NRC Generic Letter 1998-0414 July 1998NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i
ML20135D78927 February 1997Forwards Responses to Comments Re Fort St Vrain Final Survey Rept
ML20133E0482 January 1997Forwards Comments to Fsv Nuclear Station, Decommissioning Project Final Survey Rept (Volumes 4-11), for Consideration
ML20134F43530 October 1996Forwards Sections 1,2,6 & 8 from Survey Packages F0015, F0039 & F0126 & Sections 1,2 & 6 from Survey Package F0115 to Support on-site NRC Insp
ML20095K41326 December 1995Rev 3 to Decommissioning Plan
ML20093F47512 October 1995Forwards Survey Package Examples for Info
ML20084B88025 May 1995Rev 1 to Fsv Nuclear Station Decommissioning Project Final Survey Plan for Site Release
ML20086S2479 February 1995Decommissioning Plan for Fort St Vrain Nuclear Generating Station
ML20137S23331 December 1994Rept of Independent Counsel Investigation Concerning Issues at Fort St Vrain Nuclear Generating Station Decommissioning Project, Dec 1994
ML20078K72317 November 1994Forwards Suppl Info Re Proposed Mod to Removable Surface Contamination Release Criteria for Tritium & Fe-55,submitted Via Util ,In Response to NRC 941027 Telcon RAI
ML20086S25630 March 1994Forwards Summary of Radiation Exposures Received for 1993
Information Notice 1992-75, Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants12 November 1992Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants
ML20104B3304 September 1992Forwards Response to NRC 920716 Meeting Request Re Decommissioning Plan Changes,Consisting of Current Status of Decommissioning Preparations
ML20095L06730 April 1992Suppl to Applicants Environ Rept - Post Operating License Stage - Decommissioning
ML20095E96017 April 1992Rev to Fort St Vrain Proposed Decommissioning Plan
ML20082C50231 July 1991Suppl to Applicants Environ Rept - Post Operating License Stage - Decommissioning
ML20081F6275 June 1991Nonproprietary, Fort St Vrain Decommissioning Cost Estimate for PSC of Co
ML19332E8181 December 1989Rev a to Fort St Vrain Site-Specific Decommissioning Cost Estimate Basis for Preliminary Decommissioning Plan.
IR 05000267/198802029 September 1988Insp Rept 50-267/88-20 on 880801-0910.Violations Noted. Major Areas Inspected:Operational Safety Verification,Ler Review,Monthly Maint Observations,Esf Walkdown,Radiological Protection & Security Observations
ML20155B8412 September 1988Operational Safety Team Insp Rept 50-267/88-200 on 880509-20.Major Areas Inspected:Operations,Maint, Surveillance,Mgt Oversight,Safety Review & QA Programs
ML20214F65918 November 1986Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/86-19. Supplemental NDE Van Info Encl
ML20137L92631 December 1985Heat Stress Mgt Program for Nuclear Power Industry, Interim Rept
Information Notice 1985-43, Radiography Events at Power Reactors30 May 1985Radiography Events at Power Reactors
ML20197H2078 June 1984Discusses Program for Cleanup of Reactor Bldg Keyway,Turbine Bldg,Access Bay & Refueling Bay.Program Underway on Levels 1,2 & 3 of Reactor Bldg & Level 5 of Turbine Bldg.Program Scheduled for Completion 841231