Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23310A0516 November 2023EIP-ZZ.OO1O1, Addendum 2, Revision 22, Emergency Action Level Technical Bases Document
ML23278A0955 October 2023EIP-ZZ-00101 Addendum 2 - Emergency Action Level Technical Bases Document Administrative Correction Revision 021
IR 05000483/202300210 July 2023Integrated Inspection Report 05000483/2023002
ML23059A2101 May 2023Disputed Response EA-22-121 Callaway
ML23102A19231 March 2023Radiological Emergency Response Plan, Revision 55
ML23088A24331 March 2023Radiological Emergency Response Plan, Revision 055, March 2023
ML23088A12329 March 2023Attachment 3: Marked-Up Technical Specification, Bases Pages
ML23088A25423 March 2023EIP-ZZ-00101, Addendum 2, Revision 020, Emergency Action Level Technical Bases Document
ML23062A65129 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 16, Technical Requirements
ML23062A65029 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 18, Clarification of TMI Action Plan Requirements
ML23062A64529 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features
ML23062A64429 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML23062A64229 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML23062A64129 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 12, Radiation Protection
ML23062A64029 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant
ML23062A63729 December 2022Revision OL-26 to Final Safety Analysis Report, Change Notice Log
ML23062A63529 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 15, Accident Analysis
ML23062A63329 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML23062A62329 December 2022Revision OL-26 to Final Safety Analysis Report, Index to NRC Questions and Responses
ML23062A62229 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management
ML23062A61929 December 2022Revision OL-26 to Final Safety Analysis Report, General Table of Contents
ML23062A61829 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML23062A60929 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
ML23067A10829 December 2022Site Addendum, Chapter 8, Electric Power
ML23067A12129 December 2022Site Addendum, Chapter 2, Site Characteristics
ML23067A13229 December 2022Site Addendum, Chapter 9, Auxiliary Systems
ML23067A13329 December 2022Site Addendum, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML23067A17429 December 2022Rev. 18 to Technical Specifications, Bases Change, Chapter 3.7, Plant Systems
ML23067A17529 December 2022Rev. 18 to Technical Specification, Bases Change, Chapter 3.3, Instrumentation
ML23067A18229 December 2022Rev. 18 to Technical Specification, Bases Change, Chapter 3.8, Electrical Power Systems
ML23062A60629 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 8, Electric Power
ML22301A0072 December 2022Issuance of Amendment No. 229 to Revise Technical Specifications to Adopt TSTF-505, Revision 2, and TSTF-439, Revision 2
ML22335A5091 December 2022Description and Assessment of the Proposed Change
ML22327A21016 November 2022Attachment 3 - Updated Pages Which Constitute Oqam Revision 36
ML22318A18914 November 2022Enclosure 1 - Ameren Missouri'S Response to Green NCV 05000483/2022010-03
ML22285A12212 October 2022Attachment 5 to Enclosure 1: ANP-3947NP, Callaway Unit 1 License Amendment Request Inputs for Use of Framatome Fuel, Revision 3, Dated October 2022
IR 05000483/202201012 October 2022Biennial Problem Identification and Resolution Inspection Report 05000483-2022010 - Draft
IR 05000483/20220112 August 2022Triennial Fire Protection Inspection Report 05000483 2022011
IR 05000483/202200227 July 2022Integrated Inspection Report 05000483/2022002
ML22181B14030 June 2022Enclosure 1 - Replacement for Enclosure 1, List of Revised Required Actions to Corresponding PRA Functions, of ULNRC-06688
ML22181B14130 June 2022Enclosure 4 - Replacement for Enclosure 4, Information Supporting Justification of Excluding Sources of Risk Not Addressed by the PRA Models, of ULNRC-06688
ML22181B13430 June 2022Attachment 4 - Replacement for Attachment 4, Proposed Changes to Technical Specification Bases Changes (Mark-Up) Pages (for Information), of ULNRC-06688
ML22181B13930 June 2022Attachment 9 - Responses to NRC Audit Questions
ML22153A1812 June 2022Attachment 5 - Non-Proprietary Version of Licensing Summary Report
ML22082A20128 March 2022Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000483/2022011) and Request for Information
ML22027A80727 January 2022Enclosure 2: Callaway, Unit 1, License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-02