RA-21-0132, Application for Subsequent Renewed Operating Licenses. Part 7 of 87 June 2021Application for Subsequent Renewed Operating Licenses. Part 7 of 8
RA-20-0280, Submittal of IWB-3640 Analytical Evaluation Performed to Accept an ASME Section XI Code Rejected Sub-Surface Flaw14 September 2020Submittal of IWB-3640 Analytical Evaluation Performed to Accept an ASME Section XI Code Rejected Sub-Surface Flaw
ML20189A08029 June 20208 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML20189A07429 June 20208 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML20189A09229 June 20208 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML20189A08129 June 20208 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5A, Tables
ML20189A08329 June 20208 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safeguards
ML20189A07529 June 20208 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, Tables
ML18197A20125 July 2018Staff Review of Spent Fuel Pool Evaluation Associated with Reevaluated Seismic Hazard Implementation Near- Task Force Recommendation 2.1: Seismic
ML18192A94431 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML18192A92331 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safeguards
ML18192A91931 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5A, Tables
ML18192A91731 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML18192A90531 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, Tables
ML18192A90331 December 2017Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ONS-2017-087, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ...4 December 2017Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ...
ONS-2017-079, Supplemental Information to Support NRC Review of Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency13 November 2017Supplemental Information to Support NRC Review of Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency
ML17292A14226 October 2017Supplemental Information Needed for Acceptance of Relief Request No. 17-ON-001
ML17202U79130 August 2017Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051
ML17179A34718 July 2017Summary of Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Thermal Margin for the Standby Shutdown Facility
ONS-2017-034, Emergency Plan Revision 2017-00120 April 2017Emergency Plan Revision 2017-001
ML17118A02320 April 2017Oconee Nuclear Station Emergency Plan Revision 2017-002. Part 1 of 2
ONS-2017-030, Oconee Nuclear Station Emergency Plan Revision 2017-002. Part 1 of 220 April 2017Oconee Nuclear Station Emergency Plan Revision 2017-002. Part 1 of 2
ML17031A43126 January 2017Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and FLEX Final Integrated Plan
ML16069A1449 March 2016NRR E-mail Capture - Oconee Nuclear Station, Units 1, 2, and 3- Tech Review Checklist Supporting Implementation of NTTF Recom 2.1, Seismic, Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident
ONS-2016-025, Completion of Required Action by NRC Order EA-12-051 with Regard to Reliable Spent Fuel Pool Instrumentation29 February 2016Completion of Required Action by NRC Order EA-12-051 with Regard to Reliable Spent Fuel Pool Instrumentation
ONS-2016-008, Response to Request for Additional Information Regarding the License Amendment Request to Change to Emergency Plan to Upgrade Emergency Action Levels Based on NEI 99-01, Revision 64 February 2016Response to Request for Additional Information Regarding the License Amendment Request to Change to Emergency Plan to Upgrade Emergency Action Levels Based on NEI 99-01, Revision 6
ML15344A1835 January 2016Report for the Audit of Duke Energy Carolinas, LLC Interim Evaluations Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation
ML16034A32531 December 2015Revision 0 to Summary of Methodology Used for Seismic Capacity Evaluation of GMRS Mitigation Components
ML15201A00822 July 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review
ONS-2015-072, Updated Final Safety Analysis Report, Revision 24, Chapter 9 - Auxiliary Systems30 June 2015Updated Final Safety Analysis Report, Revision 24, Chapter 9 - Auxiliary Systems
ONS-2015-073, ISFSI - Updated Final Safety Analysis Report, Revision 24, Appendix A. Tables30 June 2015ISFSI - Updated Final Safety Analysis Report, Revision 24, Appendix A. Tables
ML15050A67119 June 2015Issuance of Amendments Regarding Inspection Plan for Reactor Vessel Internals
ML16272A2176 March 2015Revision 1 to Flood Hazard Reevaluation Report on Oconee Nuclear Station, Pp. 1-70, Dated March 6, 2015 (Redacted)
ONS-2014-161, Submittal of the Expedited Seismic Evaluation Process Report (CEUS Sites)19 December 2014Submittal of the Expedited Seismic Evaluation Process Report (CEUS Sites)
ML14206A79013 August 2014Issuance of Amendments Regarding Implementation of the Protected Service Water System
ML14211A21331 July 2014Duke Energy Presentation for 2014-07-31 Meeting
ONS-2014-086, Updated Final Safety Analysis Report, Revision 23, Chapter 9, Auxiliary Systems30 June 2014Updated Final Safety Analysis Report, Revision 23, Chapter 9, Auxiliary Systems
ONS-2014-085, Independent Spent Fuel Storage Installation Updated Final Safety Analysis Report, Revision 23, Appendix A. Tables - Table A-23 (Page 1 of 1)30 June 2014Independent Spent Fuel Storage Installation Updated Final Safety Analysis Report, Revision 23, Appendix A. Tables - Table A-23 (Page 1 of 1)
ONS-2014-087, Supplement 1 to ONS Response to Request for Additional Information Regarding Fukushima Flood Hazard Reanalysis Report (Questions Lc and 14)13 June 2014Supplement 1 to ONS Response to Request for Additional Information Regarding Fukushima Flood Hazard Reanalysis Report (Questions Lc and 14)
ML14111A1479 May 2014Seismic Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights
ML14135A4087 May 2014FOIA/PA-2013-0213 - Resp 3 - Final, Group Letter D. Part 1 of 1
ML15065A33723 April 2014Response to NRC Request for Additional Information (RAI) Related to the MRP-227-A Applicant/Licensee Action Item #7 Analysis Supporting the Reactor Vessel Internals Inspection Plan Amendment Request (ANP-3267Q1NP (R1))
ML14076A0002 April 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident
ONS-2014-046, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3..31 March 2014Seismic Hazard and Screening Report (CEUS Sites), Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3..
ML14087A17520 March 2014ANP-3267Q1NP, Rev. 0, Response to NRC Request for Additional Information (RAI) Related to the MRP-227-A Applicant/Licensee Action Item #7 Analysis Supporting the Reactor Vessel Internals Inspection Plan Amendment Request for Oconee, Units 1
ML14064A59120 March 2014Request for Additional Information Regarding Fukushima Lessons Learned Flood Hazard Reevaluation Report (TAC Nos. MF1012, MF1013, and MF1014)
ML13365A25810 February 2014Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)
ML14028A5124 February 2014Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Oconee Nuclear Station, Units 1, 2, and 3, TAC Nos.: MF0782, MF0783, and MF0784
ONS-2013-037, Licensing Basis for Protected Service Water System - Responses to Request for Additional Information Item Nos. 172 Through 189, License Amendment Request (LAR) 2008-07 - Supplement 718 December 2013Licensing Basis for Protected Service Water System - Responses to Request for Additional Information Item Nos. 172 Through 189, License Amendment Request (LAR) 2008-07 - Supplement 7