Information Notice 1998-13, Post-Refueling Outage Reactor Pressure Vessel Leak Testing Before Core Criticality20 April 1998Post-Refueling Outage Reactor Pressure Vessel Leak Testing Before Core Criticality
ML20217R36528 August 1997Provides 27th & Final Update of Big Rock Point Integrated Plan.Util Has Decided to Cease Permanent Operation of Facility by 970830.Change to License Along W/Ts Is Being Prepared to Delete Plan & Reflect Defueled Configuration
NRC Generic Letter 1995-1015 December 1995NRC Generic Letter 1995-010: Relocation of Selected Technical Specifications Requirements Related to Instrumentation
ML0311405497 November 1991Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability
NRC Generic Letter 1990-0625 June 1990NRC Generic Letter 1990-006: Resolution of Generic Issue, Power-Operated Relief Valve and Block Valve Reliability, and Generic Issue 94, Additional Low-Temp. Overpressure Protection for Light-Water Reactors, Pursuant to 10 CFR 50354 (F)
ML20245B99518 April 1989Forwards Request for Addl Info Re 880725 Response to Generic Ltr 88-01.Response Requested within 60 Days of Ltr Date
ML20235R77027 February 1989Forwards Integrated Plan,Semiannual Update 10.Issues Added to Plan Include,Rewiring CRD Accumulator Pressure Switch & Leak Detector Schemes & Evaluate Instrument Air Sys Per Generic Ltr 88-14
ML20155B09026 September 1988Submits Integrated Plan Semiannual Update 9.Attachment 1 Contains Index of Issues Identified by Category,Rank,Status & Description.Attachment 2 Lists Open Issues & Contains Detailed Scope Statements,Status & Completion Dates
ML20147D65929 February 1988Issue Index for Big Rock Point Integrated Plan
IR 05000155/198800229 February 1988Insp Rept 50-155/88-02 on 871214-880216.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety, Maint & Surveillance Operation,Regional Requests,Reactor Trips,Ie Bulletins,Ler Followup & Training
ML20237K78631 August 1987Provides 7th Update of Status of Facility Integrated Plan. Attachment 1 Contains Index of All Issues & Identifies Issues by Category,Rank,Description & Status.Attachment 2 Contains Detailed List of All Open Issues
ML20214E34915 May 1987Responds to Generic Ltr 87-06 Re Periodic Verification of Leak Tight Integrity of Pressure Isolation Valves.Present Tech Spec Requirements Combined W/Sys Design Features Adequate to Detect RCS Pressure Boundary Leakage
ML20212D86627 February 1987Provides Sixth Update of Status of Plant Integrated Plan. Index of Issues & Detailed List of Open Issues Encl
ML20206Q95729 August 1986Provides Fifth Integrated Plan Semiannual Update.Refueling Outage Scheduled for 1986 Changed to Start in Jan 1987 & 1987 Refueling Outage Rescheduled for 1988
ML20154D37728 February 1986Provides Fourth Semiannual Update of Integrated Plan for Plant.Issue Index & Detailed Listing of All Open Issues Encl