Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23335A006 | 1 December 2023 | Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 |
NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval | 5 June 2023 | Snubber Program for the Fourth 10-Year Testing Interval |
ML22325A134 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 4 August 2022 | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements |
IR 05000341/2021004 | 7 February 2022 | Integrated Inspection Report 05000341/2021004 |
ML22004A268 | 4 January 2022 | Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2022001 |
IR 05000341/2021003 | 28 October 2021 | Integrated Inspection Report 05000341/2021003 |
ML21328A166 | 16 June 2021 | Proposed Written Exam with Answer Key |
ML21327A326 | 16 June 2021 | Administered Written Exam with Answer Key |
IR 05000341/2021001 | 4 May 2021 | Integrated Inspection Report 05000341/2021001 |
ML21055A072 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
IR 05000341/2020001 | 14 May 2020 | Integrated Inspection Report 05000341/2020001 |
IR 05000341/2018010 | 2 January 2019 | NRC Triennial Inspection of Evaluation of Changes, Tests and Experiments Inspection Report 05000341/2018010 (DRS-A.Dahbur) |
ML18221A506 | 7 August 2018 | Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2018003 (DRS-E.Fernandez) |
ML18128A131 | 26 April 2018 | 2018 Fermi Ile Proposed Files Operating Test |
NRC-17-0067, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | 31 August 2017 | Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. |
ML16165A460 | 26 May 2016 | Revision 20 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems | 26 May 2016 | Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML15231A161 | 17 August 2015 | Ltr. 08/17/15 Fermi Power Plant - Notification of NRC Inspection and Request for Information (Txb) |
ML15077A574 | 1 April 2015 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 1 of Order EA-13-109,Severe Accident Capable Hardened Vents. |
IR 05000341/2015008 | 31 March 2015 | IR 05000341/2015008; on 01/26/2015 - 03/09/2015; Fermi Power Plant, Unit 2; Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications |
NRC-15-0041, Resubmittal of Phase 1 Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) | 19 March 2015 | Resubmittal of Phase 1 Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
ML15114A327 | 31 October 2014 | Revision 19 to Updated Final Safety Analysis Report Chapter 9 - Redacted. Part 2 of 2 |
NRC-14-0043, DTE Electric Company'S Phase 1 Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-1 | 30 June 2014 | DTE Electric Company'S Phase 1 Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
ML13353A609 | 19 December 2013 | ISI Request for Information |
IR 05000341/2013003 | 29 July 2013 | IR 05000341-13-003, 04/01/2013 - 06/30/2013, Fermi Power Plant, Unit 2, NRC Integrated Inspection |
NRC-13-0008, DTE Electric Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Containment Hardened Vents (Order Number EA-12-050) | 28 February 2013 | DTE Electric Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Containment Hardened Vents (Order Number EA-12-050) |
NRC-12-0075, TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix D, Page D-212 Through End | 20 November 2012 | TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix D, Page D-212 Through End |
ML12341A363 | 20 November 2012 | TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Cover Through Appendix C, Page C-42 |
ML12341A369 | 20 November 2012 | TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix D, Page D-8 Through Page D-108 |
IR 05000341/2011002 | 2 May 2011 | IR 05000341-11-002, on 01/01/2011 - 03/31/2011, Fermi Power Plant, Unit 2, Routine Integrated, Maintenance Effectiveness, Outage Activities, Identification and Resolution of Findings |
IR 05000341/2010005 | 3 February 2011 | IR 05000341-10-005, 10/01/2010 - 12/31/2010; Fermi Power Plant, Unit 2; Routine Integrated Ir. Operability Evaluations and Follow-Up of Events and Notices of Enforcement Discretion |
IR 05000341/2010004 | 20 October 2010 | IR 05000341-10-004, on 07/01/2010 - 09/30/2010; Detroit Edison Company; 07/01/2010 - 09/30/2010; Fermi Power Plant, Unit 2, Routine Integrated Inspection Report |
ML101180295 | 27 April 2010 | IR 05000341-10-006; on 01/25 - 04/05/2010; Fermi Power Plant, Unit 2; Component Design Bases Inspection (CDBI) |
IR 05000341/2009007 | 10 November 2009 | IR 05000341-09-007 on 09/21/2009 - 10/5/2009 for Fermi Power Plant, Unit 2, Biennial Problem Identification |
IR 05000341/2009003 | 5 August 2009 | IR 05000341-09-003, on 04/01/2009 - 06/30/2009, Fermi Power Plant, Unit 2; Outage Activities, Problem Identification and Resolution, Follow Up of Events and Notices of Enforcement Discretion |
NRC-08-0032, Supplement to Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling Decay Heat Removal and Containment Spray Systems. | 29 July 2009 | Supplement to Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling Decay Heat Removal and Containment Spray Systems. |
NRC-08-0064, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | 14 October 2008 | Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems |
ML081090197 | 11 April 2008 | Fermi 2, Three Month Response to NRC GL-08-001 |
IR 05000341/2007006 | 13 February 2008 | IR 05000341-07-006, on 10/01/2007 - 12/31/2007 for Fermi, Unit 2, In-Service Inspection Activities, Licensed Operator Requalification Program, Maintenance Risk Assessments and Emergent Work Control, Post-Maintenance |
ML062430336 | 31 August 2006 | 8/31/06 Fermi, Unit 2 - Mid-Cycle Performance Review and Inspection Plan |
IR 05000341/2005014 | 25 October 2005 | IR 05000341-05-014 on 07/01/2005-09/30/2005 for Fermi Power Plant, Unit 2; Operability Evaluations, Event Follow-up |
IR 05000341/2004008 | 4 February 2005 | IR 05000341-04-008 on 10/01/2004-12/31/2004 for Fermi, Unit 2; Inservice Inspection Activities, Refueling Outage, Surveillance Testing, Event Followup |
IR 05000341/2004007 | 1 November 2004 | IR 05000341-04-007; on 07/01/2004-09/30/2004; Fermi Power Plant, Unit 2; Surveillance Testing; Problem Identification and Resolution; Event Follow-Up |
ML041890307 | 18 April 2004 | Event Notification Report for April 18, 2000 |
ML062630408 | 1 March 2004 | PSEG Nuclear, LLC Salem/Hope Creek Safety Culture Assessment |
NRC-02-0010, Special Report of Inoperable Main Steam Line Isolation Valve Position Indication | 31 January 2002 | Special Report of Inoperable Main Steam Line Isolation Valve Position Indication |
ML20197J984 | 2 December 1998 | Advises of Planned Insp Effort for Next 6 Months at Fermi. Encl Info Provided to Minimize Resource Impact on Staff & to Allow for Scheduling Conflicts & Personnel Availability to Be Resolved in Advance of Inspector Arrival Onsite |
IR 05000341/1998016 | 6 October 1998 | Insp Rept 50-341/98-16 on 981014-18.No Violations Noted. Major Areas Inspected:Alara Planning & Controls for Sixth Refueling Outage,Internal Exposure Monitoring,Radiological Surveys & Posting & Radiation Worker Performance |
ML20237E117 | 25 August 1998 | Safety Evaluation Accepting Licensee Relief Requests for First 10-yr Interval Inservice Insp Nondestructive Exam Program |