Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23110A19710 April 20239 to Updated Final Safety Analysis Report, Appendix H, Conformance to AEC (NRC) Criteria
ML23173A05710 April 20239 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria - Redacted
ML23062A4193 March 20238 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria. (Redacted)
RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-1031 January 2023Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10
JAFP-22-0007, Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-1031 January 2022Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10
ML21109A0468 April 20218 to Updated Final Safety Analysis Report, Appendix H, Conformance to AEC (NRC) Criteria
ML20337A3012 December 2020Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.
ML19280D82031 October 2019Safety Evaluation Report Related to the Subsequent License Renewal Application of Peach Bottom Atomic Power Station, Units 2 and 3
ML19210D45331 July 2019NUREG-1437, Supplement 10, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 10, Second Renewal for Peach Bottom, Units 2 and 3
ML19053A46910 June 2019Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluation Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic
ML19114A1728 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria
ML19114A1918 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix H, Conformance to AEC (NRC) Criteria
JAFP-19-0016, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-108 February 2019Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10
ML18163A1406 June 2018ISFSI - Attachment 1, 10 CFR 50.54(q)(5) Procedure Changes Summary Analysis and Attachment 2, EP-AA-1007, Addendum 3, Revision 6, Emergency Action Levels for Peach Bottom Atomic Power Station
ML18093B51124 April 2018Response to Request for Extension of Seismic Probabilistic Risk Assessment Submittal
RA-18-008, Summary of Changes to Quality Assurance Topical Report, NO-AA-108 February 2018Summary of Changes to Quality Assurance Topical Report, NO-AA-10
RS-17-149, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.15 December 2017Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.
ML17271A17821 September 2017Radiological Emergency Plan Annex and Addendum Revisions
RS-17-096, Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)28 August 2017Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)
ML17130A2796 April 2017Revision 26 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria
ML17130A3016 April 2017Revision 26 to Updated Final Safety Analysis Report, Appendix H, Conformance to AEC (NRC) Criteria
RS-17-021, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events28 February 2017Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events
RS-16-149, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049)26 August 2016Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049)
ML16229A25518 August 2016Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Publication Date: August 30, 2016
NRC-2016-0180, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Publication Date: August 30, 201618 August 2016Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Publication Date: August 30, 2016
RS-16-026, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)26 February 2016Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML16049A25911 February 2016EP-AA-1007, Addendum 3, Revision 3, Emergency Action Levels for Pbaps.
RA-16-007, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, Revision 88, 89 and 908 February 2016Summary of Changes to Quality Assurance Topical Report, NO-AA-10, Revision 88, 89 and 90
ML16028A17214 January 2016EP-AA-1007, Addendum 3, Revision 2, Emergency Action Levels for Pbaps.
RS-15-303, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions..15 December 2015Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions..
RS-15-214, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 August 2015Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML15173A38530 June 2015Staff Review of Interim Evaluation Associated with Reevaluated Seismic Hazard Implementation Near-Term Task Force Recommendation 2.1
ML15173A36019 June 2015NRR E-mail Capture - Peach Bottom Units 2 and 3 - Technical Review Checklist Related to Interim ESEP Supporting Implementation of NTTF R2.1, Seismic (TAC Nos. MF5259 and MF5260)
ML15051A26220 April 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Related to Recommendation 2.1
ML15072A3892 March 2015Attachment 9 - EP-AA-1007, Revised Radiological Emergency Plan Annex Information for Peach Bottom Atomic Power Station
ML15071A1192 March 2015Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors
RA-15-019, Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2 March 2015Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors
RA-15-019, Attachment 9 - EP-AA-1007, Revised Radiological Emergency Plan Annex Information for Peach Bottom Atomic Power Station2 March 2015Attachment 9 - EP-AA-1007, Revised Radiological Emergency Plan Annex Information for Peach Bottom Atomic Power Station
RS-15-023, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049)27 February 2015Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049)
RS-15-032, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)27 February 2015Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
ML15026A46912 February 2015Interim Staff Evaluation Relating to Overall Integrated Plan in Response to EA-13-109 (Severe Accident Capable Hardened Vents)
RS-14-250, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident31 October 2014Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
RS-14-202, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 August 2014Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
RS-14-212, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 August 2014Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML14133A04625 August 2014Issuance of Amendments Extended Power Uprate
RS-14-062, Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)30 June 2014Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
RS-14-115, Attachment 9: Discussion of Revision to the Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station, Page PBAPS 3-77 Through End30 May 2014Attachment 9: Discussion of Revision to the Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station, Page PBAPS 3-77 Through End
RA-14-032, Attachment 9: Discussion of Revision to the Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station, Page PBAPS 3-77 Through End30 May 2014Attachment 9: Discussion of Revision to the Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station, Page PBAPS 3-77 Through End
IR 05000277/201400719 May 2014IR 05000277-14-007 and 05000278-14-007; 03-03-2014 to 04-04-2014; Exelon Generation Company, LLC; Peach Bottom Atomic Power Station, Units 2 and 3; Component Design Bases Inspection
ML14111A1479 May 2014Seismic Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights