Issue date | Title | |
---|---|---|
ML23233A176 | 17 August 2023 | Application for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 |
ML23072A089 | 1 May 2023 | (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements |
ML22334A272 | 30 November 2022 | (VCSNS) Unit 1 - Technical Specification Bases Changes Updated Through November 2022 |
ML22160A365 | 16 August 2022 | Issuance of Amendment No. 222 to Relocate Selected Surveillance Frequencies to a Risk-Informed Licensee Controlled Program |
ML22194A220 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML22194A185 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems - Redacted |
ML22146A027 | 25 May 2022 | Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant. |
ML22041A010 | 1 March 2022 | V.C. Summer 1, Issuance of Amendment Nos. 283 (Millstone), 291 and 274 (North Anna), and 221 (Summer) to Revise TSs to Adopt TSTF-569 Revision of Response Time Testing Definition |
ML21209A160 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML21209A145 | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML21102A127 | 9 April 2021 | (Vcsns), Unit 1 - Application for Technical Specification Change Regarding Risk Informed Justification for the Relocation of Specific Surveillance Frquency Requirements to Licensee-Controlled Program |
ML19255F507 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML19255F499 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML19255F491 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System |
ML19255F485 | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems |
ML19053A544 | 22 February 2019 | (Vcsns), Unit 1 - Supplemental Letter to License Amendment Request - LAR-16-00644 License Amendment Request - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 |
RC-18-0136, (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683) | 12 December 2018 | (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683) |
RC-18-0067, (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 | 8 October 2018 | (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 |
ML18221A167 | 31 May 2018 | Updated Final Safety Analysis Report, Chapter 5.0, Reactor Coolant System |
RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment and Systems | 31 May 2018 | Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment and Systems |
RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 5.0, Reactor Coolant System | 31 May 2018 | Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 5.0, Reactor Coolant System |
ML18221A165 | 31 May 2018 | Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment and Systems |
ML18057A767 | 26 February 2018 | 301 Exam Final Items (Delayed Release-2 Year) |
ML18057A740 | 26 February 2018 | VCS Unit 1 2017-301 Exam Draft Items (Delayed Release-2 Years) |
ML20311A358 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
IR 05000395/2017002 | 9 August 2017 | NRC Integrated Inspection Report 05000395/2017002 and Notice of Violation |
ML17181A362 | 30 June 2017 | V.C. Summer 2015-301 Exam Final Items for ADAMS 2B |
ML17181A354 | 30 June 2017 | V.C. Summer 2015-301 Exam Draft Items for ADAMS 2A |
ML16179A271 | 24 June 2016 | (Unit 1) 2016-301 SRO As-Given Written Exam |
ML17193A923 | 10 August 2015 | (U2) 2016-301 Exam Draft Items - Delay Release |
RC-14-0032, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments III, IV, V & VI: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EAL Comparison.. | 7 April 2014 | License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments III, IV, V & VI: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EAL Comparison.. |
ML14122A158 | 7 April 2014 | License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. EPP-108, Enclosure 1, Revision 01 (Draft E) |
RC-14-0032, Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. EPP-108, Enclosure 1, Revision 01 (Draft E) | 7 April 2014 | Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. EPP-108, Enclosure 1, Revision 01 (Draft E) |
RC-14-0032, Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments Iii, Iv, V & Vi: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EA | 7 April 2014 | Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments Iii, Iv, V & Vi: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EAL |
ML13262A054 | 17 September 2013 | VC Summer 2013-301 Initial Exam Final RO Written Exam |
ML12195A237 | 11 July 2012 | Technical Specification Bases Revision Updated Through June 2012 |
ML11326A250 | 22 February 2012 | Issuance of Amendment Regarding Reactor Coolant System Leakage Detection Systems |
RC-11-0094, Technical Specification Bases Revision Updated Through June 2011 | 31 August 2011 | Technical Specification Bases Revision Updated Through June 2011 |
RC-11-0052, License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. | 2 May 2011 | License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. |
ML101650049 | 9 June 2010 | Technical Specification Bases Revision Updated Through January 2009 |
ML092850008 | 10 October 2009 | Initial Exam 2009-301 Draft Simulator Scenarios |
ML092850023 | 10 October 2009 | Initial Exam 2009-301 Final Simulator Scenarios |
RC-09-0004, License Amendment Request - LAR 04-02911 License Amendment and Related Technical Specification Changes to Implement Full-scope Alternative Source Term in Accordance with 10 CFR 50.67 | 17 February 2009 | License Amendment Request - LAR 04-02911 License Amendment and Related Technical Specification Changes to Implement Full-scope Alternative Source Term in Accordance with 10 CFR 50.67 |
ML071370509 | 15 May 2007 | Technical Specifications, Issuance of Amendment Regarding Steam Generator Tube Integrity |
RC-07-0025, License Amendment Request - LAR 05-3594 Steam Generator Tube Integrity | 15 February 2007 | License Amendment Request - LAR 05-3594 Steam Generator Tube Integrity |
RC-07-0021, Inspection and Mitigation Plan/Schedule of Alloy 82/182 Pressurizer Butt Welds (C-04-1719) | 31 January 2007 | Inspection and Mitigation Plan/Schedule of Alloy 82/182 Pressurizer Butt Welds (C-04-1719) |
RC-06-0222, Response to Request for Additional Information Regarding NRC Bulletin 2004-01 Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Connections at Pressurized-Water Reactors | 5 January 2007 | Response to Request for Additional Information Regarding NRC Bulletin 2004-01 Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Connections at Pressurized-Water Reactors |
RC-06-0084, License Amendment Request - LAR 05-3594, Steam Generator Tube Integrity | 24 May 2006 | License Amendment Request - LAR 05-3594, Steam Generator Tube Integrity |
IR 05000395/2006007 | 28 April 2006 | IR 05000395-06-007; South Carolina Electric & Gas Company; 03/17/2006 - 03/31/2006; Virgil C. Summer Nuclear Station |
ML060030435 | 30 December 2005 | Rii Presentation Revised - RF-15 Outage Information |