Semantic search

Jump to navigation Jump to search
 Start dateSiteTitle
05000315/FIN-2018010-0130 September 2018 23:59:59CookRecord Retention Requirements of the Boron Injection Tank and its Associated Support Structure
05000282/FIN-2018011-0130 June 2018 23:59:59Prairie IslandFailure to Justify Load Combinations Used in Main Steam Piping Stress Analysis
05000397/FIN-2015003-0230 September 2015 23:59:59ColumbiaNon-Conservative Shutdown Criteria in Earthquake Abnormal Procedure
05000397/FIN-2015003-0130 September 2015 23:59:59ColumbiaFailure to Maintain Seismic Instrumentation Functional to Alert Plant Operators of Ground Motions Exceeding the Operating Basis Earthquake
05000272/FIN-2015002-0330 June 2015 23:59:59SalemInadequate Seismic EAL Scheme
05000346/FIN-2013010-0130 September 2014 23:59:59Davis Besse10 CFR 50.59 Safety Evaluation Not Performed for Calculated Component Damping
05000456/FIN-2014003-0130 June 2014 23:59:59BraidwoodIssues That Could Adversely Affect the UHS
05000528/FIN-2013004-0130 September 2013 23:59:59Palo VerdeFailure to Maintain an Effective Emergency Plan for a Seismic Event
05000254/FIN-2013003-0430 June 2013 23:59:59Quad CitiesQuestion Concerning Availability of Dam Following a Seismic Event
05000456/FIN-2012005-0431 December 2012 23:59:59BraidwoodOperability Evaluation of Block Walls for High Energy Line Break Loads
05000315/FIN-2012004-0330 September 2012 23:59:59CookDesign Basis of Seismic Category I Structures and Equipment
05000361/FIN-2012007-0730 June 2012 23:59:59San OnofreUnit 3 Steam Generator 3E0-88 Stresses Related to Handling
05000338/FIN-2011011-0131 December 2011 23:59:59North AnnaSeismic Instrumentation Implementation
05000361/FIN-2010006-0430 June 2010 23:59:59San OnofreFailure to Report Conditions That Could of Prevented Fulfillment of Safety Function
05000254/FIN-2009003-0230 June 2009 23:59:59Quad CitiesInadequate Procedural Guidance for Shutdown After Operating Basis Earthquake
05000315/FIN-2008003-0130 June 2008 23:59:59CookFailure to Identify Unacceptable Interference Between the Unit 1 Safety Injection System Piping and the Remote Strainer Waterway in the Annulus