Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23208A09528 August 2023Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach
L-2022-121, Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-0229 July 2022Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02
ML22140A12725 May 2022Subsequent License Renewal Application Safety Evaluation Revision 1 Public
ML22151A06823 May 2022Quality Assurance Program Description for 10 CFR Part 52 Licenses, FPL-2, Revision 11
ML22054A10823 February 2022Subsequent License Renewal Application Safety Evaluation Public
L-2021-115, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 26 Annual Submittal and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 1024 May 2021NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 26 Annual Submittal and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 10
ML21102A3392 April 2021Update to Final Safety Analysis Report, Chapter 4, Design Basis
ML21102A3402 April 2021Update to Final Safety Analysis Report, Chapter 6, Engineered Safety Features
ML21102A3512 April 2021Update to Final Safety Analysis Report, Appendix D, Diesel Generator Project
ML21102A3562 April 2021Update to Final Safety Analysis Report, Appendix a, Station Blackout (SBO)
ML21102A3582 April 2021Update to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion
NRC-2021-0009, Update to Final Safety Analysis Report, Chapter 2, Site and Environment2 April 2021Update to Final Safety Analysis Report, Chapter 2, Site and Environment
ML20114E14212 May 2020Final ASP Analysis - Point Beach 1 and 2 (LER 266-02-003-01)
ML20114E13512 May 2020Final ASP Analysis - Point Beach 1 and 2 (LER 266-01-005)
NRC 2019-0026, Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure29 August 2019Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure
ML18345A11026 March 2019Redacted Version, Issuance of Amendment Nos. 263 and 266 for Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances
NRC 2018-0030, Construction Truss License Amendment Request 278 Draft Updated Final Safety Analysis Report (UFSAR) Revision29 May 2018Construction Truss License Amendment Request 278 Draft Updated Final Safety Analysis Report (UFSAR) Revision
NRC 2018-0024, Transmittal of Fire Protection Program Design Document, Revision 22 May 2018Transmittal of Fire Protection Program Design Document, Revision 2
NRC 2018-0014, NextEra Energy Point Beach, LLC, Construction Truss License Amendment Request 278, Response to Request for Additional Information12 April 2018NextEra Energy Point Beach, LLC, Construction Truss License Amendment Request 278, Response to Request for Additional Information
NRC 2017-0045, Updated Final Response to NRC Generic Letter 2004-0229 December 2017Updated Final Response to NRC Generic Letter 2004-02
ML17363A14521 December 2017Response to Request for Additional Information Regarding License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor
ML17310B53116 November 2017Staff Review of Mitigating Strategies Assessment Report of the Impact of the Re-Evaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter
ML17229B18721 August 2017Staff Review of High Frequency Confirmation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1
IR 05000266/20170079 August 2017NRC Design Bases Assurance Inspection (Teams): Inspection Report 05000266/2017007; 05000301/2017007
NRC 2017-0037, High Frequency Seismic Evaluation Confirmation Report2 August 2017High Frequency Seismic Evaluation Confirmation Report
NRC 2017-0028, License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.23 June 2017License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.
NRC 2017-0014, Transmittal of Fire Protection Program Design Document, Revision 19 May 2017Transmittal of Fire Protection Program Design Document, Revision 1
NRC 2017-0017, License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances31 March 2017License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances
ML16349A5726 January 2017Staff Review of Spent Fuel Pool Evaluation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1(CAC Nos. MF3959 and MF3960)
ML16313A15922 November 2016FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: Decembe
NRC-2016-0240, FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: De22 November 2016FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: Decembe
ML16241A00023 September 2016Mitigating Strategies and Spent Fuel Pool Instrumentation Safety Evaluation
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 10 - Steam and Power Conversion1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 10 - Steam and Power Conversion
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 5 - Containment System Structure1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 5 - Containment System Structure
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 4 - Reactor Coolant System - Design Basis1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 4 - Reactor Coolant System - Design Basis
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 6 - Engineered Safety Features1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 6 - Engineered Safety Features
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix a1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix a
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix D1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix D
ML16251A1711 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Appendix D
ML16251A1611 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 10 - Steam and Power Conversion
ML16251A1541 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 4 - Reactor Coolant System - Design Basis
ML16251A1551 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 6 - Engineered Safety Features
ML16251A1681 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Appendix a
ML16251A1481 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 5 - Containment System Structure
NRC 2016-0039, Fire Protection Evaluation Report, Revisions 16 and 1724 August 2016Fire Protection Evaluation Report, Revisions 16 and 17
NRC 2016-0030, License Amendment Request for H: Alternate Repair Criteria for Steam Generator Tube Sheet Expansion Region29 July 2016License Amendment Request for H: Alternate Repair Criteria for Steam Generator Tube Sheet Expansion Region
NRC 2015-0072, Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan16 December 2015Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan
ML15208A02727 August 2015Report for the Onsite Audit Regarding Implementation of Mitigating Strategies Related to Order EA-12-049
NRC 2015-0040, Steam Generator Nozzle to Safe-End Dissimilar Metal (DM) Weld Inspection13 August 2015Steam Generator Nozzle to Safe-End Dissimilar Metal (DM) Weld Inspection
ML15211A5933 August 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(F), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near Term Task Force