ML23010A1449 January 2023Inservice Inspection Request for Information
ML21299A01823 September 2021CP-2021-08-DRAFT Operating Test
ML21245A3072 September 2021Request for Information ML21245A307
ML20045E35113 February 2020Information Request February 13, 2020 Notification of Inspection and Request for Information Comanche Peak Unit 2 NRC Inspection Report 05000446/2020002
ML19221B7279 August 2019Integrated Inspection Report 05000445/2019002 and 05000446/2019002
ML19144A34322 May 2019Corrections for Comanche Peak Nuclear Power Plant, Units 1 and 2 - NRC Integrated Inspection Report 05000445/2019001 and 05000446/2019001
ML19130A15410 May 2019NRC Integrated Inspection Report 05000445/2019001 and 05000446/2019001
IR 05000445/201800411 February 2019NRC Integrated Inspection Report 05000445/2018004 and 05000446/2018004
ML20311A5826 November 20172017 Q1-Q4 ROP Inspection Findings
ML20311A6096 November 20172017 Q1-Q4 ROP Inspection Findings
CP-201700904, Response to Request for Additional Information Regarding Relief Request 1/2B3-2 for the Units 1 and 2 Third Ten Year Inservice Inspection Interval1 November 2017Response to Request for Additional Information Regarding Relief Request 1/2B3-2 for the Units 1 and 2 Third Ten Year Inservice Inspection Interval
ML17223A11610 August 2017NRC Integrated Inspection Report 05000445/2017002 and 05000446/2017002
ML16179A40511 July 2016Relief Request Nos. B-9, B-3, B-10, and B-11 for Piping Welds, Second 10-year Inservice Inspection Interval
CP-201501102, Response to Request for Additional Information for Relief Request B-10 for the Second Ten-Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME, Section...)14 December 2015Response to Request for Additional Information for Relief Request B-10 for the Second Ten-Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME, Section...)
CP-201500034, Licence Amendment Request 14-002, Extension of Containment Leakage Rate Testing Program28 January 2015Licence Amendment Request 14-002, Extension of Containment Leakage Rate Testing Program
ML14087A06610 April 2014Relief Request No. 1/2E-1 for Containment Electrical Penetrations for the Third 10-Year Inservice Inspection Interval
ML13296A54322 November 2013Audit Report for 7/9-11/2013 Audit Seismic Walkdowns to Support Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident
CP-201301278, Relief Request No. 1/2E3-1 for Containment Electrical Penetrations (Third IWE Interval: Start Date - September 10, 2012; End Date - September 9, 2021)31 October 2013Relief Request No. 1/2E3-1 for Containment Electrical Penetrations (Third IWE Interval: Start Date - September 10, 2012; End Date - September 9, 2021)
CP-201300982, 446 Submittal of Requested Information Identified During Regulatory Audit Regarding Seismic Walkdowns at CPNPP, Units 1 & 2, to Support Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-ichi Nuclear12 September 2013446 Submittal of Requested Information Identified During Regulatory Audit Regarding Seismic Walkdowns at CPNPP, Units 1 & 2, to Support Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-ichi Nuclear
ML13158A09326 June 2013Relief Request No. E-1 Containment Electrical Penetrations, for the Second 10-Year Inservice Inspection Interval
IR 05000445/20130022 May 2013IR 05000445-13-002, 0500446-13-002, 01/01/2013 - 03/27/2013; Comanche Peask Nuclear Power Plant, Units 1 & 2, Integrated Resident and Regional Report; Plant Modifications, Idenification and Resolution of Problems, Event Follow-up
CP-201200881, Relief Request No. E-1 for Containment Electrical Penetrations (Second IWE Interval End Date: September 9, 2011)16 August 2012Relief Request No. E-1 for Containment Electrical Penetrations (Second IWE Interval End Date: September 9, 2011)
ML12205A41211 June 2012CP-2012-06 Final Operating Test
ML12158A55711 June 2012CP-2012-06 Draft Ops Test SRO Admin Jpms, Determine Loss of RHR Time Limitations.
ML12152A39111 June 2012CP-2012-06 Draft Ops Test RO Admin Jpms, Determine Loss of RHR Time Limitations.
