Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 | 31 January 2023 | Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 |
JAFP-22-0007, Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 | 31 January 2022 | Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 |
ML21287A006 | 14 October 2021 | Supplemental Information No.1 for R.E. Ginna Nuclear Power Plant to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, - Risk-Informed Categorization and Treatment of Structu |
ML21250A382 | 29 September 2021 | R. E. Ginna Nuclear Power Plant - Issuance of Relief Request I6R-06 Alternate Inspection for Reactor Vessel Internals |
ML21141A009 | 20 May 2021 | R. E. Ginna Nuclear Power Plant - Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors |
ML21132A079 | 12 May 2021 | Additional Information Concerning the Proposed Alternative to Use the Successive Inspection Requirements of IWB-2420(c) of the 2017 Edition of ASME Section XI |
IR 05000244/2021001 | 5 May 2021 | LLC: Integrated Inspection Report 05000244/2021001 |
ML21055A020 | 19 February 2021 | Transmittal of 2020 Owner'S Activity Report |
ML20339A182 | 20 November 2020 | Fire Protection Program, Revision 18, Volumes I - III |
ML20339A068 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems, Table of Contents |
ML20339A065 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Sections 6.1 Through 6.6 |
ML20339A013 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Section 5.1 Thru 5.8 |
ML20339A062 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 8, Electric Power, Sections 8.1 Through 8.3 |
ML20339A057 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Sections 3.9 Through 3.11 |
ML20339A055 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Section 3.8, Design of Seismic Category I Structures |
ML20339A020 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Sections 3.1 Through 3.7 |
ML20339A040 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Sections 10.1 Thru 10.7 |
ML20339A025 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Sections 9.1 Through 9.5 |
ML20339A027 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Sections 7.1 Through 7.7 |
ML20339A033 | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Sections 2.1 Through 2.5 |
ML20248H388 | 4 September 2020 | Response to Request for Additional Information - License Amendment Request for Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System. |
ML19325D824 | 23 December 2019 | R. E. Ginna Nuclear Power Plant Issuance of Amendment No. 136 to Revise Technical Specification 5.5.15, Containment Leakage Rate Testing Program, to Extend Containment Integrated Leak Rate Test Frequency |
ML19150A506 | 10 May 2019 | R.E Ginna Nuclear Power Plant Revision 17 to Fire Protection Program |
ML19150A481 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 10, Sections 10.1 Thru 10.7 |
ML19150A478 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 09, Sections 9.1 Thru 9.5 |
ML19150A474 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 08, Sections 8.1 Thru 8.3 |
ML19150A471 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.1 Thru 7.7 |
ML19150A468 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 6, Sections 6.1 Thru 6.6 |
ML19150A465 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.1 Thru 5.8 |
ML19150A446 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.9, Mechanical Systems and Components |
ML19150A445 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Section 3.8, Design of Seismic Category I Structures |
ML19150A444 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems |
ML19150A443 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Table of Contents |
ML19150A435 | 10 May 2019 | Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics |
ML19045A282 | 15 February 2019 | R. E. Ginna Nuclear Power Plant - License Amendment Request (LAR) to Revise Technical Specification (TS) 5.5.15, Containment Leakage Rate Testing Program, for Permanent Extension of Type a Leak Rate Test Frequencies |
JAFP-19-0016, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 | 8 February 2019 | Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 |
ML18117A010 | 19 April 2018 | Attachment 1 - 10 CFR 50.54(q)(5) Change Summary Analysis |
RA-18-008, Summary of Changes to Quality Assurance Topical Report, NO-AA-10 | 8 February 2018 | Summary of Changes to Quality Assurance Topical Report, NO-AA-10 |
ML18033A734 | 26 January 2018 | EP-AA-1012, Addendum 3, Revision 5, R. E. Ginna Nuclear Power Plant Emergency Action Levels. |
ML17321A107 | 16 November 2017 | R. E. Ginna, License Amendment Request to Revise Technical Specifications for Selected Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation Channels to Incorporate Bypass Test Capability |
ML17138A123 | 3 May 2017 | Exelon Nuclear Radiological Emergency Plan Addendum Revisions, Including Revision 3 to EP-AA-1006, Addendum 3 and Revision 4 to EP-AA-1012, Addendum 3 |
ML16124A038 | 14 July 2016 | Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 |
ML16166A294 | 20 June 2016 | R. E. Ginna Nuclear Power Plant - Staff Review of Mitigation Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter |
ML16180A164 | 5 May 2016 | Revision 26 to the Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML16180A166 | 5 May 2016 | Revision 26 to the Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System |
ML16180A162 | 5 May 2016 | Revision 26 to the Updated Final Safety Analysis Report, Chapter 8, Electric Power |
ML16180A132 | 5 May 2016 | Revision 26 to the Updated Final Safety Analysis Report, Chapter 2, Site Characteristics |
ML16180A128 | 5 May 2016 | Revision 26 to the Updated Final Safety Analysis Report - Table of Contents |
ML16180A156 | 5 May 2016 | Revision 26 to the Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML16180A142 | 5 May 2016 | Revision 26 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Sections 3.9 Mechanical Systems and Components |