Semantic search
Jump to navigation
Jump to search
Start date | Site | Title | |
---|---|---|---|
05000315/FIN-2018010-01 | 30 September 2018 23:59:59 | Cook | Record Retention Requirements of the Boron Injection Tank and its Associated Support Structure |
05000282/FIN-2018011-01 | 30 June 2018 23:59:59 | Prairie Island | Failure to Justify Load Combinations Used in Main Steam Piping Stress Analysis |
05000397/FIN-2015003-02 | 30 September 2015 23:59:59 | Columbia | Non-Conservative Shutdown Criteria in Earthquake Abnormal Procedure |
05000397/FIN-2015003-01 | 30 September 2015 23:59:59 | Columbia | Failure to Maintain Seismic Instrumentation Functional to Alert Plant Operators of Ground Motions Exceeding the Operating Basis Earthquake |
05000272/FIN-2015002-03 | 30 June 2015 23:59:59 | Salem | Inadequate Seismic EAL Scheme |
05000346/FIN-2013010-01 | 30 September 2014 23:59:59 | Davis Besse | 10 CFR 50.59 Safety Evaluation Not Performed for Calculated Component Damping |
05000456/FIN-2014003-01 | 30 June 2014 23:59:59 | Braidwood | Issues That Could Adversely Affect the UHS |
05000528/FIN-2013004-01 | 30 September 2013 23:59:59 | Palo Verde | Failure to Maintain an Effective Emergency Plan for a Seismic Event |
05000254/FIN-2013003-04 | 30 June 2013 23:59:59 | Quad Cities | Question Concerning Availability of Dam Following a Seismic Event |
05000456/FIN-2012005-04 | 31 December 2012 23:59:59 | Braidwood | Operability Evaluation of Block Walls for High Energy Line Break Loads |
05000315/FIN-2012004-03 | 30 September 2012 23:59:59 | Cook | Design Basis of Seismic Category I Structures and Equipment |
05000361/FIN-2012007-07 | 30 June 2012 23:59:59 | San Onofre | Unit 3 Steam Generator 3E0-88 Stresses Related to Handling |
05000338/FIN-2011011-01 | 31 December 2011 23:59:59 | North Anna | Seismic Instrumentation Implementation |
05000361/FIN-2010006-04 | 30 June 2010 23:59:59 | San Onofre | Failure to Report Conditions That Could of Prevented Fulfillment of Safety Function |
05000254/FIN-2009003-02 | 30 June 2009 23:59:59 | Quad Cities | Inadequate Procedural Guidance for Shutdown After Operating Basis Earthquake |
05000315/FIN-2008003-01 | 30 June 2008 23:59:59 | Cook | Failure to Identify Unacceptable Interference Between the Unit 1 Safety Injection System Piping and the Remote Strainer Waterway in the Annulus |