Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
NLS2023007, Technical Specification Bases Changes | 17 April 2023 | Technical Specification Bases Changes |
IR 05000298/2022002 | 28 July 2022 | Integrated Inspection Report 05000298/2022002 |
ML22208A064 | 26 July 2022 | Notification of Inspection and Request for Information for NRC Inspection Report 05000298/2022004 |
IR 05000298/2022010 | 16 June 2022 | Triennial Fire Protection Inspection Report 05000298/2022010 |
IR 05000298/2018004 | 28 January 2019 | NRC Integrated Inspection Report 05000298/2018004 |
ML18045A052 | 27 June 2018 | Flood Hazard Mitigating Strategies Assessment (Public) |
NLS2017096, Additional Risk-Related Information for November 7, 2017, Regulatory Conference | 31 October 2017 | Additional Risk-Related Information for November 7, 2017, Regulatory Conference |
NLS2017048, Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control | 7 August 2017 | Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control |
IR 05000298/2016004 | 26 January 2017 | NRC Integrated Inspection Report 05000298/2016004 and Exercise of Enforcement Discretion |
05000298/LER-2016-003 | 9 November 2016 | Scaffold Construction Places Plant in a Condition Prohibited by Technical Specifications LER 16-003-00 for Cooper Nuclear Station RE: Scaffold Construction Places Plant in a Condition Prohibited by Technical Specifications |
NLS2015137, Phase 1 and Phase 2 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) | 21 December 2015 | Phase 1 and Phase 2 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
ML15006A234 | 11 February 2015 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) |
NLS2014101, First Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109) | 19 December 2014 | First Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109) |
IR 05000298/2014003 | 12 August 2014 | IR 05000298-14-003; 04/01/2014 - 06/30/2014; Cooper Nuclear Station; Integrated Resident & Regional Report; Equipment Alignment, Maintenance Effectiveness, Operability Determination and Functionality Assessment |
NLS2014057, Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order No. EA-13-109) | 30 June 2014 | Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order No. EA-13-109) |
IR 05000298/2014002 | 15 May 2014 | IR 05000298-14-002; 01/01/2014 - 03/31/2014; Cooper; Integ. Resident & Regl. Rprt; Maint. Risk Assess. & Emerg. Work Control, Op. Determ. & Funct. Assess., Prob. Ident. & Resol., & Follow-up of Events & NOED |
NLS2013025, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) | 28 February 2013 | Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) |
IR 05000298/2012005 | 14 February 2013 | IR 05000298-12-005; 09/27/2012 - 12/31/2012; Cooper Nuclear Station, Integrated Resident and Regional Report; Adverse Weather Protection, Maintenance Effectiveness, Operability Evaluations and Functionality Assessments, Refueling and Other |
ML12340A273 | 27 November 2012 | Engineering Evaluation 12-E18, Revision 0, Attachment D - Area Walk-By Checklists |
ML12340A275 | 27 November 2012 | Engineering Evaluation 12-E18, Revision 0, Attachment E Through J |
NLS2012124, Enclosure to NLS2012124, Cooper Nuclear Station Flooding Walkdown Report | 26 November 2012 | Enclosure to NLS2012124, Cooper Nuclear Station Flooding Walkdown Report |
ML12314A372 | 9 November 2012 | IR 05000298-12-004; 06/27/2012 - 09/26/2012; Cooper Nuclear Station, Integrated Resident and Regional Report; Equipment Alignment, Licensed Operator Requalification Program and Licensed Operator Performance, Maintenance Risk Assessments and |
IR 05000298/2011003 | 5 August 2011 | IR 05000298-11-003; 03/25/2011 06/23/2011; Cooper Nuclear Station, Integrated Resident and Regional Report; Flood Protection Measures, Operability Evaluations, Refueling and Other Outage Activities, Radiological Hazard Assessment and Exposu |
IR 05000298/2009004 | 29 October 2009 | IR 05000298-09-004; 06/24/09 - 09/23/09; Cooper Nuclear Station, Integrated Resident and Regional Report; Fire Protection, Flood Protection Measures, Other Activities |
IR 05000298/2009002 | 30 April 2009 | IR 05000298-09-002 on 01/01/09 - 03/24/09 for Cooper |
NLS2008098, Decommissioning Cost Analysis | 15 December 2008 | Decommissioning Cost Analysis |
ML082740251 | 3 October 2008 | Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Proposed Alternative Course of Action |