IR 05000445/201100612 September 2011IR 05000445-11-006, 05000446-11-006; 07/11/2011 7/28/2011; Comanche Peak Nuclear Power Plant Biennial Baseline Inspection of the Identification and Resolution of Problems.
ML11255063912 September 2011IR 05000445-11-006, 05000446-11-006; 07/11/2011 7/28/2011; Comanche Peak Nuclear Power Plant Biennial Baseline Inspection of the Identification and Resolution of Problems.
IR 05000445/201000329 July 2010IR 05000445-10-003, 05000446-10-003, on 03/21/2010 - 06/19/2010, Comanche Peak Nuclear Power Plant, Units 1 and 2, Radiological Hazard Assessment and Exposure Controls, and Identification and Resolution of Problems
ML11161A1499 June 2010L11-1621-001, Revision 0, Decommission Cost Study for the Comanche Peak Nuclear Power Plant, Attachment a
CP-200900520, License Amendment Request (LAR 09-003), Revision to Technical Specification 3.8.1, AC Sources - Operating, for One-Time, 14-Day Completion Time for Offsite Circuits26 October 2009License Amendment Request (LAR 09-003), Revision to Technical Specification 3.8.1, AC Sources - Operating, for One-Time, 14-Day Completion Time for Offsite Circuits
CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Cover Page Through Attachment a, Page 30 of 4513 October 2009Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Cover Page Through Attachment a, Page 30 of 45
CP-200901403, Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Cover Page Through Attachment a, Page 30 of 4513 October 2009Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Cover Page Through Attachment a, Page 30 of 45
IR 05000445/200800512 February 2009
CP-200801606, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a26 November 2008Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a
CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a26 November 2008Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a
ML0815600289 September 2008Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Proposed Alternative Course of Action
CP-200800540, Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.10 April 2008Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.
CP-200800265, Transmittal of Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors29 February 2008Transmittal of Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
ML0603903019 February 2006GSI Letter RAI Response to GL 2004-02 (TAC Nos. MC4676 and 4677)
IR 05000445/200500327 July 2005IR 05000445-05-003, 05000446-05-003; 03/25/2005-06/23/2005; Comanche Peak Steam Electric Station, Units 1 and 2; Licensed Operator Requalification and Event Follow-Up
CPSES-200500464, 90-day Response to NRC GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors7 March 200590-day Response to NRC GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors
IR 05000445/200400326 July 2004IR 05000445-04-003, 05000446-04-003, on 03/25/2004 - 06/23/2004, Comanche Peak Steam Electric Station, Units 1 2; Access Control to Radiologically Significant Areas; Notice of Violation
IR 05000445/200200527 January 2003IR 05000445-02-005, IR 05000446-02-005, on 10/06/2002 - 12/28/2002, Comanche Peak Steam Electric Station; Units 1 & 2. Integrated Resident & Regional Report; Refueling and Outage Activities, Event Followup
CPSES-210020236, Response to Request for Additional Information Regarding License Amendment Request (LAR) 01-14 Revision to Technical Specification 5.5.16 Containment Leakage Rate Testing Program12 June 2002Response to Request for Additional Information Regarding License Amendment Request (LAR) 01-14 Revision to Technical Specification 5.5.16 Containment Leakage Rate Testing Program
CPSES-200202193, April 2002 Monthly Operating Report for Comanche Peak Steam Electric Station, Units 1 and 216 May 2002April 2002 Monthly Operating Report for Comanche Peak Steam Electric Station, Units 1 and 2
ML02089000116 April 2002Relief Request for Relief from the Requirements of the ASME Boiler and Pressure Vessel Code, Granted
CPSES-200200025, Relief Requests from 1986 Edition of ASME Code, Section XI, No Addenda, Inservice Inspection (ISI) A-4 Through A-84 March 2002Relief Requests from 1986 Edition of ASME Code, Section XI, No Addenda, Inservice Inspection (ISI) A-4 Through A-8
IR 05000445/199901520 October 1999Insp Repts 50-445/99-15 & 50-446/99-15 on 990822-1002. Non-cited Violations.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support
IR 05000445/199901414 September 1999Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Operations,Maint,Engineering & Plant Support
IR 05000445/199901122 June 1999Insp Repts 50-445/99-11 & 50-446/99-11 on 990418-0529.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support