 Issue dateTitle
ML23335A0061 December 2023Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002
NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval5 June 2023Snubber Program for the Fourth 10-Year Testing Interval
ML22325A13417 November 20224 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements4 August 2022Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements
IR 05000341/20210047 February 2022Integrated Inspection Report 05000341/2021004
ML22004A2684 January 2022Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2022001
IR 05000341/202100328 October 2021Integrated Inspection Report 05000341/2021003
ML21328A16616 June 2021Proposed Written Exam with Answer Key
ML21327A32616 June 2021Administered Written Exam with Answer Key
IR 05000341/20210014 May 2021Integrated Inspection Report 05000341/2021001
ML21055A0722 February 20213 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
IR 05000341/202000114 May 2020Integrated Inspection Report 05000341/2020001
IR 05000341/20180102 January 2019NRC Triennial Inspection of Evaluation of Changes, Tests and Experiments Inspection Report 05000341/2018010 (DRS-A.Dahbur)
ML18221A5067 August 2018Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2018003 (DRS-E.Fernandez)
ML18128A13126 April 20182018 Fermi Ile Proposed Files Operating Test
NRC-17-0067, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.31 August 2017Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.
ML16165A46026 May 2016Revision 20 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems26 May 2016Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML15231A16117 August 2015Ltr. 08/17/15 Fermi Power Plant - Notification of NRC Inspection and Request for Information (Txb)
ML15077A5741 April 2015Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 1 of Order EA-13-109,Severe Accident Capable Hardened Vents.
IR 05000341/201500831 March 2015IR 05000341/2015008; on 01/26/2015 - 03/09/2015; Fermi Power Plant, Unit 2; Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
NRC-15-0041, Resubmittal of Phase 1 Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)19 March 2015Resubmittal of Phase 1 Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
ML15114A32731 October 2014Revision 19 to Updated Final Safety Analysis Report Chapter 9 - Redacted. Part 2 of 2
NRC-14-0043, DTE Electric Company'S Phase 1 Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-130 June 2014DTE Electric Company'S Phase 1 Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
ML13353A60919 December 2013ISI Request for Information
IR 05000341/201300329 July 2013IR 05000341-13-003, 04/01/2013 - 06/30/2013, Fermi Power Plant, Unit 2, NRC Integrated Inspection
NRC-13-0008, DTE Electric Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Containment Hardened Vents (Order Number EA-12-050)28 February 2013DTE Electric Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Containment Hardened Vents (Order Number EA-12-050)
NRC-12-0075, TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix D, Page D-212 Through End20 November 2012TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix D, Page D-212 Through End
ML12341A36320 November 2012TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Cover Through Appendix C, Page C-42
ML12341A36920 November 2012TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix D, Page D-8 Through Page D-108
IR 05000341/20110022 May 2011IR 05000341-11-002, on 01/01/2011 - 03/31/2011, Fermi Power Plant, Unit 2, Routine Integrated, Maintenance Effectiveness, Outage Activities, Identification and Resolution of Findings
IR 05000341/20100053 February 2011IR 05000341-10-005, 10/01/2010 - 12/31/2010; Fermi Power Plant, Unit 2; Routine Integrated Ir. Operability Evaluations and Follow-Up of Events and Notices of Enforcement Discretion
IR 05000341/201000420 October 2010IR 05000341-10-004, on 07/01/2010 - 09/30/2010; Detroit Edison Company; 07/01/2010 - 09/30/2010; Fermi Power Plant, Unit 2, Routine Integrated Inspection Report
ML10118029527 April 2010IR 05000341-10-006; on 01/25 - 04/05/2010; Fermi Power Plant, Unit 2; Component Design Bases Inspection (CDBI)
IR 05000341/200900710 November 2009IR 05000341-09-007 on 09/21/2009 - 10/5/2009 for Fermi Power Plant, Unit 2, Biennial Problem Identification
IR 05000341/20090035 August 2009IR 05000341-09-003, on 04/01/2009 - 06/30/2009, Fermi Power Plant, Unit 2; Outage Activities, Problem Identification and Resolution, Follow Up of Events and Notices of Enforcement Discretion
NRC-08-0032, Supplement to Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling Decay Heat Removal and Containment Spray Systems.29 July 2009Supplement to Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling Decay Heat Removal and Containment Spray Systems.
NRC-08-0064, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems14 October 2008Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
ML08109019711 April 2008Fermi 2, Three Month Response to NRC GL-08-001
IR 05000341/200700613 February 2008IR 05000341-07-006, on 10/01/2007 - 12/31/2007 for Fermi, Unit 2, In-Service Inspection Activities, Licensed Operator Requalification Program, Maintenance Risk Assessments and Emergent Work Control, Post-Maintenance
ML06243033631 August 20068/31/06 Fermi, Unit 2 - Mid-Cycle Performance Review and Inspection Plan
IR 05000341/200501425 October 2005IR 05000341-05-014 on 07/01/2005-09/30/2005 for Fermi Power Plant, Unit 2; Operability Evaluations, Event Follow-up
IR 05000341/20040084 February 2005IR 05000341-04-008 on 10/01/2004-12/31/2004 for Fermi, Unit 2; Inservice Inspection Activities, Refueling Outage, Surveillance Testing, Event Followup
IR 05000341/20040071 November 2004IR 05000341-04-007; on 07/01/2004-09/30/2004; Fermi Power Plant, Unit 2; Surveillance Testing; Problem Identification and Resolution; Event Follow-Up
ML04189030718 April 2004Event Notification Report for April 18, 2000
ML0626304081 March 2004PSEG Nuclear, LLC Salem/Hope Creek Safety Culture Assessment
NRC-02-0010, Special Report of Inoperable Main Steam Line Isolation Valve Position Indication31 January 2002Special Report of Inoperable Main Steam Line Isolation Valve Position Indication
ML20197J9842 December 1998Advises of Planned Insp Effort for Next 6 Months at Fermi. Encl Info Provided to Minimize Resource Impact on Staff & to Allow for Scheduling Conflicts & Personnel Availability to Be Resolved in Advance of Inspector Arrival Onsite
IR 05000341/19980166 October 1998Insp Rept 50-341/98-16 on 981014-18.No Violations Noted. Major Areas Inspected:Alara Planning & Controls for Sixth Refueling Outage,Internal Exposure Monitoring,Radiological Surveys & Posting & Radiation Worker Performance
ML20237E11725 August 1998Safety Evaluation Accepting Licensee Relief Requests for First 10-yr Interval Inservice Insp Nondestructive Exam Program