Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23208A095 | 28 August 2023 | Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach |
L-2022-121, Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02 | 29 July 2022 | Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02 |
ML22140A127 | 25 May 2022 | Subsequent License Renewal Application Safety Evaluation Revision 1 Public |
ML22151A068 | 23 May 2022 | Quality Assurance Program Description for 10 CFR Part 52 Licenses, FPL-2, Revision 11 |
ML22054A108 | 23 February 2022 | Subsequent License Renewal Application Safety Evaluation Public |
L-2021-115, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 26 Annual Submittal and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 10 | 24 May 2021 | NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 26 Annual Submittal and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 10 |
ML21102A339 | 2 April 2021 | Update to Final Safety Analysis Report, Chapter 4, Design Basis |
ML21102A340 | 2 April 2021 | Update to Final Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML21102A351 | 2 April 2021 | Update to Final Safety Analysis Report, Appendix D, Diesel Generator Project |
ML21102A356 | 2 April 2021 | Update to Final Safety Analysis Report, Appendix a, Station Blackout (SBO) |
ML21102A358 | 2 April 2021 | Update to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion |
NRC-2021-0009, Update to Final Safety Analysis Report, Chapter 2, Site and Environment | 2 April 2021 | Update to Final Safety Analysis Report, Chapter 2, Site and Environment |
ML20114E142 | 12 May 2020 | Final ASP Analysis - Point Beach 1 and 2 (LER 266-02-003-01) |
ML20114E135 | 12 May 2020 | Final ASP Analysis - Point Beach 1 and 2 (LER 266-01-005) |
NRC 2019-0026, Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure | 29 August 2019 | Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure |
ML18345A110 | 26 March 2019 | Redacted Version, Issuance of Amendment Nos. 263 and 266 for Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances |
NRC 2018-0030, Construction Truss License Amendment Request 278 Draft Updated Final Safety Analysis Report (UFSAR) Revision | 29 May 2018 | Construction Truss License Amendment Request 278 Draft Updated Final Safety Analysis Report (UFSAR) Revision |
NRC 2018-0024, Transmittal of Fire Protection Program Design Document, Revision 2 | 2 May 2018 | Transmittal of Fire Protection Program Design Document, Revision 2 |
NRC 2018-0014, NextEra Energy Point Beach, LLC, Construction Truss License Amendment Request 278, Response to Request for Additional Information | 12 April 2018 | NextEra Energy Point Beach, LLC, Construction Truss License Amendment Request 278, Response to Request for Additional Information |
NRC 2017-0045, Updated Final Response to NRC Generic Letter 2004-02 | 29 December 2017 | Updated Final Response to NRC Generic Letter 2004-02 |
ML17363A145 | 21 December 2017 | Response to Request for Additional Information Regarding License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor |
ML17310B531 | 16 November 2017 | Staff Review of Mitigating Strategies Assessment Report of the Impact of the Re-Evaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter |
ML17229B187 | 21 August 2017 | Staff Review of High Frequency Confirmation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1 |
IR 05000266/2017007 | 9 August 2017 | NRC Design Bases Assurance Inspection (Teams): Inspection Report 05000266/2017007; 05000301/2017007 |
NRC 2017-0037, High Frequency Seismic Evaluation Confirmation Report | 2 August 2017 | High Frequency Seismic Evaluation Confirmation Report |
NRC 2017-0028, License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. | 23 June 2017 | License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. |
NRC 2017-0014, Transmittal of Fire Protection Program Design Document, Revision 1 | 9 May 2017 | Transmittal of Fire Protection Program Design Document, Revision 1 |
NRC 2017-0017, License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances | 31 March 2017 | License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances |
ML16349A572 | 6 January 2017 | Staff Review of Spent Fuel Pool Evaluation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1(CAC Nos. MF3959 and MF3960) |
ML16313A159 | 22 November 2016 | FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: Decembe |
NRC-2016-0240, FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: De | 22 November 2016 | FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: Decembe |
ML16241A000 | 23 September 2016 | Mitigating Strategies and Spent Fuel Pool Instrumentation Safety Evaluation |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 10 - Steam and Power Conversion | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 10 - Steam and Power Conversion |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 5 - Containment System Structure | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 5 - Containment System Structure |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 4 - Reactor Coolant System - Design Basis | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 4 - Reactor Coolant System - Design Basis |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 6 - Engineered Safety Features | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 6 - Engineered Safety Features |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix a | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix a |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix D | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix D |
ML16251A171 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Appendix D |
ML16251A161 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 10 - Steam and Power Conversion |
ML16251A154 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 4 - Reactor Coolant System - Design Basis |
ML16251A155 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 6 - Engineered Safety Features |
ML16251A168 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Appendix a |
ML16251A148 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 5 - Containment System Structure |
NRC 2016-0039, Fire Protection Evaluation Report, Revisions 16 and 17 | 24 August 2016 | Fire Protection Evaluation Report, Revisions 16 and 17 |
NRC 2016-0030, License Amendment Request for H: Alternate Repair Criteria for Steam Generator Tube Sheet Expansion Region | 29 July 2016 | License Amendment Request for H: Alternate Repair Criteria for Steam Generator Tube Sheet Expansion Region |
NRC 2015-0072, Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan | 16 December 2015 | Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan |
ML15208A027 | 27 August 2015 | Report for the Onsite Audit Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 |
NRC 2015-0040, Steam Generator Nozzle to Safe-End Dissimilar Metal (DM) Weld Inspection | 13 August 2015 | Steam Generator Nozzle to Safe-End Dissimilar Metal (DM) Weld Inspection |
ML15211A593 | 3 August 2015 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(F), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near Term Task Force |