Issue date | Title | |
---|---|---|
LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes | 29 March 2023 | Submittal of Hope Creek Generating Station Technical Specification Bases Changes |
ML22298A054 | 24 October 2022 | Submittal of Updated Final Safety Analysis Report, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results |
LR-N21-0079, Submittal of Hope Creek Generating Station Technical Specification Bases Changes | 3 November 2021 | Submittal of Hope Creek Generating Station Technical Specification Bases Changes |
LR-N20-0060, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 29 September 2020 | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements |
ML20142A549 | 21 May 2020 | 4 to Updated Final Safety Analysis Report, Section 6, Engineered Safety Features |
LR-N20-0033, Submittal of Hope Creek Generating Station Technical Specification Bases Changes | 15 May 2020 | Submittal of Hope Creek Generating Station Technical Specification Bases Changes |
ML19136A026 | 11 July 2019 | Issuance of Relief Request No. HC-I3R-08, Revision 0, Use of the ASME Code |
LR-N18-0087, Submittal of Relief Request Associated with the Third Inservice Inspection (ISI) Interval | 24 September 2018 | Submittal of Relief Request Associated with the Third Inservice Inspection (ISI) Interval |
IR 05000354/2017004 | 6 February 2018 | Integrated Inspection Report 05000354/2017004 |
LR-N16-0156, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | 7 October 2016 | License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies |
ML14332A154 | 12 February 2015 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) |
LR-N14-0155, PSEG Nuclear LLC, Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA- | 25 June 2014 | PSEG Nuclear LLC, Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13- |
IR 05000354/2013005 | 11 February 2014 | IR 05000354-13-005, October 1, 2013, Through December 31, 2013, Hope Creek, Unit 1, Integrated Inspection Report and Exercise of Enforcement Discretion |
IR 05000354/2012005 | 11 February 2013 | IR 05000354-12-005; 10/01/2012 - 12/31/2012; Hope Creek Generating Station; Flood Protection Measures |
IR 05000354/2012004 | 14 November 2012 | IR 05000354-12-004; Hope Creek Generating Station Unit 1 - NRC Integrated Inspection Report and Exercise of Enforcement Discretion (07-01-12 - 09-30-12) |
IR 05000354/2012003 | 10 August 2012 | IR 05000354-12-003; 04/01/2012 - 06/30/2012; Hope Creek Generating Station; Maintenance Effectiveness, Follow-Up of Events and Notices of Enforcement Discretion |
IR 05000354/2012002 | 3 May 2012 | IR 05000354-12-002; 01-01-12 - 03-31-12; Hope Creek Generating Station - NRC Integrated Inspection Report |
LR-N11-0289, Site-Specific Cost Estimates | 15 September 2011 | Site-Specific Cost Estimates |
ML110600557 | 1 March 2011 | Minutes of the Meeting of the Subcommittee on Plant License Renewal Regarding Hope Creek Generating Plant on November 3, 2010, in Rockville, Maryland |
IR 05000354/2010004 | 8 November 2010 | IR 05000354-10-004, on 07-01-10 - 09-30-10, Hope Creek Generating Station - NRC Integrated Inspection Report |
LR-N09-0014, Submittal of Biennial Decommissioning Funding Status Report | 23 June 2009 | Submittal of Biennial Decommissioning Funding Status Report |
ML081780120 | 8 September 2008 | Units 1 & 2-Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, & Containment Spray Systems, Proposed Alternative Course of Action (Tac MD7835, MD7874, & MD7875) |
LR-N08-0073, Transmittal of Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | 10 April 2008 | Transmittal of Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems |
IR 05000272/2007006 | 3 May 2007 | IR 0500272-07-006, 05000311-07-006, and 05000354-07-007, on 03/05/2007 - 03/23/2007; Salem Nuclear Generating Station Units 1 and 2 and Hope Creek; Biennial Baseline Inspection of the Identification and Resolution of Problems (Pi&R) |
ML061980097 | 7 July 2006 | Raw Information from Salem Interviews |
ML061980254 | 7 July 2006 | OI Notes |
LR-N05-0415, July 2005 Monthly Operating Report for Hope Creek Generating Station | 15 August 2005 | July 2005 Monthly Operating Report for Hope Creek Generating Station |
ML050060114 | 23 December 2004 | Design Change Package 80062466 Revision 3 Extended Power Uprate Piping Vibration Monitoring, Installation Package, 12/23/2004 |
ML050060054 | 19 October 2004 | Design Change Package 80062466 Revision 1 Extended Power Uprate Piping Vibration Monitoring Installation Package, 10/19/2004 |
ML061980095 | 9 June 2004 | OI Memo to DRP on SCWE Interviews and Acquisition of Employee Concerns Program Documents (Case No. 1-2003-051F) |
ML041460481 | 21 May 2004 | Attachment to 5/21/04 PSEG Ltr - USA Final Report - PSEG Nuclear, LLC Salem / Hope Creek Safety Culture Assessment |
ML050140253 | 29 April 2004 | HC-04Q-301 Hope Creek Extended Power Uprate Piping Vibration Monitoring, 4/29/2004 |
ML062630408 | 1 March 2004 | PSEG Nuclear, LLC Salem/Hope Creek Safety Culture Assessment |
ML061790723 | 16 December 2003 | OI Interview Transcript of Witness |
ML061770117 | 29 October 2003 | OI Interview Transcript of Witness, Pages 1-153 |
ML061800208 | 23 October 2003 | OI Interview Transcript of Witness |
ML061770493 | 23 October 2003 | OI Interview Transcript of Witness, Pages 1-95 |
ML061810057 | 22 October 2003 | OI Interview Transcript of Witness |
ML061790726 | 22 October 2003 | OI Interview Transcript of Witness |
ML061980086 | 22 October 2003 | Notes for Multiple (3) Witnesses Interview Material |
ML061790690 | 21 October 2003 | OI Interview Transcript of Witness |
ML062540193 | 25 March 2003 | to (28 Pages) with Attachments. 03/17/2003 Operational Transient Event at Hope Creek |
ML052490066 | 9 September 2002 | E-Mail from Vito to Blough, Additional Information Received from RI-2002-A-0116 Alleger (Hope Creek Bogus Sample Guy) |
ML021350211 | 18 March 2002 | Final RO & SRO Written Post Exam Comments |
ML20151Z594 | 11 September 1998 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/98-02 on 980423.Response Indicated Violations Corrected & Measures Initiated to Prevent Recurrence |
NRC Generic Letter 1998-04 | 14 July 1998 | NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i |
IR 05000354/1998005 | 4 June 1998 | Insp Rept 50-354/98-05 on 980405-0516.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support |
ML20248C425 | 26 May 1998 | Responds to NRC Re Violations Noted in Insp Rept 50-354/98-02.Corrective Actions:Work Order Activity Was Added to Service Water Strainer Preventive Maint Work Order to Control Platform Installation |
ML20217H805 | 23 April 1998 | Notice of Violation from Insp on 980222-0404.Violation Noted:Three Examples of Inadequate Accomplishment of Procedure Control Associated W/Temporary Equipment Installed in Plant Svc Water Intake Structure |
IR 05000354/1998001 | 16 March 1998 | Insp Rept 50-354/98-01 on 980104-0221.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support |