Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23325A24513 November 2023Enclosure 2 - Dominion Slides
IR 05000395/20230904 October 2023NRC Inspection Report 05000395/2023090 and Preliminary Yellow Finding and Apparent Violation
IR 05000395/202300214 August 2023Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation
ML22236A11722 August 2022(Vcsns), Unit 1 - Response to an Apparent Violation (EA-22-039)
IR 05000395/202209014 July 2022NRC Inspection Report 05000395/2022090 and Preliminary White Finding and Apparent Violation
ML21211A08224 September 2021Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
ML21102A1279 April 2021(Vcsns), Unit 1 - Application for Technical Specification Change Regarding Risk Informed Justification for the Relocation of Specific Surveillance Frquency Requirements to Licensee-Controlled Program
ML20114E26312 May 2020Final ASP Analysis - Summer (LER 395-00-006)
ML19199A6966 September 2019Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluated Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic
ML19095A6534 April 2019NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information NFPA-805 Program Revisions LAR
ML19095A6584 March 2019NRR E-mail Capture - VC Summer SPRA Review - Clarification Questions on Peer Review Findings and Plant Modifications
IR 05000395/201800421 February 2019Reissued - Virgil C. Summer Nuclear Station, Unit 1 - Nuclear Regulatory Commission Integrated Inspection Report 05000395/2018004
ML19044A63413 February 2019Nuclear Regulatory Commission Integrated Inspection Report 05000395/2018004
RC-18-0091, License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions29 August 2018License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions
IR 05000395/201700730 November 2017NRC Design Bases Assurance Inspection (Team) Report No. 05000395/2017007
RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds30 October 2017Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds
RC-17-0019, Response to Request for Additional Information Regarding License Amendment Request LAR-15-01424, Implementation of WCAP-15376-P-A, Revision 16 February 2017Response to Request for Additional Information Regarding License Amendment Request LAR-15-01424, Implementation of WCAP-15376-P-A, Revision 1
IR 05000395/20160038 November 2016NRC Integrated Inspection Report 05000395/2016003
RC-16-0035, (VCSNS) Unit 1 - Exigent License Amendment Request - LAR (16-00848) Technical Specification Change Request for the Emergency Feedwater System Limiting Condition for Operation 3.7.1.2 Action B1 March 2016(VCSNS) Unit 1 - Exigent License Amendment Request - LAR (16-00848) Technical Specification Change Request for the Emergency Feedwater System Limiting Condition for Operation 3.7.1.2 Action B
RC-15-0025, License Amendment Request - LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis, Response to Request for Additional Information12 February 2015License Amendment Request - LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis, Response to Request for Additional Information
ML14311A1407 November 2014Final VC Summer Iepra Ror 10-10-2014.docx
IR 05000395/201400313 August 2014IR 05000395-14-003; on 04/01/2014 - 06/30/2014: Virgil C. Summer Nuclear Station, Unit 1; Problem Identification and Resolution, and Other Activities
IR 05000395/201300510 February 2014IR 05000395-13-005 & 05000395-13-502; 10/01/2013 - 12/31/2013: Virgil C. Summer Nuclear Station, Unit 1; Other Activities
RC-12-0142, License Amendment Request - LAR-06-00055, License Amendment Request to Adopt NFPA 805, Response to Request for Additional Information10 October 2012License Amendment Request - LAR-06-00055, License Amendment Request to Adopt NFPA 805, Response to Request for Additional Information
ML12202A02726 July 2012Request for Additional Information
ML12168A0018 June 2012NRR E-mail Capture - Draft RAIs on VC Summer NFPA-805 Review
ML11332A07715 November 2011License Amendment Request - LAR-06-00055 - License Amendment Request to Adopt NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition). Part 1 of 2
ML11321A17215 November 2011License Amendment Request - LAR-06-00055, and to Adopt NFPA 805 Performance - Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)
ML11332A07815 November 2011License Amendment Request - LAR-06-00055 - License Amendment Request to Adopt NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition). Part 2 of 2
RC-09-0134, Response to Request for Additional Information for Generic Letter 2004-0229 November 2009Response to Request for Additional Information for Generic Letter 2004-02
ML0930005735 November 2009Summary of September 14, 2009, Public Conference Call to Discuss Responses to Generic Letter 2004-02 Requests for Additional Information
ML0902709273 February 2009V.C. Summer Nuclear Station - Request for Additional Information for Generic Letter 2004-02
RC-08-0031, Supplemental Response to NRC Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors29 February 2008Supplemental Response to NRC Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
ML06038000321 February 2006RAI, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors.
ML05041009714 January 2005NRC Inspection Report 05000395/2005006; Preliminary White Finding
IR 05000395/200500614 January 2005EA-05-008, V. C. Summer, IR 05000395-05-006, Preliminary White Finding
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)
RC-02-0123, Application for Renewed Operating License, Appendix F Severe Accident Mitigation Alternatives6 August 2002Application for Renewed Operating License, Appendix F Severe Accident Mitigation Alternatives
ML20140H57910 December 1996Technical Evaluation Rept of IPE Submittal & RAI Responses for VC Summer Nuclear Station
RC-95-0232, Advises That Util Has Not Received Written Response to & Has Performed Addl Reviews of Issue of Spurious Closure of Valves XVG-8133A or B & Determeined That C/As Not Justified Considering Cost Vs Possible Safety Benefit19 September 1995Advises That Util Has Not Received Written Response to & Has Performed Addl Reviews of Issue of Spurious Closure of Valves XVG-8133A or B & Determeined That C/As Not Justified Considering Cost Vs Possible Safety Benefit