Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23110A197 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Appendix H, Conformance to AEC (NRC) Criteria |
ML23173A057 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria - Redacted |
ML23062A419 | 3 March 2023 | 8 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria. (Redacted) |
RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 | 31 January 2023 | Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 |
JAFP-22-0007, Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 | 31 January 2022 | Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 |
ML21109A046 | 8 April 2021 | 8 to Updated Final Safety Analysis Report, Appendix H, Conformance to AEC (NRC) Criteria |
ML20337A301 | 2 December 2020 | Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. |
ML19280D820 | 31 October 2019 | Safety Evaluation Report Related to the Subsequent License Renewal Application of Peach Bottom Atomic Power Station, Units 2 and 3 |
ML19210D453 | 31 July 2019 | NUREG-1437, Supplement 10, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 10, Second Renewal for Peach Bottom, Units 2 and 3 |
ML19053A469 | 10 June 2019 | Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluation Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic |
ML19114A172 | 8 April 2019 | Revision 27 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria |
ML19114A191 | 8 April 2019 | Revision 27 to Updated Final Safety Analysis Report, Appendix H, Conformance to AEC (NRC) Criteria |
JAFP-19-0016, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 | 8 February 2019 | Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 |
ML18163A140 | 6 June 2018 | ISFSI - Attachment 1, 10 CFR 50.54(q)(5) Procedure Changes Summary Analysis and Attachment 2, EP-AA-1007, Addendum 3, Revision 6, Emergency Action Levels for Peach Bottom Atomic Power Station |
ML18093B511 | 24 April 2018 | Response to Request for Extension of Seismic Probabilistic Risk Assessment Submittal |
RA-18-008, Summary of Changes to Quality Assurance Topical Report, NO-AA-10 | 8 February 2018 | Summary of Changes to Quality Assurance Topical Report, NO-AA-10 |
RS-17-149, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The. | 15 December 2017 | Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The. |
ML17271A178 | 21 September 2017 | Radiological Emergency Plan Annex and Addendum Revisions |
RS-17-096, Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) | 28 August 2017 | Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) |
ML17130A279 | 6 April 2017 | Revision 26 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria |
ML17130A301 | 6 April 2017 | Revision 26 to Updated Final Safety Analysis Report, Appendix H, Conformance to AEC (NRC) Criteria |
RS-17-021, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events | 28 February 2017 | Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events |
RS-16-149, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049) | 26 August 2016 | Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049) |
ML16229A255 | 18 August 2016 | Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Publication Date: August 30, 2016 |
NRC-2016-0180, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Publication Date: August 30, 2016 | 18 August 2016 | Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Publication Date: August 30, 2016 |
RS-16-026, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 26 February 2016 | Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
ML16049A259 | 11 February 2016 | EP-AA-1007, Addendum 3, Revision 3, Emergency Action Levels for Pbaps. |
RA-16-007, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, Revision 88, 89 and 90 | 8 February 2016 | Summary of Changes to Quality Assurance Topical Report, NO-AA-10, Revision 88, 89 and 90 |
ML16028A172 | 14 January 2016 | EP-AA-1007, Addendum 3, Revision 2, Emergency Action Levels for Pbaps. |
RS-15-303, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.. | 15 December 2015 | Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.. |
RS-15-214, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 28 August 2015 | Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
ML15173A385 | 30 June 2015 | Staff Review of Interim Evaluation Associated with Reevaluated Seismic Hazard Implementation Near-Term Task Force Recommendation 2.1 |
ML15173A360 | 19 June 2015 | NRR E-mail Capture - Peach Bottom Units 2 and 3 - Technical Review Checklist Related to Interim ESEP Supporting Implementation of NTTF R2.1, Seismic (TAC Nos. MF5259 and MF5260) |
ML15051A262 | 20 April 2015 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Related to Recommendation 2.1 |
ML15072A389 | 2 March 2015 | Attachment 9 - EP-AA-1007, Revised Radiological Emergency Plan Annex Information for Peach Bottom Atomic Power Station |
ML15071A119 | 2 March 2015 | Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors |
RA-15-019, Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors | 2 March 2015 | Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors |
RA-15-019, Attachment 9 - EP-AA-1007, Revised Radiological Emergency Plan Annex Information for Peach Bottom Atomic Power Station | 2 March 2015 | Attachment 9 - EP-AA-1007, Revised Radiological Emergency Plan Annex Information for Peach Bottom Atomic Power Station |
RS-15-023, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049) | 27 February 2015 | Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049) |
RS-15-032, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 27 February 2015 | Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) |
ML15026A469 | 12 February 2015 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to EA-13-109 (Severe Accident Capable Hardened Vents) |
RS-14-250, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 31 October 2014 | Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
RS-14-202, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 28 August 2014 | Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) |
RS-14-212, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 28 August 2014 | Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
ML14133A046 | 25 August 2014 | Issuance of Amendments Extended Power Uprate |
RS-14-062, Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) | 30 June 2014 | Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
RS-14-115, Attachment 9: Discussion of Revision to the Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station, Page PBAPS 3-77 Through End | 30 May 2014 | Attachment 9: Discussion of Revision to the Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station, Page PBAPS 3-77 Through End |
RA-14-032, Attachment 9: Discussion of Revision to the Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station, Page PBAPS 3-77 Through End | 30 May 2014 | Attachment 9: Discussion of Revision to the Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station, Page PBAPS 3-77 Through End |
IR 05000277/2014007 | 19 May 2014 | IR 05000277-14-007 and 05000278-14-007; 03-03-2014 to 04-04-2014; Exelon Generation Company, LLC; Peach Bottom Atomic Power Station, Units 2 and 3; Component Design Bases Inspection |
ML14111A147 | 9 May 2014 | Seismic Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights |