Semantic search

Jump to navigation Jump to search
 Issue dateTitle
NLS2023007, Technical Specification Bases Changes17 April 2023Technical Specification Bases Changes
IR 05000298/202200228 July 2022Integrated Inspection Report 05000298/2022002
ML22208A06426 July 2022Notification of Inspection and Request for Information for NRC Inspection Report 05000298/2022004
IR 05000298/202201016 June 2022Triennial Fire Protection Inspection Report 05000298/2022010
IR 05000298/201800428 January 2019NRC Integrated Inspection Report 05000298/2018004
ML18045A05227 June 2018Flood Hazard Mitigating Strategies Assessment (Public)
NLS2017096, Additional Risk-Related Information for November 7, 2017, Regulatory Conference31 October 2017Additional Risk-Related Information for November 7, 2017, Regulatory Conference
NLS2017048, Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control7 August 2017Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control
IR 05000298/201600426 January 2017NRC Integrated Inspection Report 05000298/2016004 and Exercise of Enforcement Discretion
05000298/LER-2016-0039 November 2016Scaffold Construction Places Plant in a Condition Prohibited by Technical Specifications
LER 16-003-00 for Cooper Nuclear Station RE: Scaffold Construction Places Plant in a Condition Prohibited by Technical Specifications
NLS2015137, Phase 1 and Phase 2 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)21 December 2015Phase 1 and Phase 2 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
ML15006A23411 February 2015Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents)
NLS2014101, First Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109)19 December 2014First Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109)
IR 05000298/201400312 August 2014IR 05000298-14-003; 04/01/2014 - 06/30/2014; Cooper Nuclear Station; Integrated Resident & Regional Report; Equipment Alignment, Maintenance Effectiveness, Operability Determination and Functionality Assessment
NLS2014057, Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order No. EA-13-109)30 June 2014Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order No. EA-13-109)
IR 05000298/201400215 May 2014IR 05000298-14-002; 01/01/2014 - 03/31/2014; Cooper; Integ. Resident & Regl. Rprt; Maint. Risk Assess. & Emerg. Work Control, Op. Determ. & Funct. Assess., Prob. Ident. & Resol., & Follow-up of Events & NOED
NLS2013025, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050)28 February 2013Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050)
IR 05000298/201200514 February 2013IR 05000298-12-005; 09/27/2012 - 12/31/2012; Cooper Nuclear Station, Integrated Resident and Regional Report; Adverse Weather Protection, Maintenance Effectiveness, Operability Evaluations and Functionality Assessments, Refueling and Other
ML12340A27327 November 2012Engineering Evaluation 12-E18, Revision 0, Attachment D - Area Walk-By Checklists
ML12340A27527 November 2012Engineering Evaluation 12-E18, Revision 0, Attachment E Through J
NLS2012124, Enclosure to NLS2012124, Cooper Nuclear Station Flooding Walkdown Report26 November 2012Enclosure to NLS2012124, Cooper Nuclear Station Flooding Walkdown Report
ML12314A3729 November 2012IR 05000298-12-004; 06/27/2012 - 09/26/2012; Cooper Nuclear Station, Integrated Resident and Regional Report; Equipment Alignment, Licensed Operator Requalification Program and Licensed Operator Performance, Maintenance Risk Assessments and
IR 05000298/20110035 August 2011IR 05000298-11-003; 03/25/2011 06/23/2011; Cooper Nuclear Station, Integrated Resident and Regional Report; Flood Protection Measures, Operability Evaluations, Refueling and Other Outage Activities, Radiological Hazard Assessment and Exposu
IR 05000298/200900429 October 2009IR 05000298-09-004; 06/24/09 - 09/23/09; Cooper Nuclear Station, Integrated Resident and Regional Report; Fire Protection, Flood Protection Measures, Other Activities
IR 05000298/200900230 April 2009IR 05000298-09-002 on 01/01/09 - 03/24/09 for Cooper
NLS2008098, Decommissioning Cost Analysis15 December 2008Decommissioning Cost Analysis
ML0827402513 October 2008Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Proposed Alternative Course of Action
