 Issue dateTitle
ML23233A17617 August 2023Application for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390
ML23072A0891 May 2023(Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements
ML22334A27230 November 2022(VCSNS) Unit 1 - Technical Specification Bases Changes Updated Through November 2022
ML22160A36516 August 2022Issuance of Amendment No. 222 to Relocate Selected Surveillance Frequencies to a Risk-Informed Licensee Controlled Program
ML22194A22027 June 20222 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
ML22194A18527 June 20222 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems - Redacted
ML22146A02725 May 2022Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant.
ML22041A0101 March 2022V.C. Summer 1, Issuance of Amendment Nos. 283 (Millstone), 291 and 274 (North Anna), and 221 (Summer) to Revise TSs to Adopt TSTF-569 Revision of Response Time Testing Definition
ML21209A16030 April 20211 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
ML21209A14530 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML21102A1279 April 2021(Vcsns), Unit 1 - Application for Technical Specification Change Regarding Risk Informed Justification for the Relocation of Specific Surveillance Frquency Requirements to Licensee-Controlled Program
ML19255F50731 May 2019Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML19255F49931 May 2019Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
ML19255F49131 May 2019Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System
ML19255F48531 May 2019Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems
ML19053A54422 February 2019(Vcsns), Unit 1 - Supplemental Letter to License Amendment Request - LAR-16-00644 License Amendment Request - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2
RC-18-0136, (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683)12 December 2018(Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683)
RC-18-0067, (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.28 October 2018(Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2
ML18221A16731 May 2018Updated Final Safety Analysis Report, Chapter 5.0, Reactor Coolant System
RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment and Systems31 May 2018Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment and Systems
RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 5.0, Reactor Coolant System31 May 2018Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 5.0, Reactor Coolant System
ML18221A16531 May 2018Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment and Systems
ML18057A76726 February 2018301 Exam Final Items (Delayed Release-2 Year)
ML18057A74026 February 2018VCS Unit 1 2017-301 Exam Draft Items (Delayed Release-2 Years)
ML20311A3586 November 20172017 Q1-Q4 ROP Inspection Findings
IR 05000395/20170029 August 2017NRC Integrated Inspection Report 05000395/2017002 and Notice of Violation
ML17181A36230 June 2017V.C. Summer 2015-301 Exam Final Items for ADAMS 2B
ML17181A35430 June 2017V.C. Summer 2015-301 Exam Draft Items for ADAMS 2A
ML16179A27124 June 2016(Unit 1) 2016-301 SRO As-Given Written Exam
ML17193A92310 August 2015(U2) 2016-301 Exam Draft Items - Delay Release
RC-14-0032, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments III, IV, V & VI: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EAL Comparison..7 April 2014License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments III, IV, V & VI: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EAL Comparison..
ML14122A1587 April 2014License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. EPP-108, Enclosure 1, Revision 01 (Draft E)
RC-14-0032, Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. EPP-108, Enclosure 1, Revision 01 (Draft E)7 April 2014Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. EPP-108, Enclosure 1, Revision 01 (Draft E)
RC-14-0032, Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments Iii, Iv, V & Vi: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EA7 April 2014Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments Iii, Iv, V & Vi: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EAL
ML13262A05417 September 2013VC Summer 2013-301 Initial Exam Final RO Written Exam
ML12195A23711 July 2012Technical Specification Bases Revision Updated Through June 2012
ML11326A25022 February 2012Issuance of Amendment Regarding Reactor Coolant System Leakage Detection Systems
RC-11-0094, Technical Specification Bases Revision Updated Through June 201131 August 2011Technical Specification Bases Revision Updated Through June 2011
RC-11-0052, License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation.2 May 2011License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation.
ML1016500499 June 2010Technical Specification Bases Revision Updated Through January 2009
ML09285000810 October 2009Initial Exam 2009-301 Draft Simulator Scenarios
ML09285002310 October 2009Initial Exam 2009-301 Final Simulator Scenarios
RC-09-0004, License Amendment Request - LAR 04-02911 License Amendment and Related Technical Specification Changes to Implement Full-scope Alternative Source Term in Accordance with 10 CFR 50.6717 February 2009License Amendment Request - LAR 04-02911 License Amendment and Related Technical Specification Changes to Implement Full-scope Alternative Source Term in Accordance with 10 CFR 50.67
ML07137050915 May 2007Technical Specifications, Issuance of Amendment Regarding Steam Generator Tube Integrity
RC-07-0025, License Amendment Request - LAR 05-3594 Steam Generator Tube Integrity15 February 2007License Amendment Request - LAR 05-3594 Steam Generator Tube Integrity
RC-07-0021, Inspection and Mitigation Plan/Schedule of Alloy 82/182 Pressurizer Butt Welds (C-04-1719)31 January 2007Inspection and Mitigation Plan/Schedule of Alloy 82/182 Pressurizer Butt Welds (C-04-1719)
RC-06-0222, Response to Request for Additional Information Regarding NRC Bulletin 2004-01 Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Connections at Pressurized-Water Reactors5 January 2007Response to Request for Additional Information Regarding NRC Bulletin 2004-01 Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Connections at Pressurized-Water Reactors
RC-06-0084, License Amendment Request - LAR 05-3594, Steam Generator Tube Integrity24 May 2006License Amendment Request - LAR 05-3594, Steam Generator Tube Integrity
IR 05000395/200600728 April 2006IR 05000395-06-007; South Carolina Electric & Gas Company; 03/17/2006 - 03/31/2006; Virgil C. Summer Nuclear Station
ML06003043530 December 2005Rii Presentation Revised - RF-15 Outage Information