IR 05000338/2023010 | 31 May 2023 | Biennial Problem Identification and Resolution Inspection Report 05000338/2023010 and 05000339/2023010 |
IR 05000338/2023001 | 2 May 2023 | Integrated Inspection Report 05000338/2023001 and 05000339/2023001 |
IR 05000338/2021013 | 13 October 2021 | Biennial Problem Identification and Resolution Inspection Report 05000338/2021013 and 05000339/2021013 |
IR 05000338/2021001 | 11 May 2021 | Integrated Inspection Report 05000338/2021001 and 05000339/2021001 |
ML20309A608 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML20309A594 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Frontmatter |
ML20252A004 | 23 September 2020 | Request for Relief Request Fifth 10-Year Interval |
ML20028D492 | 22 January 2020 | Inservice Testing Program Plan for Pumps, Valves, and Snubbers Fifth 10-Year Interval Update for Units 1 and 2; Request for Alternatives to Requirements of ASME OM Code |
IR 05000338/2019002 | 5 August 2019 | Integrated Inspection Report 05000338/2019002 and 05000339/2019002; 07200056/2019001 |
IR 05000338/2018003 | 30 October 2018 | NRC Integrated Inspection Report 05000338/2018003 and 05000339/2018003; 05000338/2018502 and 05000339/2018502 |
ML18285A046 | 27 September 2018 | Revision 54 to Updated Final Safety Analysis Report, Frontmatter - Revision Summary |
ML18093B076 | 28 March 2018 | SME Section XI Inservice Inspection Program Request for Proposed Alternative N2-14-NDE-007 |
ML20311A493 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
ML20311A501 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
ML17033B480 | 29 September 2016 | Redacted Updated Final Safety Analysis Report |
ML17033B525 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 6 |
ML14036A315 | 30 January 2014 | Report in Response to March 12, 2012 Information Request Regarding Seismic Aspect of Recommendation 2.3 |
IR 05000338/2012005 | 30 January 2013 | IR 05000338-12-005 & 05000339-12-005, on 10/01/12 - 12/31/12, North Anna Power Station, Units 1 and 2, Baseline Inspection |
ML12355A060 | 27 November 2012 | Report in Response to March 12, 2012 Information Request Regarding Seismic Aspect of Recommendation 2.3 |
IR 05000338/2012002 | 10 May 2012 | IR 05000338-12-002, 05000339-12-002, on 01/01/2012 - 03/31/2012; North Anna Power Station, Units 1 and 2; Other Activities |
ML11292A198 | 18 October 2011 | Response to Request for Additional Information Restart Readiness Determination Plan |
IR 05000338/2011003 | 28 July 2011 | |
IR 05000338/2011000 | 28 July 2011 | IR 05000338-11-00, 0500339-11-003 and 0720056-11-001; 04/01/2011 - 06/30/2011; North Anna, Units 1 and 2. Routine Integrated Inspection Report. Fire Protection. Plant Modifications. Identification and Resolution of Problems. Event Followup |
ML111260625 | 6 May 2011 | Inspection Report 2011002 Errata |
IR 05000338/2011002 | 2 May 2011 | IR 05000339-11-002 & IR 05000338-11-002, on 03/31/11, North Anna Power Station, Units 1 and 2: Operability Evaluations, Post Maintenance Testing, Identification and Resolution of Problems and Event Followup |
ML103060097 | 15 November 2010 | (Naps), Units 1 and 2, Fourth 10-Year Inservice Testing Interval Program, Pumps and Valves Relief Request (RR) (TAC Nos. ME2776 and ME2777) |
ML093350600 | 24 November 2009 | Fourth Interval Inservice Testing Program Plan and Proposed Alternatives and Relief Requests |
ML092820155 | 30 September 2009 | Updated Final Safety Analysis Report, Revision 45, Chapter 6, Engineered Safety Features |
ML092820146 | 30 September 2009 | Updated Final Safety Analysis Report, Revision 45, Revision Summary Through List of Effective Pages |