ML08303024224 September 2008Cooper Nuclear Station, License Renewal Application, Appendix B, Aging Management Programs and Activities
NLS2008074, Request for Extension to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Dated January 11, 200811 September 2008Request for Extension to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Dated January 11, 2008
IR 05000298/20080034 August 2008IR 05000298-08-003 on 3/23/08 - 6/21/08 for Cooper
ML0812706396 May 2008IR 05000298-08-002; on 01/01/2008 - 03/22/2008; Cooper Nuclear Station. Plant Modifications and Postmaintenance Testing
NLS2008019, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate6 March 2008Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate
IR 05000298/20060047 November 2006IR 05000298-06-004; 06/25/2006 - 09/23/06; Cooper Nuclear Station. Maintenance Risk Assessments and Emergent Work Evaluation, Operability Evaluations, Identification and Resolution of Problems, Other Activities
ML06200010723 August 2006Fourth 10-Year Interval Inservice Inspection Relief Request RI-37
IR 05000298/200600317 July 2006IR 05000298-06-003 on 3/25/06 - 06/24/06 for Cooper Nuclear Station - Fire Protection Personnel Performance During Nonroutine Plant Evolutions and Events
NLS2006020, 10 CFR 50.55a Request Number RI-37, Revision 024 February 200610 CFR 50.55a Request Number RI-37, Revision 0
NLS2005087, Inservice Inspection Relief Request RI-37, Revision 019 September 2005Inservice Inspection Relief Request RI-37, Revision 0
NLS2005071, 10 CFR 71.95 Report of Failure to Meet Conditions in Certificate of Compliance During Radioactive Material Shipment Cooper Nuclear Station6 September 200510 CFR 71.95 Report of Failure to Meet Conditions in Certificate of Compliance During Radioactive Material Shipment Cooper Nuclear Station
NLS2005018, Semiannual Fitness for Duty Program Performance Report16 February 2005Semiannual Fitness for Duty Program Performance Report
IR 05000298/20040044 November 2004IR 05000298-04-004, on 06/24/2004 - 09/23/2004, for Cooper Nuclear Station, Heat Sink Performance, Ti 2515/159, Maintenance Rule Implementation, Operability Evaluations & Event Followup, Access Control to Radiologically Significant Areas
ML0626304081 March 2004PSEG Nuclear, LLC Salem/Hope Creek Safety Culture Assessment
IR 05000298/200300630 October 2003IR 05000298-03-006, on 06/29/2003 - 09/27/2003, Cooper Nuclear Station: Licensed Operator Requalifications, Personnel Performance During Nonroutine Evolutions, Operability Evaluations, Event Followup, Identification and Resolution of Proble
IR 05000298/200300314 July 2003IR 05000298-03-003, on 05/03/2003 - 05/23/2003, Cooper Nuclear Station; Safety System Design and Performance Capability
IR 05000285/200300414 July 2003IR 05000285-03-004, on 03/23/2003 - 06/21/2003; for Fort Calhoun Station, Integrated Resident and Regional Report
NLS2002141, the Strategic Improvement Plan, Revision 2, Appendix A-3, Action Plan 5.4.1.425 November 2002the Strategic Improvement Plan, Revision 2, Appendix A-3, Action Plan 5.4.1.4
IR 05000298/200200513 June 2002IR 05000298/2002-005, Cooper Nuclear Station, Inspection on 04/15/2002-04/18/2002 Related to Degraded Emergency Preparedness Cornerstone in Reactor Safety Strategic Performance Area Resulting from Multiple White Inspection. Violations Noted
ML02301017610 June 2002TIP Action Plan, Revision 1
IR 05000298/20010083 May 2002IR 05000298/2001-008, Cooper Nuclear Station, Inspection on 12/30/2001 - 04/06/2002, Related to Mitigating System, Occupational Radiation Safety & Security Posture. Non-Cited Violations Noted
IR 05000298/20010074 February 2002IR 05000298/2001-007; 10/07/2001-12/29/2001; Nebraska Public Power District; Cooper Nuclear Station. Integrated Resident/Regional Report; Fire Protection, Operability Evaluations, Surveillance Testing, Occupational Radiation Safety. Non-cit
IR 05000298/20010109 January 2002IR 05000298/2001-010, Cooper Nuclear Station, Inspection on 09/10/2001 - 09/21/2001 Related to Identification and Resolution of Problems, Mitigating Systems, Barrier Integrity, Initiating Events. No Violations Noted