Issue date | Title | |
---|---|---|
ML23348A366 | 18 December 2023 | Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information |
ML23299A266 | 29 November 2023 | Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 |
ML23331A497 | 27 November 2023 | Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 |
ML23292A357 | 19 October 2023 | Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation |
ML23292A359 | 19 October 2023 | License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 |
ML23165A250 | 31 August 2023 | Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements |
ML23220A422 | 8 August 2023 | Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements |
IR 05000482/2023002 | 11 July 2023 | Integrated Inspection Report 05000482/2023002 |
ML23135A198 | 8 May 2023 | Calculation XX-E-013, Rev. 4, CN008, Post-Fire Safe Shutdown (PFSSD) Analysis |
ML23135A197 | 8 May 2023 | Calculation XX-E-013, Rev 4, CN009, Post-Fire Safe Shutdown (PFSSD) Analysis |
ML23135A184 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements - Part 1 of 2 |
ML23135A171 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML23135A173 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML23135A194 | 8 May 2023 | Calculation XX-E-013 Rev. 4, CN003, Post-Fire Safe Shutdown (PFSSD) Analysis |
ML23135A177 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management |
ML23135A174 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 8, Electric Power |
ML23135A180 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 14, Initial Test Program |
ML23135A199 | 8 May 2023 | Fire Hazard Analysis Report, E-1F9905 Rev 11, Post-Fire Shutdown Operator Manual Actions |
ML23135A187 | 8 May 2023 | Report M-6630-00017A, Revision W08, Fire Protection Evaluation for Unique or Unbounded Fire Barrier Configurations |
ML23135A189 | 8 May 2023 | Report, M-6630-00017A, Revision W08, Structural Steel Fireproofing Data |
WO 23-0006, Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) Analysis | 8 May 2023 | Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) Analysis |
ML23135A200 | 8 May 2023 | Calculation XX-E-013, Rev. 4, CN002, Post-Fire Safe Shutdown (PFSSD) Analysis |
ML23135A165 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant |
ML23135A166 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 2, Site Characteristics |
ML23135A188 | 8 May 2023 | Report, M-6630-00017A, Revision W08, Fire Protection Evaluation for Unique or Unbounded Fire Wrap Configurations, Attachments C to G3C |
ML23135A190 | 8 May 2023 | Report, M-6630-00017A, Revision W08, Fire Protection Evaluation for Penetrant Size Exceeding Typical Detail FB-1 Limitation |
ML23135A178 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 12, Radiation Protection |
ML23135A205 | 8 May 2023 | Quality Program Manual, Wcqpm, Rev 13 |
ML23135A185 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements - Part 2 of 2 |
ML23135A206 | 8 May 2023 | Calculation XX-E-013, Rev 4, CN004, Post-Fire Safe Shutdown (PFSSD) Analysis |
ML23135A195 | 8 May 2023 | Calculation XX-E-013, Rev 4, CN006, Post-Fire Safe Shutdown (PFSSD) Analysis |
ML23135A203 | 8 May 2023 | Calculation XX-E-013, Rev. 4, Post-Fire Safe Shutdown (PFSSD) Analysis |
ML23135A176 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System |
ML23135A175 | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML23135A202 | 8 May 2023 | Calculation XX-E-013, Rev 4, CN007, Post-Fire Safe Shutdown (PFSSD) Analysis |
ML23135A196 | 8 May 2023 | Report, E-1F9900 Rev 10, Redacted, Post-Fire Shutdown Operator Manual Actions |
IR 05000482/2023001 | 19 April 2023 | Integrated Inspection Report 05000482/2023001 |
ML23068A123 | 9 March 2023 | Changes to Technical Specification Bases Revisions 91 and 92 |
ET 23-0004, Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements | 26 January 2023 | Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements |
IR 05000482/2022004 | 17 January 2023 | Integrated Inspection Report 05000482/2022004 |
ML22361A005 | 27 December 2022 | NRR E-mail Capture - Request for Additional Information Wolf Creek Request for Deviation from Fire Protection Program Requirements |
ML23135A201 | 6 December 2022 | EQSD-I, Rev 18, Equipment Qualification Design Basis Document |
ML23135A204 | 9 November 2022 | E-1F9915, Rev. 16, Design Basis Document for Ofn RP-017, Control Room Evacuation |
ML22252A151 | 4 November 2022 | Issuance of Amendment No. 234 Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating |
IR 05000482/2022003 | 25 October 2022 | Integrated Inspection Report 05000482/2022003 |
ML22251A131 | 8 September 2022 | NRR E-mail Capture - Acceptance Review - Wolf Creek Request for Deviation from Fire Protection Program Requirements to Allow Use of Portable Lighting |
ML23135A193 | 1 September 2022 | EQSD-II, Rev 34, Equipment Qualification Summary Document |
ET 22-0010, License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements | 2 August 2022 | License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements |
IR 05000482/2022002 | 25 July 2022 | Integrated Inspection Report 05000482/2022002 |
ML22152A205 | 18 May 2022 | Quality Program Manual, Rev. 13 |