ML083030242 | 24 September 2008 | Cooper Nuclear Station, License Renewal Application, Appendix B, Aging Management Programs and Activities |
NLS2008074, Request for Extension to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Dated January 11, 2008 | 11 September 2008 | Request for Extension to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Dated January 11, 2008 |
IR 05000298/2008003 | 4 August 2008 | IR 05000298-08-003 on 3/23/08 - 6/21/08 for Cooper |
ML081270639 | 6 May 2008 | IR 05000298-08-002; on 01/01/2008 - 03/22/2008; Cooper Nuclear Station. Plant Modifications and Postmaintenance Testing |
NLS2008019, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate | 6 March 2008 | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate |
IR 05000298/2006004 | 7 November 2006 | IR 05000298-06-004; 06/25/2006 - 09/23/06; Cooper Nuclear Station. Maintenance Risk Assessments and Emergent Work Evaluation, Operability Evaluations, Identification and Resolution of Problems, Other Activities |
ML062000107 | 23 August 2006 | Fourth 10-Year Interval Inservice Inspection Relief Request RI-37 |
IR 05000298/2006003 | 17 July 2006 | IR 05000298-06-003 on 3/25/06 - 06/24/06 for Cooper Nuclear Station - Fire Protection Personnel Performance During Nonroutine Plant Evolutions and Events |
NLS2006020, 10 CFR 50.55a Request Number RI-37, Revision 0 | 24 February 2006 | 10 CFR 50.55a Request Number RI-37, Revision 0 |
NLS2005087, Inservice Inspection Relief Request RI-37, Revision 0 | 19 September 2005 | Inservice Inspection Relief Request RI-37, Revision 0 |
NLS2005071, 10 CFR 71.95 Report of Failure to Meet Conditions in Certificate of Compliance During Radioactive Material Shipment Cooper Nuclear Station | 6 September 2005 | 10 CFR 71.95 Report of Failure to Meet Conditions in Certificate of Compliance During Radioactive Material Shipment Cooper Nuclear Station |
NLS2005018, Semiannual Fitness for Duty Program Performance Report | 16 February 2005 | Semiannual Fitness for Duty Program Performance Report |
IR 05000298/2004004 | 4 November 2004 | IR 05000298-04-004, on 06/24/2004 - 09/23/2004, for Cooper Nuclear Station, Heat Sink Performance, Ti 2515/159, Maintenance Rule Implementation, Operability Evaluations & Event Followup, Access Control to Radiologically Significant Areas |
ML062630408 | 1 March 2004 | PSEG Nuclear, LLC Salem/Hope Creek Safety Culture Assessment |
IR 05000298/2003006 | 30 October 2003 | IR 05000298-03-006, on 06/29/2003 - 09/27/2003, Cooper Nuclear Station: Licensed Operator Requalifications, Personnel Performance During Nonroutine Evolutions, Operability Evaluations, Event Followup, Identification and Resolution of Proble |
IR 05000298/2003003 | 14 July 2003 | IR 05000298-03-003, on 05/03/2003 - 05/23/2003, Cooper Nuclear Station; Safety System Design and Performance Capability |
IR 05000285/2003004 | 14 July 2003 | IR 05000285-03-004, on 03/23/2003 - 06/21/2003; for Fort Calhoun Station, Integrated Resident and Regional Report |
NLS2002141, the Strategic Improvement Plan, Revision 2, Appendix A-3, Action Plan 5.4.1.4 | 25 November 2002 | the Strategic Improvement Plan, Revision 2, Appendix A-3, Action Plan 5.4.1.4 |
IR 05000298/2002005 | 13 June 2002 | IR 05000298/2002-005, Cooper Nuclear Station, Inspection on 04/15/2002-04/18/2002 Related to Degraded Emergency Preparedness Cornerstone in Reactor Safety Strategic Performance Area Resulting from Multiple White Inspection. Violations Noted |
ML023010176 | 10 June 2002 | TIP Action Plan, Revision 1 |
IR 05000298/2001008 | 3 May 2002 | IR 05000298/2001-008, Cooper Nuclear Station, Inspection on 12/30/2001 - 04/06/2002, Related to Mitigating System, Occupational Radiation Safety & Security Posture. Non-Cited Violations Noted |
IR 05000298/2001007 | 4 February 2002 | IR 05000298/2001-007; 10/07/2001-12/29/2001; Nebraska Public Power District; Cooper Nuclear Station. Integrated Resident/Regional Report; Fire Protection, Operability Evaluations, Surveillance Testing, Occupational Radiation Safety. Non-cit |
IR 05000298/2001010 | 9 January 2002 | IR 05000298/2001-010, Cooper Nuclear Station, Inspection on 09/10/2001 - 09/21/2001 Related to Identification and Resolution of Problems, Mitigating Systems, Barrier Integrity, Initiating Events. No Violations Noted |