ML03111044913 October 1999Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes
RIS 1999-02, Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes13 October 1999Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes
Information Notice 1999-17, Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses3 June 1999Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses
Information Notice 1999-07, Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems22 March 1999Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems
NRC Generic Letter 1998-0414 July 1998NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i
Information Notice 1997-71, Inappropriate Use of 10 CFR 50.59 Regarding Reduced Seismic Criteria for Temporary Conditions22 September 1997Inappropriate Use of 10 CFR 50.59 Regarding Reduced Seismic Criteria for Temporary Conditions
Information Notice 1997-59, Fire Endurance Test Results of Versawrap Fire Barriers1 August 1997Fire Endurance Test Results of Versawrap Fire Barriers
Information Notice 1997-48, Inadequate or Inappropriate Interim Fire Protection Compensatory Measures9 July 1997Inadequate or Inappropriate Interim Fire Protection Compensatory Measures
Information Notice 1997-07, Problems Identified During Generic Letter 89-10 Closeout Inspections6 March 1997Problems Identified During Generic Letter 89-10 Closeout Inspections
Information Notice 1997-01, Improper Electrical Grounding Results in Simultaneous Fires in the Control Room and the Safe-Shutdown Equipment Room8 January 1997Improper Electrical Grounding Results in Simultaneous Fires in the Control Room and the Safe-Shutdown Equipment Room
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls10 December 1996Modifications to Containment Blowout Panels Without Appropriate Design Controls
Information Notice 1995-52, Fire Endurance Test Results for Electrical Raceway Fire Barrier Systems Constructed from 3M Company Interam Fire Barrier Materials14 November 1995Fire Endurance Test Results for Electrical Raceway Fire Barrier Systems Constructed from 3M Company Interam Fire Barrier Materials
Information Notice 1995-49, Seismic Adequacy of Thermo-Lag Panels27 October 1995Seismic Adequacy of Thermo-Lag Panels
Information Notice 1995-36, Potential Problems with Post-Fire Emergency Lighting29 August 1995Potential Problems with Post-Fire Emergency Lighting
Information Notice 1993-83, Potential Loss of Spent Fuel Pool Cooling After a Loss-of-Coolant Accident or a Loss of Offsite Power24 August 1995Potential Loss of Spent Fuel Pool Cooling After a Loss-of-Coolant Accident or a Loss of Offsite Power
Information Notice 1995-28, Emplacement of Support Pads for Spent Fuel Dry Storage Installations at Reactor Sites5 June 1995Emplacement of Support Pads for Spent Fuel Dry Storage Installations at Reactor Sites
Information Notice 1995-27, NRC Review of Nuclear Energy Institute, Thermo-Lag 330-1 Combustibility Evaluation Methodology Plant Screening Guide.31 May 1995NRC Review of Nuclear Energy Institute, Thermo-Lag 330-1 Combustibility Evaluation Methodology Plant Screening Guide.
Information Notice 1995-17, Reactor Vessel Top Guide and Core Plate Cracking10 March 1995Reactor Vessel Top Guide and Core Plate Cracking
NRC Generic Letter 1995-0126 January 1995NRC Generic Letter 1995-001: NRC Staff Technical Position on Fire Protection for Fuel Cycle Facilities
Information Notice 1994-86, Legal Actions Against Thermal Science, Inc., Manufacturer of Thermo-Lag22 December 1994Legal Actions Against Thermal Science, Inc., Manufacturer of Thermo-Lag
ML0312004432 September 1994Withdrawn - NRC Generic Letter 1994-004: Voluntary Reporting of Additional Occupational Radiation Exposure Data
Information Notice 1991-79, Deficiencies Found in Thermo-Lag Fire Barrier Installation4 August 1994Deficiencies Found in Thermo-Lag Fire Barrier Installation
NRC Generic Letter 1994-0325 July 1994NRC Generic Letter 1994-003: Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reactors
NRC Generic Letter 1994-0211 July 1994NRC Generic Letter 1994-002: Long-Item Solutions and Upgrade of Interim Operating Recommendations for Thermal Hydraulic Instabilities in Boiling Water Reactors
NRC Generic Letter 1994-0131 May 1994NRC Generic Letter 1994-001: Removal of Accelerated Testing and Special Reporting Requirements for Emergency Diesel Generators
