Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000498/2021001 | 7 May 2021 | Integrated Inspection Report 05000498/2021001 and 05000499/2021001 |
ML20311A392 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
ML20311A394 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
ML17019A002 | 11 July 2017 | Safety Evaluation, Enclosure 3 to Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 |
ML17038A223 | 11 July 2017 | Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 |
ML17019A003 | 11 July 2017 | Attachment 2 to Safety Evaluation - In-Vessel Thermal-Hydraulic Analysis, Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 |
NOC-AE-16003369, Applicability of Application Supplement 1 Correspondence to Supplement 2 to STP Risk-Informed GSI-191 Licensing Application | 9 June 2016 | Applicability of Application Supplement 1 Correspondence to Supplement 2 to STP Risk-Informed GSI-191 Licensing Application |
ML16091A005 | 1 March 2016 | NRR E-mail Capture - South Texas Project Units 1 & 2, Draft STP RAI Applicability Matrix for Review of GSI-191 |
ML15246A128 | 20 August 2015 | Attachment 1-5 Response to 2009 RAIs Through 1-6 Responses to Round 2 RAIs |
NOC-AE-15003267, Comment (1) of Wayne Harrison and Michael P. Murray on Draft Regulatory Guide DG-1322 - Risk-Informed Approach for Addressing the Effects of Debris on Post-Accident Long-Term Core Cooling | 24 June 2015 | Comment (1) of Wayne Harrison and Michael P. Murray on Draft Regulatory Guide DG-1322 - Risk-Informed Approach for Addressing the Effects of Debris on Post-Accident Long-Term Core Cooling |
NOC-AE-15003220, Description of Revised Risk-Informed Methodology and Responses to Round 2 Requests for Additional Information Regarding STP Risk-Informed GSI-191 Licensing Application | 25 March 2015 | Description of Revised Risk-Informed Methodology and Responses to Round 2 Requests for Additional Information Regarding STP Risk-Informed GSI-191 Licensing Application |
ML14357A171 | 3 March 2015 | Request for Additional Information, Round 2, Request for Exemptions and Revised Pilot License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (TAC Nos. MF2400 Through MF2409) |
IR 05000498/2014010 | 11 February 2015 | IR 05000498/2014010; 05000499/2014010; 11/17/2014 - 12/18/2014; South Texas Project Electric Generating Station, Units 1 and 2; Biennial Problem Identification and Resolution Report |
ML14322A923 | 18 November 2014 | NRR E-mail Capture - STP Risk-Informed Approach to Resolution of GSI-191 - Draft Request for Additional Information (Second Round) - TACs MF2400 and MF2401 |
NOC-AE-14003190, Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application | 30 October 2014 | Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application |
NOC-AE-14003105, Third Set of Responses to April, 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Licensing Application | 15 July 2014 | Third Set of Responses to April, 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Licensing Application |
ML14087A075 | 15 April 2014 | Request for Additional Information, Request for Exemptions and Revised Pilot License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 |
NOC-AE-13003043, Enclosure 5 - Response to NRC Supplemental Information Items | 13 November 2013 | Enclosure 5 - Response to NRC Supplemental Information Items |
ML13323A189 | 22 October 2013 | Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis |
NOC-AE-13003027, STPNOC South Texas Project Units 1 & 2 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Ord | 26 August 2013 | STPNOC South Texas Project Units 1 & 2 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Numb |
IR 05000498/2013003 | 30 July 2013 | IR 05000498-13-003 & 05000499-13-003; South Texas Project Electric Generating Station; 03/31/2013 - 06/29/2013; South Texas Project Unit 1 and 2; NRC Integrated Inspection Report |
ML13175A211 | 19 June 2013 | Project, Units 1 and 2, Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 |
ML13175A235 | 6 June 2013 | Project, Units 1 and 2, Enclosure 4-2 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 2 Probabilistic Risk Analysis, Page 1 of 256 Through Page 135 of 256 |
ML13140A269 | 20 May 2013 | NRC Slides for 5/23/13 Meeting Regarding Risk - Informed GSI-191 Pilot Application Initial Review Insights |
