ML23325A16126 October 2023Relief Request 70 - Proposed Alternatives in Accordance with 10 CFR 50.55a(z)(1) for Pressurizer Lower Shell Temperature Nozzle
ML23296A01620 October 2023October 20, 2023 Presubmittal Meeting Presentation - 1R24 Pressurizer Nozzle Repair - RR-70 (EPID: L?2023?LLR-0057)
ML23181A16630 June 2023Enclosure 2 - Palo Verde Nuclear Generating Station Units 1, 2, and 3, Revision 22 to Updated Final Safety Analysis Report, Redacted Per RIS 2015-17
ML22250A7097 September 2022Generation Station, Emergency Plan, Revision 74
ML22173A08721 June 2022Generation Station (Pvngs), Units 1, 2, and 3 and Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 73
ML21203A13822 July 2021Generation Station (Pvngs), Units 1, 2, and 3 and Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 70
ML21203A15222 July 2021Generation Station (Pvngs), Units 1, 2, and 3 and Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 71
ML20090L94430 March 2020APS Response to Request for Additional Information- Relief Request 65 Unit 2, COVID-19, Request for Relief from Bottom Mounted Instrumentation Nozzles and a Pressurizer Nozzle to Surge
ML19037A05519 February 2019Relief Requests 60 & 61 for the Fourth 10-Year Inservice Inspection Interval, Request for Relief from the American Society of Mechanical Engineers Half-Nozzle Repairs (EPID L-2018-LLR-0111 & EPID L-2018-LLR-0112)
ML18341A1596 December 2018Emergency Plan, Revision 63
ML18269A36225 September 2018ISFSI - Emergency Plan, Revision 62
ML18172A00712 June 2018Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 61
ML17299B33326 October 2017Relief Request 57 - Request for Alternative to American Society of Mechanical Engineers Code Case N-729-4 for Replacement Reactor Vessel Closure Head Penetration Nozzles
ML17269A26421 September 2017Enclosure 1: Palo Verde, Units 1, 2, and 3, and ISFSI - Emergency Plan, Revision 60
ML17263B24915 September 2017Emergency Plan, Rev. 59. Part 2 of 2
ML17173A87722 June 2017Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing
IR 05000528/20160041 February 2017NRC Integrated Inspection Report 05000528/2016004, 05000529/2016004, and 05000530/2016004 and Exercise of Enforcement Discretion
IR 05000528/201600310 November 2016NRC Integrated Inspection Report 05000528/2016003, 05000529/2016003 and 05000530/2016003, and Independent Spent Fuel Storage Installation Inspection Report 07200044/2016001
ML16321A4633 November 2016Palo VERDE-2016-10 Final Written Exam
IR 05000528/20160025 August 2016NRC Integrated Inspection Report 05000528/2016002, 05000529/2016002, and 05000530/2016002, April 1, 2016 Through June 30, 2016
ML16172A03823 June 2016Relief Request 54 to Approve an Alternative to Flaw Removal for Reactor Coolant Pump 2A Suction Pressure Instrument Nozzle, for the Third 10-Year Inservice Inspection Interval
05000528/LER-2016-0019 June 2016. Leakage from Reactor Coolant Pump 2B Discharge Pipe Instrument Nozzle
LER 16-001-00 for Palo Verde Nuclear Generating Station Unit 1 RE: Leakage from Reactor Coolant Pump 2B Discharge Pipe Instrument Nozzle
ML16154A61412 May 2016PVNGS, Units 1, 2, and 3 - Technical Specification Bases, Revision 63
ML16133A62112 May 2016ISFSI - Response to Request for Additional Information Regarding Proposed Changes to Emergency Action Levels
IR 05000528/20150048 February 2016NRC Integrated Inspection Report 05000528/2015004, 05000529/2015004, and 05000530/2015004
ML15300A21322 October 2015American Society of Mechanical Engineers (ASME) Code, Section XI, Request for Approval of an Alternative to Flaw Removal - Relief Request 54
ML15293A3359 October 2015Independent Spent Fuel Storage Installation (ISFSI) - Request for NRC Approval of Proposed Changed to Emergency Action Levels
ML15238B66115 September 2015Relief Request 53, Alternative to ASME Code Section XI Requirements Related to Flaw Removal
ML15139A30024 April 2015Technical Specification Bases (TS Bases), Revision 62
ML15111A42917 April 2015American Society of Mechanical Engineers (ASME) Code, Section XI, Request for Approval of an Alternative to Flaw Removal - Relief Request 53
ML15111A43017 April 2015Attachments 2 & 3: Flaw Fracture Mechanics, Corrosion & Loose Parts Evaluations for One Cycle Relief (DAR-MRCDA-15-6-NP) and APS Response to NRC Request for Additional Information Dated April 14, 2015
ML15110A47915 April 2015NRR E-mail Capture - Palo Verde, Unit 3 - Information Regarding Pressure Boundary Leakage in Reactor Coolant Pump 2A Pressure Instrumentation Nozzle for April 15, 2015 Phone Call (MF6083)
ML15104A81014 April 2015NRR E-mail Capture - Palo Verde, Unit 3 - Request for Information Regarding Pressure Boundary Leakage in RCP 2A Pressure Instrumentation Nozzle (MF6083)
ML15103A2889 April 2015Presentation on Potential Relief Request About Pressure Boundary Leakage on Reactor Coolant Pump 2A Pipe Nozzle
ML15027A12219 December 2014Technical Specification (TS) Bases Revision 61
ML14255A06329 August 2014Technical Specification Bases, Revision 60
ML14255A06420 August 2014PVNGS Technical Specification Bases (TS Bases), Revision 60, Replacement Pages and Insertion Instructions
IR 05000528/200052913 August 2014IR 05000528, 05000529, 05000530-14-003; on 04/01/2014 - 06/30/2014; Palo Verde Nuclear Generating Station; Problem Identification and Resolution
IR 05000528/201400313 August 2014IR 05000528, 05000529, 05000530-14-003; on 04/01/2014 - 06/30/2014; Palo Verde Nuclear Generating Station; Problem Identification and Resolution
ML14091A95619 March 2014Technical Specification (TS) Bases Revision 59
ML13294A57625 November 2013Issuance of Amendment Nos. 192, 192, and 192, Adopt TSTF-490, Revision 0, Deletion of E-Bar Definition and Revision to RCS Specific Activity Technical Specifications
ML13311B18318 November 2013Summary of Meeting with Arizona Public Service Company to Discuss Non-destructive Examination Efforts, Repairs, and Progress on Root Cause Identified During Inspection of Bottom-Mounted Instrumentation Nozzles at Palo Verde, Unit 3
ML13343A1359 November 2013PV-2013-11 Final Op Test
ML14149A3428 November 2013Calculation 51-9214650-000, Corrosion Evaluation for Reactor Vessel Bmi Nozzle Modification, (Non-Proprietary), Attachment 2
ML13343A2994 November 20132013-11 Draft Operating Test
ML13294A37321 October 201311/4/13 Notice of Meeting with Arizona Public Service Company to Discuss Non-destructive Examination Efforts, Repairs, and Progress on Root Cause Identified During Inspection of Bottom-Mounted Instrumentation Nozzles at Palo Verde, Unit 3
ML13217A0553 July 2013Enclosure 1 - Technical Specifications Bases, Revision 58
ML13120A50110 April 2013Technical Specification Bases, Revision 57
ML12353A15812 December 2012Application for Technical Specification Improvement to Adopt TSTF-490, Revision 0, Deletion of E-Bar Definition and Revision to RCS Specific Activity Technical Specifications
ML12193A04130 May 2012Technical Specification Bases, Revision 56