IR 05000341/2023010 | 8 December 2023 | Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 |
ML23310A149 | 8 December 2023 | Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements |
NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan | 4 December 2023 | Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan |
IR 05000341/2023003 | 7 November 2023 | Integrated Inspection Report 05000341/2023003 and 07200071/2023001 |
ML23297A051 | 30 October 2023 | Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) |
NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 | 12 October 2023 | Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 |
ML23283A023 | 9 October 2023 | Inservice Testing Program Fourth Ten-Year Interval |
ML23283A026 | 9 October 2023 | Inservice Testing Program for Pumps and Valves - Part 4: IST Valve Testing Program (Revision 3) |
ML23283A028 | 9 October 2023 | Inservice Testing Program for Pumps and Valves - Part 6: IST Check Valve Condition Monitoring Plans Rev. 3 |
ML23283A030 | 9 October 2023 | Inservice Testing Program for Pumps and Valves - Part 8: IST Program Cold Shutdown Justifications Rev. 4 |
ML23283A032 | 9 October 2023 | Inservice Testing Program for Pumps and Valves - Part 10: IST Program Technical Positions Revision 2 |
ML23283A034 | 9 October 2023 | Inservice Testing Program for Pumps and Valves - Part 11: IST Program Valve Basis Revision 1 |
NRC-23-0063, Inservice Testing Program for Pumps and Valves - Part 12: IST Program Pump Basis Revision 1 | 9 October 2023 | Inservice Testing Program for Pumps and Valves - Part 12: IST Program Pump Basis Revision 1 |
NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating | 28 September 2023 | Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating |
ML23243A885 | 18 September 2023 | Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) |
NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval | 31 August 2023 | Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval |
ML23229A012 | 17 August 2023 | Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances) |
NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | 10 August 2023 | Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) |
IR 05000341/2023002 | 4 August 2023 | Integrated Inspection Report 05000341/2023002 |
NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | 24 July 2023 | Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) |
ML23122A233 | 26 June 2023 | Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements |
IR 05000341/2022004 | 22 June 2023 | Non-Concurrence on Fermi Power Plant, Unit 2 - Integrated Inspection Report 05000341/2022004 |
IR 05000341/2022010 | 21 June 2023 | Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010 |
NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance | 13 June 2023 | License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance |
NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | 6 June 2023 | Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) |
NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval | 5 June 2023 | Snubber Program for the Fourth 10-Year Testing Interval |
NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 | 5 May 2023 | License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 |
IR 05000341/2023011 | 6 April 2023 | Triennial Fire Protection Inspection Report 05000341/2023011 |
ML22362A071 | 28 December 2022 | Notification of NRC Fire Protection Team Inspection Request for Information Inspection Report Numbers 05000341/2023010 |
NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements | 16 December 2022 | License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements |
ML22325A143 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations |
ML22325A125 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power |
ML22325A131 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor |
ML22325A133 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System |
ML22325A132 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis |
ML22325A142 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics |
ML22325A139 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems |
ML22325A135 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML22325A134 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML22325A138 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML22313A103 | 9 November 2022 | Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010 |
IR 05000341/2022002 | 4 August 2022 | Integrated Inspection Report 05000341/2022002 |
IR 05000341/2022001 | 9 May 2022 | Integrated Inspection Report 05000341/2022001 |
ML21335A280 | 7 April 2022 | Issuance of Amendment No. 222 Regarding Revision of Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Several Editorial Changes |
IR 05000341/2021003 | 28 October 2021 | Integrated Inspection Report 05000341/2021003 |
IR 05000341/2021002 | 6 August 2021 | Integrated Inspection Report 05000341/2021002 |
ML21328A164 | 16 June 2021 | Proposed Scenarios |
ML21327A321 | 16 June 2021 | Administered Scenarios |