ML13087A517 | 12 April 2013 | Relief Request RR-ENG-3-09, Request for Relief from ASME Code Requirements; Deferral of Code Repair of Essential Cooling Water System Piping Until April 2013 Refueling Outage |
NOC-AE-13002963, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 28 February 2013 | Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
NOC-AE-12002898, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-09) | 16 October 2012 | Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-09) |
NOC-AE-12002807, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-08) | 12 March 2012 | Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-08) |
ML120620541 | 6 March 2012 | 2/9/12 Summary of Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Un |
ML120540667 | 22 February 2012 | Casa Grande Summary |
ML113120129 | 29 November 2011 | Summary of 11/1/11 Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance,Resolution Approach for South Texas, Un |
ML113050623 | 26 October 2011 | Alion- Expected Impact of Chemical Effects on GSI-191 Risk Informed Evaluation for South Texas Project |
ML112710033 | 28 September 2011 | ROP Tabletop Examples and Results |
NOC-AE-11002687, Response to Request for Additional Information for the South Texas Project License Renewal Application | 5 July 2011 | Response to Request for Additional Information for the South Texas Project License Renewal Application |
ML110320643 | 27 January 2011 | 1/27/11 Presentation on Risk-Informed GSI-191 Project Overview |
IR 05000498/2010004 | 2 November 2010 | IR 05000498-10-004, 05000499-10-004, on 09/30/10, South Texas Project Electric Generating Station, Units 1 and 2, Integrated Inspection |
ML102810345 | 13 October 2010 | 9/13/2010 Summary of Conference Call with STP Nuclear Operating Company to Discuss Request for Additional Information Responses for South Texas Project, Units 1 and 2 on Generic Letter 2004-02 |
ML100539588 | 12 March 2010 | Relief Request RR-ENG-2-52 from ASME Code, Section XI Requirements for Essential Cooling Water System Code Repair |
ML093410607 | 23 December 2009 | Request for Additional Information for Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
NOC-AE-09002491, Amended Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for the Essential Cooling Water System | 9 December 2009 | Amended Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for the Essential Cooling Water System |
NOC-AE-09002399, Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-52) | 12 March 2009 | Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-52) |
IR 05000498/2007007 | 13 February 2008 | IR 05000498-07-007 and 05000499-07-007; on 09/24/2007 - 01/22/2008; South Texas Project, Units 1 and 2; NRC Inspection Procedure 71111.21, Component Design Bases Inspection. |
ML061090754 | 25 May 2006 | Relief, Relief Request RR-ENG-2-39 and RR-ENG-2-40 for Approval of Temporary Non-code Repair and Deferral of Code Repair of Essential Cooling Water System Piping, Trains 1B and 1C |
ML060970240 | 12 May 2006 | Relief, RR-ENG-2-41 TAC No. MC8279 |
NOC-AE-06001994, Response to NRC Requests for Additional Information on STPNOC Proposed Risk-Informed Technical Specifications | 26 April 2006 | Response to NRC Requests for Additional Information on STPNOC Proposed Risk-Informed Technical Specifications |
ML060390246 | 9 February 2006 | Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactor. |
ML060130030 | 17 January 2006 | Enclosure 4: STP Rai'S and Responses to Summary of Meeting on December 14 & 15, 2005, with STP and Nei/Epri to Discuss Rmts I 4b |
NOC-AE-05001919, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Ecw Train 1A) | 8 September 2005 | Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Ecw Train 1A) |
NOC-AE-05001894, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Essential Cooling Water System (Ecw Train 1B) (Relief Request RR-ENG-2-39) | 19 July 2005 | Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Essential Cooling Water System (Ecw Train 1B) (Relief Request RR-ENG-2-39) |
NOC-AE-05001899, Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xl Requirements for the Essential Cooling Water System (Ecw Train 1 C) (Relief Request RR-ENG-2-40) | 19 July 2005 | Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xl Requirements for the Essential Cooling Water System (Ecw Train 1 C) (Relief Request RR-ENG-2-40) |