Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23310A051 | 6 November 2023 | EIP-ZZ.OO1O1, Addendum 2, Revision 22, Emergency Action Level Technical Bases Document |
ML23278A095 | 5 October 2023 | EIP-ZZ-00101 Addendum 2 - Emergency Action Level Technical Bases Document Administrative Correction Revision 021 |
IR 05000483/2023002 | 10 July 2023 | Integrated Inspection Report 05000483/2023002 |
ML23059A210 | 1 May 2023 | Disputed Response EA-22-121 Callaway |
ML23102A192 | 31 March 2023 | Radiological Emergency Response Plan, Revision 55 |
ML23088A243 | 31 March 2023 | Radiological Emergency Response Plan, Revision 055, March 2023 |
ML23088A123 | 29 March 2023 | Attachment 3: Marked-Up Technical Specification, Bases Pages |
ML23088A254 | 23 March 2023 | EIP-ZZ-00101, Addendum 2, Revision 020, Emergency Action Level Technical Bases Document |
ML23062A651 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 16, Technical Requirements |
ML23062A650 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 18, Clarification of TMI Action Plan Requirements |
ML23062A645 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML23062A644 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems |
ML23062A642 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML23062A641 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 12, Radiation Protection |
ML23062A640 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant |
ML23062A637 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Change Notice Log |
ML23062A635 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 15, Accident Analysis |
ML23062A633 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML23062A623 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Index to NRC Questions and Responses |
ML23062A622 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management |
ML23062A619 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, General Table of Contents |
ML23062A618 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System |
ML23062A609 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML23067A108 | 29 December 2022 | Site Addendum, Chapter 8, Electric Power |
ML23067A121 | 29 December 2022 | Site Addendum, Chapter 2, Site Characteristics |
ML23067A132 | 29 December 2022 | Site Addendum, Chapter 9, Auxiliary Systems |
ML23067A133 | 29 December 2022 | Site Addendum, Chapter 3, Design of Structures, Components, Equipment, and Systems |
ML23067A174 | 29 December 2022 | Rev. 18 to Technical Specifications, Bases Change, Chapter 3.7, Plant Systems |
ML23067A175 | 29 December 2022 | Rev. 18 to Technical Specification, Bases Change, Chapter 3.3, Instrumentation |
ML23067A182 | 29 December 2022 | Rev. 18 to Technical Specification, Bases Change, Chapter 3.8, Electrical Power Systems |
ML23062A606 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 8, Electric Power |
ML22301A007 | 2 December 2022 | Issuance of Amendment No. 229 to Revise Technical Specifications to Adopt TSTF-505, Revision 2, and TSTF-439, Revision 2 |
ML22335A509 | 1 December 2022 | Description and Assessment of the Proposed Change |
ML22327A210 | 16 November 2022 | Attachment 3 - Updated Pages Which Constitute Oqam Revision 36 |
ML22318A189 | 14 November 2022 | Enclosure 1 - Ameren Missouri'S Response to Green NCV 05000483/2022010-03 |
ML22285A122 | 12 October 2022 | Attachment 5 to Enclosure 1: ANP-3947NP, Callaway Unit 1 License Amendment Request Inputs for Use of Framatome Fuel, Revision 3, Dated October 2022 |
IR 05000483/2022010 | 12 October 2022 | Biennial Problem Identification and Resolution Inspection Report 05000483-2022010 - Draft |
IR 05000483/2022011 | 2 August 2022 | Triennial Fire Protection Inspection Report 05000483 2022011 |
IR 05000483/2022002 | 27 July 2022 | Integrated Inspection Report 05000483/2022002 |
ML22181B140 | 30 June 2022 | Enclosure 1 - Replacement for Enclosure 1, List of Revised Required Actions to Corresponding PRA Functions, of ULNRC-06688 |
ML22181B141 | 30 June 2022 | Enclosure 4 - Replacement for Enclosure 4, Information Supporting Justification of Excluding Sources of Risk Not Addressed by the PRA Models, of ULNRC-06688 |
ML22181B134 | 30 June 2022 | Attachment 4 - Replacement for Attachment 4, Proposed Changes to Technical Specification Bases Changes (Mark-Up) Pages (for Information), of ULNRC-06688 |
ML22181B139 | 30 June 2022 | Attachment 9 - Responses to NRC Audit Questions |
ML22153A181 | 2 June 2022 | Attachment 5 - Non-Proprietary Version of Licensing Summary Report |
ML22082A201 | 28 March 2022 | Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000483/2022011) and Request for Information |
ML22027A807 | 27 January 2022 | Enclosure 2: Callaway, Unit 1, License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-02 |