Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23325A245 | 13 November 2023 | Enclosure 2 - Dominion Slides |
IR 05000395/2023090 | 4 October 2023 | NRC Inspection Report 05000395/2023090 and Preliminary Yellow Finding and Apparent Violation |
IR 05000395/2023002 | 14 August 2023 | Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation |
ML22236A117 | 22 August 2022 | (Vcsns), Unit 1 - Response to an Apparent Violation (EA-22-039) |
IR 05000395/2022090 | 14 July 2022 | NRC Inspection Report 05000395/2022090 and Preliminary White Finding and Apparent Violation |
ML21211A082 | 24 September 2021 | Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
ML21102A127 | 9 April 2021 | (Vcsns), Unit 1 - Application for Technical Specification Change Regarding Risk Informed Justification for the Relocation of Specific Surveillance Frquency Requirements to Licensee-Controlled Program |
ML20114E263 | 12 May 2020 | Final ASP Analysis - Summer (LER 395-00-006) |
ML19199A696 | 6 September 2019 | Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluated Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic |
ML19095A653 | 4 April 2019 | NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information NFPA-805 Program Revisions LAR |
ML19095A658 | 4 March 2019 | NRR E-mail Capture - VC Summer SPRA Review - Clarification Questions on Peer Review Findings and Plant Modifications |
IR 05000395/2018004 | 21 February 2019 | Reissued - Virgil C. Summer Nuclear Station, Unit 1 - Nuclear Regulatory Commission Integrated Inspection Report 05000395/2018004 |
ML19044A634 | 13 February 2019 | Nuclear Regulatory Commission Integrated Inspection Report 05000395/2018004 |
RC-18-0091, License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions | 29 August 2018 | License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions |
IR 05000395/2017007 | 30 November 2017 | NRC Design Bases Assurance Inspection (Team) Report No. 05000395/2017007 |
RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds | 30 October 2017 | Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds |
RC-17-0019, Response to Request for Additional Information Regarding License Amendment Request LAR-15-01424, Implementation of WCAP-15376-P-A, Revision 1 | 6 February 2017 | Response to Request for Additional Information Regarding License Amendment Request LAR-15-01424, Implementation of WCAP-15376-P-A, Revision 1 |
IR 05000395/2016003 | 8 November 2016 | NRC Integrated Inspection Report 05000395/2016003 |
RC-16-0035, (VCSNS) Unit 1 - Exigent License Amendment Request - LAR (16-00848) Technical Specification Change Request for the Emergency Feedwater System Limiting Condition for Operation 3.7.1.2 Action B | 1 March 2016 | (VCSNS) Unit 1 - Exigent License Amendment Request - LAR (16-00848) Technical Specification Change Request for the Emergency Feedwater System Limiting Condition for Operation 3.7.1.2 Action B |
RC-15-0025, License Amendment Request - LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis, Response to Request for Additional Information | 12 February 2015 | License Amendment Request - LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis, Response to Request for Additional Information |
ML14311A140 | 7 November 2014 | Final VC Summer Iepra Ror 10-10-2014.docx |
IR 05000395/2014003 | 13 August 2014 | IR 05000395-14-003; on 04/01/2014 - 06/30/2014: Virgil C. Summer Nuclear Station, Unit 1; Problem Identification and Resolution, and Other Activities |
IR 05000395/2013005 | 10 February 2014 | IR 05000395-13-005 & 05000395-13-502; 10/01/2013 - 12/31/2013: Virgil C. Summer Nuclear Station, Unit 1; Other Activities |
RC-12-0142, License Amendment Request - LAR-06-00055, License Amendment Request to Adopt NFPA 805, Response to Request for Additional Information | 10 October 2012 | License Amendment Request - LAR-06-00055, License Amendment Request to Adopt NFPA 805, Response to Request for Additional Information |
ML12202A027 | 26 July 2012 | Request for Additional Information |
ML12168A001 | 8 June 2012 | NRR E-mail Capture - Draft RAIs on VC Summer NFPA-805 Review |
ML11332A077 | 15 November 2011 | License Amendment Request - LAR-06-00055 - License Amendment Request to Adopt NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition). Part 1 of 2 |
ML11321A172 | 15 November 2011 | License Amendment Request - LAR-06-00055, and to Adopt NFPA 805 Performance - Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) |
ML11332A078 | 15 November 2011 | License Amendment Request - LAR-06-00055 - License Amendment Request to Adopt NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition). Part 2 of 2 |
RC-09-0134, Response to Request for Additional Information for Generic Letter 2004-02 | 29 November 2009 | Response to Request for Additional Information for Generic Letter 2004-02 |
ML093000573 | 5 November 2009 | Summary of September 14, 2009, Public Conference Call to Discuss Responses to Generic Letter 2004-02 Requests for Additional Information |
ML090270927 | 3 February 2009 | V.C. Summer Nuclear Station - Request for Additional Information for Generic Letter 2004-02 |
RC-08-0031, Supplemental Response to NRC Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | 29 February 2008 | Supplemental Response to NRC Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
ML060380003 | 21 February 2006 | RAI, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors. |
ML050410097 | 14 January 2005 | NRC Inspection Report 05000395/2005006; Preliminary White Finding |
IR 05000395/2005006 | 14 January 2005 | EA-05-008, V. C. Summer, IR 05000395-05-006, Preliminary White Finding |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) |
ML023330457 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010) |
RC-02-0123, Application for Renewed Operating License, Appendix F Severe Accident Mitigation Alternatives | 6 August 2002 | Application for Renewed Operating License, Appendix F Severe Accident Mitigation Alternatives |
ML20140H579 | 10 December 1996 | Technical Evaluation Rept of IPE Submittal & RAI Responses for VC Summer Nuclear Station |
RC-95-0232, Advises That Util Has Not Received Written Response to & Has Performed Addl Reviews of Issue of Spurious Closure of Valves XVG-8133A or B & Determeined That C/As Not Justified Considering Cost Vs Possible Safety Benefit | 19 September 1995 | Advises That Util Has Not Received Written Response to & Has Performed Addl Reviews of Issue of Spurious Closure of Valves XVG-8133A or B & Determeined That C/As Not Justified Considering Cost Vs Possible Safety Benefit |