Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000245/202300119 September 2023Safstor Inspection Report 05000245/2023001
ML23193A87028 June 20231 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features Systems
ML23193A87628 June 20231 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML23193A89028 June 20236 to Updated Final Safety Analysis Report, Frontmatter
ML23193A87228 June 20231 to Updated Final Safety Analysis Report, Chapter 2, Site and Environment
ML23193A89728 June 20236 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report
ML23193A86928 June 20231 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems
ML23193A89328 June 2023Technical Requirements Manual
ML23193A86728 June 20231 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control
ML23193A87128 June 20231 to Updated Final Safety Analysis Report, Chapter 5, Structures
ML23193A88828 June 20236 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML23193A85728 June 20238 to Defueled Safety Analysis Report, Redacted
ML23193A87428 June 20231 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System
ML23193A88528 June 20236 to Updated Final Safety Analysis Report, Chapter 7, Instruments and Controls
ML23193A90128 June 20236 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML23193A89528 June 20236 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML23193A89628 June 20236 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML23193A87928 June 2023Technical Requirements Manual (Incorporated by Reference) Including Change No. 185
ML23193A87328 June 20231 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML23193A89428 June 20236 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML23193A86528 June 20231 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary
ML23193A90028 June 20236 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program
ML23193A90628 June 20236 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics
ML23193A89128 June 20236 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary System
ML23145A19523 May 2023Proposed Amendment to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report Related to Framatome Gaia Fuel
IR 05000336/20230018 May 2023Integrated Inspection Report 05000336/2023001 and 05000423/2023001
ML23123A2792 May 2023License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits and Exemption Request for Use of M5 Cladding
ML23058A45416 March 2023Issuance of Amendment Nos. 345 and 285 Regarding Adoption of Technical Specification Task Force-359, Increase Flexibility in Mode Restraints
IR 05000245/20220019 January 2023Safstor Inspection Report 05000245/2022001
IR 05000336/20220118 September 2022Triennial Fire Protection Inspection Report 05000336/2022011 and 05000423/2022011
ML22193A06723 June 20220 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features Systems
ML22193A12823 June 20225 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML22193A13423 June 20225 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program
ML22193A06323 June 20220 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary
ML22193A02323 June 20227 to Defueled Safety Analysis Report
ML22193A06823 June 20220 to Updated Final Safety Analysis Report, Chapter 5, Structures
ML22193A07023 June 20220 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML22193A13523 June 20225 to Updated Final Safety Analysis Report
ML22193A13023 June 20225 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML22193A07123 June 2022Technical Requirements Manual
ML22193A06423 June 20220 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control
ML22193A12323 June 20225 to Updated Final Safety Analysis Report, Chapter 7, Instruments and Controls
ML22193A07323 June 20220 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System
ML22193A12623 June 20225 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML22193A06923 June 20220 to Updated Final Safety Analysis Report, Chapter 2, Site and Environment
ML22193A06623 June 20220 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems