Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000382/202200117 May 2022Reissue IR 05000382/2022001
W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.16 May 2022Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.
ML22125A27310 May 2022Transmittal of Final Waterford Steam Electric Station, Unit 3 Accident Sequence Precursor Report (Licensee Event Report 382-2021-001) (Letter)
ML22124A3068 May 2022Integrated Inspection Report 05000382/2022001
ML22122A1904 May 2022Final Accident Sequence Precursor Analysis - Waterford Steam Electric Station Loss of Offsite Power Due to Hurricane Ida (LER 382-2021-001) - Precursor
W3F1-2022-0009, Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors25 April 2022Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors
W3F1-2021-0003, Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B8 February 2021Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B
W3F1-2020-0047, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear Power Reactors18 December 2020Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear Power Reactors
ML20267A20926 August 202008 Draft Operating Test.Pdf
ML20267A21326 August 202008 Final Operating Test
ML20140A22219 May 2020Final ASP Analysis - Waterford (LER 382-95-002)
IR 05000382/202000124 April 2020Integrated Inspection Report 05000382/2020001 and Independent Spent Fuel Storage Inspection 07200075/2020001
IR 05000382/201900430 January 2020Integrated Inspection Report 05000382/2019004
ML19164A00128 June 2019Issuance of Amendment No. 254 Regarding Revision of Technical Specification 3/4.7.4, Ultimate Heat Sink,
W3F1-2018-0025, (Waterford 3) - Supplemental Information Supporting the License Amendment Request Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update17 May 2018(Waterford 3) - Supplemental Information Supporting the License Amendment Request Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update
W3F1-2018-0015, Report of Facility Changes, Tests and Experiments and Commitment Changes for Two Year Period Ending April 30, 201830 April 2018Report of Facility Changes, Tests and Experiments and Commitment Changes for Two Year Period Ending April 30, 2018
W3F1-2017-0050, License Amendment Request - Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update26 March 2018License Amendment Request - Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update
ML17174B19229 June 2017Summary of June 8, 2017, Category 1 Teleconference with Entergy Regarding Planned Request for Alternative Regarding High Pressure Safety Injection Pump for Waterford Steam Electric Station, Unit 3
W3F1-2017-0048, Relief Request from ASME Code Requirements for High Pressure Safety Injection (HPSI) Pump AB (SI-MPMP-0002AB) Testing Requirements, Relief Request PRR-WF3-2017-327 June 2017Relief Request from ASME Code Requirements for High Pressure Safety Injection (HPSI) Pump AB (SI-MPMP-0002AB) Testing Requirements, Relief Request PRR-WF3-2017-3
ML17158B1508 June 2017Meeting Slides for High Pressure Safety Injection Pump AB Pre-submittal Public Meeting Relief Request Per 50.55a(Z)(2)for Waterford Steam Electric Station, Unit 3
IR 05000382/201600310 November 2016NRC Integrated Inspection Report 05000382/2016003
ML16308A44719 October 2016Final ASP Program Analysis Precursor for Waterford Steam Electric Station, Unit 3 Re. Both Emergency Diesel Generators Declared Inoperable (LER 382-2015-007)
ML16256A31925 August 2016Revision 309 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Section 7.4
ML16256A48825 August 2016Revision 309 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Section 10.4
ML16256A49225 August 2016Revision 309 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Section 10.4.9A
ML16256A31825 August 2016Revision 309 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Section 7.3
ML16256A48525 August 2016Revision 309 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Section 10.3
W3F1-2016-0031, Notification of Full Compliance with EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigating Strategies for Beyond-Design-Basis External Events21 July 2016Notification of Full Compliance with EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigating Strategies for Beyond-Design-Basis External Events
W3F1-2016-0034, Response to NRC Request for Additional Information Regarding Request for Alternative to ASME OM Code Requirements for High Pressure Safety Injection (HPSI) Pump (Sl-MPMP-0002AB) Testing Requirements, PRR-WF3-226 May 2016Response to NRC Request for Additional Information Regarding Request for Alternative to ASME OM Code Requirements for High Pressure Safety Injection (HPSI) Pump (Sl-MPMP-0002AB) Testing Requirements, PRR-WF3-2
ML16117A04526 April 2016Request for Additional Information Regarding Request for Alternative to ASME OM Code Requirements for High Pressure Safety Injection Pump Testing
W3F1-2016-0012, License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 9 of 9)23 March 2016License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 9 of 9)
W3F1-2016-0021, Resubmittal of Sixth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events25 February 2016Resubmittal of Sixth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
W3F1-2016-0009, Sixth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events24 February 2016Sixth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
W3F1-2016-0003, Revised Licensing Actions and Implementation Items Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR)18 January 2016Revised Licensing Actions and Implementation Items Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR)
IR 05000382/201500312 November 2015IR 05000382/2015003; on 07/01/2015 - 09/30/2015; Waterford Steam Electric Station, Unit 3; Follow-up of Events and Notices of Enforcement Discretion
ML15272A3986 October 2015Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051
IR 05000382/201500830 September 2015IR 05000382/2015008; 08/10/2015 - 08/27/2015; Waterford Steam Electric Station, Unit 3; Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
W3F1-2015-0067, Fifth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events27 August 2015Fifth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
IR 05000382/201500230 July 2015IR 05000382/2015002; on 04/01/2015 - 06/30/2015; Waterford Steam Electric Station, Unit 3; Adverse Weather Protection, Problem Identification and Resolution
W3F1-2015-0025, Responses to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR) Waterford Steam Electric Station, Unit 3 (Waterford 3)14 May 2015Responses to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR) Waterford Steam Electric Station, Unit 3 (Waterford 3)
W3F1-2015-0021, Response to Request for Additional Information Regarding the Request to Permanently Extend the Integrated Leak Rate Test Frequency to 15 Years4 May 2015Response to Request for Additional Information Regarding the Request to Permanently Extend the Integrated Leak Rate Test Frequency to 15 Years
W3F1-2015-0015, Responses to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request12 March 2015Responses to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request
W3F1-2014-0025, Updated Responses to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR)11 June 2014Updated Responses to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR)
IR 05000382/20140028 May 2014IR 05000382-14-002, 01/01/2014 - 03/31/2014, Waterford, Unit 3, Integrated Inspection of Equipment Alignment, Maintenance Effectiveness, Operability Determinations and Functionality Assessments, and Problem Identification and Resolution
ML14129A35029 April 2014Report of Facility Changes, Tests and Experiments and Commitment Changes for Two Year Period Ending April 25, 2014
ML14035A0944 February 20142/4/2014 Waterford Steam Electric Station, Unit 3 - Meeting Slides - NFPA 805 LAR Supplement
IR 05000382/201300830 January 2014IR 05000382-13-008; on 05/20/13 - 12/19/13; Waterford Steam Electric Station, Unit 3; Surveillance Testing
W3F1-2013-0048, Supplement to NFPA 805 License Amendment Request (LAR)18 December 2013Supplement to NFPA 805 License Amendment Request (LAR)
IR 05000382/201300214 May 2013IR 05000382-13-002; 01/01/2013 - 03/31/2013; Waterford Steam Electric Station, Unit 3, Integrated Resident and Regional Report; Adverse Weather Protection, Operability Evaluations and Functionality Assessments, and Surveillance Testing
IR 05000382/201200514 February 2013IR 05000382-12-005; 10/01/2012 - 12/31/2012; Waterford Steam Electric Station, Unit 3, Integrated Resident and Regional Report; Radiological Hazard Assessment and Exposure Controls, Problem Identification and Resolution