ML080950111 | 3 April 2008 | Response to Request for Additional Information Regarding Proposed License Amendment Request One-Time Five-Year Extension to Type a Test Interval |
ML080650563 | 29 February 2008 | Supplemental Response to NRC GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
ML061170008 | 26 April 2006 | IR 05000338-06-002, IR 05000339-06-002, IR 07200016-06-001; 01/01/2006 - 03/31/2006; North Anna Units 1 & 2, & North Anna Independent Spent Fuel Storage Installation. Routine Integrated Resident and Regional Inspector Report. Event Follow-u |
IR 05000338/2006002 | 26 April 2006 | IR 05000338-06-002, IR 05000339-06-002, IR 07200016-06-001; 01/01/2006 - 03/31/2006; North Anna Units 1 & 2, & North Anna Independent Spent Fuel Storage Installation. Routine Integrated Resident and Regional Inspector Report. Event Follow-u |
ML060370463 | 9 February 2006 | RAI, Response to GL-2004-02, Potential Impact to Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors. |
IR 05000338/2005005 | 30 January 2006 | IR 05000338-05-005, IR 05000339-05-005; 10/01/2005 - 12/31/2005; North Anna Power Station Units 1 & 2. Routine Integrated Resident and Regional Report. Inservice Inspection |
IR 05000338/2004003 | 23 July 2004 | IR 05000338-04-003, 05000339-04-003, on 03/28/04 - 06/26/04, North Anna, Units 1 & 2; Integrated Resident & Regional Report; Maintenance Implementation, Maintenance Risk Assessment, Non-Routine Evolution, Operability Evaluation & Surveillan |
IR 05000338/2003002 | 5 May 2003 | IR 05000338-03-002, IR 05000339-03-002, on 01/05/ - 04/05/2003, Virginia Electric and Power Company; North Anna, Units 1 & 2; Inservice Inspection Activities |
ML030700130 | 4 March 2003 | Summary of Facility Changes, Tests & Experiments, Design Change No. 00-004, Sections 1.0 - 4.0 |
IR 05000338/2002004 | 30 January 2003 | IR 05000338-02-004 & IR 05000339-02-004, on July 15-19 & September 29, 2002 Through January 4, 2003, North Anna, Units 1 & 2. Heat Sink Performance, Inservice Inspection Activities, Operability Operations & Access Control to Radiologically |
ML021630245 | 12 June 2002 | ASME Section XI Inservice Inspection (ISI) Program Third 10-Year Interval Requests for Relief |
ML021630172 | 12 June 2002 | ASME Section XI Inservice Inspection (ISI) Program Third 10-Year Interval Requests for Relief |
ML021610266 | 10 June 2002 | ASME Section XI Inservice Inspection (ISI) Program Relief Request SPT-001 |
ML021330155 | 30 April 2002 | Response to Request for Additional Information Re Third Inspection Interval ISI Program Relief Requests SPT-001, 003 and 004 |
IR 05000338/2001004 | 28 January 2002 | IR 05000338/2001-004, 05000339/2001-004, North Anna Power Station, Inspection on 09/30-12/29/2001. No Violations Noted |
ML020280439 | 28 January 2002 | N.Anna, Units 1 and 2 Inservice Testing Program for Pump and Valves, Third Ten Year Interval Update |
ML20195B569 | 14 May 1999 | Rev 8,Change 2 to Vepc North Anna,Unit 1 IST Program Plan for Pumps & Valves Second Insp Interval 901214-001214 |
ML20195B588 | 14 May 1999 | Rev 8,Change 2 to Vepc North Anna Unit 2 IST Program Plan for Pumps & Valves Second Insp Interval,901214-001214 |
ML20205P234 | 1 May 1999 | Rev 0 to Vepc North Anna Unit 1 ISI Program for Third Insp Interval Vol 1:ISI Program for Components & Component Supports for Interval 3 990501-090430 |
IR 05000338/1999001 | 12 April 1999 | Insp Repts 50-338/99-01 & 50-339/99-01 on 990131-0313. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.In Addition,Results of Insp by Region Based Fire Protection Specialist Encl |
ML20202D919 | 28 January 1999 | Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980817-21,980831-0903 at North Anna Power Station |