Semantic search

Jump to navigation Jump to search
 Issue dateTitle
LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes29 March 2023Submittal of Hope Creek Generating Station Technical Specification Bases Changes
ML22298A05424 October 2022Submittal of Updated Final Safety Analysis Report, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results
LR-N21-0079, Submittal of Hope Creek Generating Station Technical Specification Bases Changes3 November 2021Submittal of Hope Creek Generating Station Technical Specification Bases Changes
LR-N20-0060, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements29 September 2020Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements
ML20142A54921 May 20204 to Updated Final Safety Analysis Report, Section 6, Engineered Safety Features
LR-N20-0033, Submittal of Hope Creek Generating Station Technical Specification Bases Changes15 May 2020Submittal of Hope Creek Generating Station Technical Specification Bases Changes
ML19136A02611 July 2019Issuance of Relief Request No. HC-I3R-08, Revision 0, Use of the ASME Code
LR-N18-0087, Submittal of Relief Request Associated with the Third Inservice Inspection (ISI) Interval24 September 2018Submittal of Relief Request Associated with the Third Inservice Inspection (ISI) Interval
IR 05000354/20170046 February 2018Integrated Inspection Report 05000354/2017004
LR-N16-0156, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies7 October 2016License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies
ML14332A15412 February 2015Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents)
LR-N14-0155, PSEG Nuclear LLC, Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-25 June 2014PSEG Nuclear LLC, Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-
IR 05000354/201300511 February 2014IR 05000354-13-005, October 1, 2013, Through December 31, 2013, Hope Creek, Unit 1, Integrated Inspection Report and Exercise of Enforcement Discretion
IR 05000354/201200511 February 2013IR 05000354-12-005; 10/01/2012 - 12/31/2012; Hope Creek Generating Station; Flood Protection Measures
IR 05000354/201200414 November 2012IR 05000354-12-004; Hope Creek Generating Station Unit 1 - NRC Integrated Inspection Report and Exercise of Enforcement Discretion (07-01-12 - 09-30-12)
IR 05000354/201200310 August 2012IR 05000354-12-003; 04/01/2012 - 06/30/2012; Hope Creek Generating Station; Maintenance Effectiveness, Follow-Up of Events and Notices of Enforcement Discretion
IR 05000354/20120023 May 2012IR 05000354-12-002; 01-01-12 - 03-31-12; Hope Creek Generating Station - NRC Integrated Inspection Report
LR-N11-0289, Site-Specific Cost Estimates15 September 2011Site-Specific Cost Estimates
ML1106005571 March 2011Minutes of the Meeting of the Subcommittee on Plant License Renewal Regarding Hope Creek Generating Plant on November 3, 2010, in Rockville, Maryland
IR 05000354/20100048 November 2010IR 05000354-10-004, on 07-01-10 - 09-30-10, Hope Creek Generating Station - NRC Integrated Inspection Report
LR-N09-0014, Submittal of Biennial Decommissioning Funding Status Report23 June 2009Submittal of Biennial Decommissioning Funding Status Report
ML0817801208 September 2008Units 1 & 2-Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, & Containment Spray Systems, Proposed Alternative Course of Action (Tac MD7835, MD7874, & MD7875)
LR-N08-0073, Transmittal of Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems10 April 2008Transmittal of Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
IR 05000272/20070063 May 2007IR 0500272-07-006, 05000311-07-006, and 05000354-07-007, on 03/05/2007 - 03/23/2007; Salem Nuclear Generating Station Units 1 and 2 and Hope Creek; Biennial Baseline Inspection of the Identification and Resolution of Problems (Pi&R)
ML0619800977 July 2006Raw Information from Salem Interviews
ML0619802547 July 2006OI Notes
LR-N05-0415, July 2005 Monthly Operating Report for Hope Creek Generating Station15 August 2005July 2005 Monthly Operating Report for Hope Creek Generating Station
ML05006011423 December 2004Design Change Package 80062466 Revision 3 Extended Power Uprate Piping Vibration Monitoring, Installation Package, 12/23/2004
ML05006005419 October 2004Design Change Package 80062466 Revision 1 Extended Power Uprate Piping Vibration Monitoring Installation Package, 10/19/2004
ML0619800959 June 2004OI Memo to DRP on SCWE Interviews and Acquisition of Employee Concerns Program Documents (Case No. 1-2003-051F)
ML04146048121 May 2004Attachment to 5/21/04 PSEG Ltr - USA Final Report - PSEG Nuclear, LLC Salem / Hope Creek Safety Culture Assessment
ML05014025329 April 2004HC-04Q-301 Hope Creek Extended Power Uprate Piping Vibration Monitoring, 4/29/2004
ML0626304081 March 2004PSEG Nuclear, LLC Salem/Hope Creek Safety Culture Assessment
ML06179072316 December 2003OI Interview Transcript of Witness
ML06177011729 October 2003OI Interview Transcript of Witness, Pages 1-153
ML06180020823 October 2003OI Interview Transcript of Witness
ML06177049323 October 2003OI Interview Transcript of Witness, Pages 1-95
ML06181005722 October 2003OI Interview Transcript of Witness
ML06179072622 October 2003OI Interview Transcript of Witness
ML06198008622 October 2003Notes for Multiple (3) Witnesses Interview Material
ML06179069021 October 2003OI Interview Transcript of Witness
ML06254019325 March 2003to (28 Pages) with Attachments. 03/17/2003 Operational Transient Event at Hope Creek
ML0524900669 September 2002E-Mail from Vito to Blough, Additional Information Received from RI-2002-A-0116 Alleger (Hope Creek Bogus Sample Guy)
ML02135021118 March 2002Final RO & SRO Written Post Exam Comments
ML20151Z59411 September 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/98-02 on 980423.Response Indicated Violations Corrected & Measures Initiated to Prevent Recurrence
NRC Generic Letter 1998-0414 July 1998NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i
IR 05000354/19980054 June 1998Insp Rept 50-354/98-05 on 980405-0516.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support
ML20248C42526 May 1998Responds to NRC Re Violations Noted in Insp Rept 50-354/98-02.Corrective Actions:Work Order Activity Was Added to Service Water Strainer Preventive Maint Work Order to Control Platform Installation
ML20217H80523 April 1998Notice of Violation from Insp on 980222-0404.Violation Noted:Three Examples of Inadequate Accomplishment of Procedure Control Associated W/Temporary Equipment Installed in Plant Svc Water Intake Structure
IR 05000354/199800116 March 1998Insp Rept 50-354/98-01 on 980104-0221.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support