Semantic search

Jump to navigation Jump to search
 Issue dateTitle
RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-1031 January 2023Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10
JAFP-22-0007, Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-1031 January 2022Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10
ML21287A00614 October 2021Supplemental Information No.1 for R.E. Ginna Nuclear Power Plant to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, - Risk-Informed Categorization and Treatment of Structu
ML21250A38229 September 2021R. E. Ginna Nuclear Power Plant - Issuance of Relief Request I6R-06 Alternate Inspection for Reactor Vessel Internals
ML21141A00920 May 2021R. E. Ginna Nuclear Power Plant - Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors
ML21132A07912 May 2021Additional Information Concerning the Proposed Alternative to Use the Successive Inspection Requirements of IWB-2420(c) of the 2017 Edition of ASME Section XI
IR 05000244/20210015 May 2021LLC: Integrated Inspection Report 05000244/2021001
ML21055A02019 February 2021Transmittal of 2020 Owner'S Activity Report
ML20339A18220 November 2020Fire Protection Program, Revision 18, Volumes I - III
ML20339A06820 November 20209 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems, Table of Contents
ML20339A06520 November 20209 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Sections 6.1 Through 6.6
ML20339A01320 November 20209 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Section 5.1 Thru 5.8
ML20339A06220 November 20209 to Updated Final Safety Analysis Report, Chapter 8, Electric Power, Sections 8.1 Through 8.3
ML20339A05720 November 20209 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Sections 3.9 Through 3.11
ML20339A05520 November 20209 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Section 3.8, Design of Seismic Category I Structures
ML20339A02020 November 20209 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Sections 3.1 Through 3.7
ML20339A04020 November 20209 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Sections 10.1 Thru 10.7
ML20339A02520 November 20209 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Sections 9.1 Through 9.5
ML20339A02720 November 20209 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Sections 7.1 Through 7.7
ML20339A03320 November 20209 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Sections 2.1 Through 2.5
ML20248H3884 September 2020Response to Request for Additional Information - License Amendment Request for Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System.
ML19325D82423 December 2019R. E. Ginna Nuclear Power Plant Issuance of Amendment No. 136 to Revise Technical Specification 5.5.15, Containment Leakage Rate Testing Program, to Extend Containment Integrated Leak Rate Test Frequency
ML19150A50610 May 2019R.E Ginna Nuclear Power Plant Revision 17 to Fire Protection Program
ML19150A48110 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 10, Sections 10.1 Thru 10.7
ML19150A47810 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 09, Sections 9.1 Thru 9.5
ML19150A47410 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 08, Sections 8.1 Thru 8.3
ML19150A47110 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.1 Thru 7.7
ML19150A46810 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 6, Sections 6.1 Thru 6.6
ML19150A46510 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.1 Thru 5.8
ML19150A44610 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.9, Mechanical Systems and Components
ML19150A44510 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Section 3.8, Design of Seismic Category I Structures
ML19150A44410 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML19150A44310 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Table of Contents
ML19150A43510 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics
ML19045A28215 February 2019R. E. Ginna Nuclear Power Plant - License Amendment Request (LAR) to Revise Technical Specification (TS) 5.5.15, Containment Leakage Rate Testing Program, for Permanent Extension of Type a Leak Rate Test Frequencies
JAFP-19-0016, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-108 February 2019Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10
ML18117A01019 April 2018Attachment 1 - 10 CFR 50.54(q)(5) Change Summary Analysis
RA-18-008, Summary of Changes to Quality Assurance Topical Report, NO-AA-108 February 2018Summary of Changes to Quality Assurance Topical Report, NO-AA-10
ML18033A73426 January 2018EP-AA-1012, Addendum 3, Revision 5, R. E. Ginna Nuclear Power Plant Emergency Action Levels.
ML17321A10716 November 2017R. E. Ginna, License Amendment Request to Revise Technical Specifications for Selected Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation Channels to Incorporate Bypass Test Capability
ML17138A1233 May 2017Exelon Nuclear Radiological Emergency Plan Addendum Revisions, Including Revision 3 to EP-AA-1006, Addendum 3 and Revision 4 to EP-AA-1012, Addendum 3
ML16124A03814 July 2016Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051
ML16166A29420 June 2016R. E. Ginna Nuclear Power Plant - Staff Review of Mitigation Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter
ML16180A1645 May 2016Revision 26 to the Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML16180A1665 May 2016Revision 26 to the Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML16180A1625 May 2016Revision 26 to the Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML16180A1325 May 2016Revision 26 to the Updated Final Safety Analysis Report, Chapter 2, Site Characteristics
ML16180A1285 May 2016Revision 26 to the Updated Final Safety Analysis Report - Table of Contents
ML16180A1565 May 2016Revision 26 to the Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML16180A1425 May 2016Revision 26 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Sections 3.9 Mechanical Systems and Components