 Issue dateTitle
NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station14 December 2023Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station
ML23291A4647 December 2023Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants
ML23289A0126 December 2023Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
ML23353A15731 October 2023UFSAR Revision 28 (Redacted Version)
NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .4 August 2023Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .
ML23142A02222 May 2023Regulatory Audit Questions (PRA) TSTF-505 and 50.69 (E-mail Dated 5/22/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186)
ML23082A35017 April 2023Issuance of Amendment No. 192, Revision of Surveillance Requirements Associated with Emergency Diesel Generator Testing
RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-1031 January 2023Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10
NMP1L3484, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors15 December 2022Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors
NMP1L3486, Radiological Emergency Plan Document Revision15 December 2022Radiological Emergency Plan Document Revision
NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b15 December 2022License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
ML22346A00014 December 2022Summary of November 3, 2022, Meeting with Constellation to Discuss Planned License Amendment Requests to Adopt TSTF-505 and 10 CFR 50.69
ML22305A5923 November 2022Pre-Submittal Meeting Presentation Slides - Risk Informed Completion Time (TSTF-505) and Risk Informed Categorization and Treatmentof SSCs (10 CFR 50.69) Proposed License Amendments-Updated
ML22292A0835 October 20225 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.1 Through 3.5
ML22292A0645 October 20225 to Updated Final Safety Analysis Report, Chapter 6, Sections 6.3 Through 6.6
ML22292A1355 October 20225 to Updated Final Safety Analysis Report, Chapter 14, Sections 14.1 Thru 14.4
ML22292A1345 October 20225 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection
ML22292A1255 October 20225 to Updated Final Safety Analysis Report, Chapter 15, Appendices
ML22292A1205 October 20225 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses
ML22292A1195 October 2022Rev. 48 to Technical Requirements Manual
ML22292A1135 October 20225 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML22292A0705 October 20225 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant
ML22292A0955 October 20225 to Updated Final Safety Analysis Report, Chapter 8, Section 8.3 Thru Appendix 8A
ML22292A1045 October 20225 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.4 Thru 7.7
ML22292A1145 October 20225 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A, Degree of Compliance with Branch Technical Position Cmeb 9.5-1, Rev. 2 Dated July 1981
ML22292A1125 October 20225 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.1 Thru 7.3
ML22292A0725 October 20225 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.9A Thru 3.11
ML22292A0755 October 20225 to Updated Final Safety Analysis Report, Chapter 9, Sections 9.4 Thru 9.5
ML22292A0785 October 20225 to Updated Final Safety Analysis Report, Chapter 6, Appendices 6A Through 6C
ML22292A0845 October 20225 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML22292A0765 October 20225 to Updated Final Safety Analysis Report, Chapter 8, Section 8.1 Thru 8.2
ML22292A0795 October 20225 to Updated Final Safety Analysis Report, Chapter 2, Sections 2.1 Through 2.4
ML22292A0625 October 20225 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5, Geology, Seismology, and Geotechnical Engineering
ML22292A0675 October 20225 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A Thru 3E
ML22292A0965 October 20225 to Updated Final Safety Analysis Report, Chapter 9, Table of Contents
ML22292A0945 October 20225 to Updated Final Safety Analysis Report, Chapter 7, Table of Contents
ML22292A1065 October 20225 to Updated Final Safety Analysis Report, Chapter 9, Appendices 9B Thru 9C
ML22292A0975 October 20225 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.6A Through 3.8
NMP2L2799, License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators24 May 2022License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators
ML22090A08629 April 2022Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position
ML22021B6601 February 2022Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1
JAFP-22-0007, Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-1031 January 2022Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10
ML21277A19316 November 2021Enclosure 2, Draft Conforming License Amendments
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position27 September 2021Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position
IR 05000220/202101024 August 2021Triennial Fire Protection Inspection Report 05000220/2021010 and 05000410/2021010
NMP2L2762, License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control26 May 2021License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control
NMP1L3401, (NMP) - Exelon Nuclear Radiological Emergency Plan Document Revisions13 May 2021(NMP) - Exelon Nuclear Radiological Emergency Plan Document Revisions
IR 05000220/20210015 May 2021Integrated Inspection Report 05000220/2021001 and 05000410/2021001
ML21082A22129 April 2021Issuance of Amendment No. 186, Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B
ML21088A26830 March 2021Notification of Conduct of a Fire Protection Team Inspection