 Issue dateTitle
IR 05000341/20230108 December 2023Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010
ML23310A1498 December 2023Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements
NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan4 December 2023Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan
IR 05000341/20230037 November 2023Integrated Inspection Report 05000341/2023003 and 07200071/2023001
ML23297A05130 October 2023Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances)
NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.1212 October 2023Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12
ML23283A0239 October 2023Inservice Testing Program Fourth Ten-Year Interval
ML23283A0269 October 2023Inservice Testing Program for Pumps and Valves - Part 4: IST Valve Testing Program (Revision 3)
ML23283A0289 October 2023Inservice Testing Program for Pumps and Valves - Part 6: IST Check Valve Condition Monitoring Plans Rev. 3
ML23283A0309 October 2023Inservice Testing Program for Pumps and Valves - Part 8: IST Program Cold Shutdown Justifications Rev. 4
ML23283A0329 October 2023Inservice Testing Program for Pumps and Valves - Part 10: IST Program Technical Positions Revision 2
ML23283A0349 October 2023Inservice Testing Program for Pumps and Valves - Part 11: IST Program Valve Basis Revision 1
NRC-23-0063, Inservice Testing Program for Pumps and Valves - Part 12: IST Program Pump Basis Revision 19 October 2023Inservice Testing Program for Pumps and Valves - Part 12: IST Program Pump Basis Revision 1
NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating28 September 2023Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating
ML23243A88518 September 2023Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances)
NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval31 August 2023Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval
ML23229A01217 August 2023Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances)
NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)10 August 2023Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)
IR 05000341/20230024 August 2023Integrated Inspection Report 05000341/2023002
NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)24 July 2023Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)
ML23122A23326 June 2023Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements
IR 05000341/202200422 June 2023Non-Concurrence on Fermi Power Plant, Unit 2 - Integrated Inspection Report 05000341/2022004
IR 05000341/202201021 June 2023Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010
NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance13 June 2023License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance
NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)6 June 2023Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)
NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval5 June 2023Snubber Program for the Fourth 10-Year Testing Interval
NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.125 May 2023License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12
IR 05000341/20230116 April 2023Triennial Fire Protection Inspection Report 05000341/2023011
ML22362A07128 December 2022Notification of NRC Fire Protection Team Inspection Request for Information Inspection Report Numbers 05000341/2023010
NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements16 December 2022License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements
ML22325A14317 November 20224 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations
ML22325A12517 November 20224 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML22325A13117 November 20224 to Updated Final Safety Analysis Report, Chapter 4, Reactor
ML22325A13317 November 20224 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML22325A13217 November 20224 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis
ML22325A14217 November 20224 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics
ML22325A13917 November 20224 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML22325A13517 November 20224 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
ML22325A13417 November 20224 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML22325A13817 November 20224 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML22313A1039 November 2022Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010
IR 05000341/20220024 August 2022Integrated Inspection Report 05000341/2022002
IR 05000341/20220019 May 2022Integrated Inspection Report 05000341/2022001
ML21335A2807 April 2022Issuance of Amendment No. 222 Regarding Revision of Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Several Editorial Changes
IR 05000341/202100328 October 2021Integrated Inspection Report 05000341/2021003
IR 05000341/20210026 August 2021Integrated Inspection Report 05000341/2021002
ML21328A16416 June 2021Proposed Scenarios
ML21327A32116 June 2021Administered Scenarios