events at Power Reactors | 30 May 1985 | Radiography Events at Power Reactors |