Information Notice 1994-24, Inadequate Maintenance of Uninterruptible Power Supplies & Inverters24 March 1994Inadequate Maintenance of Uninterruptible Power Supplies & Inverters
ML20059A45814 October 1993Order Requesting Answers to Two Questions Re State of Nj Request for Immediate Action by NRC or Alternatively, Petition for Leave to Intervene & Request for Hearing. Operations Plans for Marine Transportation Withheld
ML20045B35511 June 1993LER 93-001-00:on 930429,refueling Jib Crane Moved in Vicinity of Spent Fuel Pool Using vendor-supplied Lifting Eye in Violation of NUREG-0612.Caused by Failure to Identify Crane as Heavy Load.Meetings held.W/930611 Ltr
Information Notice 1993-41, One Hour Fire Endurance Test Results for Thermal Ceramics Kaowool, 3M Company FS-195 and 3M Company Interam E-50 Fire Barrier Systems28 May 1993One Hour Fire Endurance Test Results for Thermal Ceramics Kaowool, 3M Company FS-195 and 3M Company Interam E-50 Fire Barrier Systems
Information Notice 1993-40, Fire Endurance Test Results for Thermal Ceramics FP-60 Fire Barrier Material26 May 1993Fire Endurance Test Results for Thermal Ceramics FP-60 Fire Barrier Material
NRC Generic Letter 1992-0817 December 1992NRC Generic Letter 1992-008: Thermo-Lag 330-1 Fire Barriers
Information Notice 1992-82, Results of Thermo-Lag 330-1 Combustibility Testing15 December 1992Results of Thermo-Lag 330-1 Combustibility Testing
NRC Generic Letter 1992-054 September 1992NRC Generic Letter 1992-005: NRC Workshop on the Systematic Assessment of Licensee Performance (SALP) Program
ML20099H57831 July 1992Rev 4 to Shoreham Defueled Sar
Information Notice 1992-28, Inadequate Fire Suppression System Testing8 April 1992Inadequate Fire Suppression System Testing
SNRC-1904, Forwards 10CFR50.59 Rept for Period from Jan-Dec 199130 March 1992Forwards 10CFR50.59 Rept for Period from Jan-Dec 1991
Information Notice 1992-18, Potential for Loss of Remote Shutdown Capability During a Control Room Fire28 February 1992Potential for Loss of Remote Shutdown Capability During a Control Room Fire
SNRC-1899, Requests Amend to License NPF-82 Adding New License Condition to Authorize Decommissioning of Shoreham22 January 1992Requests Amend to License NPF-82 Adding New License Condition to Authorize Decommissioning of Shoreham
Information Notice 1991-79, Deficiencies in the Procedures for Installing Thermo-Lag Fire Barrier Materials6 December 1991Deficiencies in the Procedures for Installing Thermo-Lag Fire Barrier Materials
Information Notice 1991-77, Shift Staffing at Nuclear Power Plants26 November 1991Shift Staffing at Nuclear Power Plants
Information Notice 1991-74, Changes in Pressurizer Safety Valve Setpoints Before Installation25 November 1991Changes in Pressurizer Safety Valve Setpoints Before Installation
Information Notice 1991-73, Loss of Shutdown Cooling During Disassembly of High Pressure Safety Injection System Check Valve21 November 1991Loss of Shutdown Cooling During Disassembly of High Pressure Safety Injection System Check Valve
ML0311405497 November 1991Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability
Information Notice 1991-53, Failure of Remote Shutdown System Instrumentation Because of Incorrectly Installed Components4 September 1991Failure of Remote Shutdown System Instrumentation Because of Incorrectly Installed Components
Information Notice 1991-47, Failure of Thermo-Lag Fire Barrier Material to Pass Fire Endurance Test6 August 1991Failure of Thermo-Lag Fire Barrier Material to Pass Fire Endurance Test
ML20082B4313 July 1991Lilco Opposition to Petitioner Contentions on Confirmatory Order,Physical Security Plan & Emergency Preparedeness License Amends.* Petitioner Contentions Should Be Rejected & License Amends Denied.W/Certificate of Svc
NRC Generic Letter 1991-0629 April 1991NRC Generic Letter 1991-006: Resolution of Generic Issue A-30, Adequacy of Safety-Related DC Power Supplies, Pursuant to 10 CFR 50.54(f)
NRC Generic Letter 1991-042 April 1991NRC Generic Letter 1991-004: Changes in Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel Cycle
ML20066E13315 January 1991Requests limited-scope Exemption from Seismic Qualification Requirements of Criterion 2,App A,10CFR50 to Permit Deletion of 125-volt Dc Batteries 1R42*BA-A1 & 1R42*BA-C1
SNRC-1797, 10CFR 50.59 Annual Rept of Facility Changes,Procedure Changes,Tests & Experiments for Jan-Dec 199031 December 199010CFR 50.59 Annual Rept of Facility Changes,Procedure Changes,Tests & Experiments for Jan-Dec 1990