Semantic search

Jump to navigation Jump to search
 Issue dateTitle
RA-23-0064, Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval24 April 2023Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval
IR 05000261/20210023 August 2021Integrated Inspection Report 05000261/2021002
IR 05000261/202001121 December 2020Design Basis Assurance Inspection (Programs) Inspection Report 05000261/2020011
RA-19-0452, Seismic Probabilistic Risk Assessment (Spra), Response to March 12, 2012, Request for Information Regarding Recommendation 2.1: Seismic, of the Near-Term Task Force Related to the Fukushima Dai-ichi Accident12 December 2019Seismic Probabilistic Risk Assessment (Spra), Response to March 12, 2012, Request for Information Regarding Recommendation 2.1: Seismic, of the Near-Term Task Force Related to the Fukushima Dai-ichi Accident
RA-19-0154, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors6 May 2019Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors
RA-18-0194, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt TSTF-425, Revision 313 November 2018Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt TSTF-425, Revision 3
IR 05000261/20180018 May 2018Nuclear Regulatory Commission Integrated Inspection Report 05000261/2018001
IR 05000261/201700825 January 2018NRC Triennial Fire Protection Inspection Report 05000261/2017008
ML20311A4196 November 20172017 Q1-Q4 ROP Inspection Findings
RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report29 June 2017Submittal of Nine Day Inservice Inspection Summary Report
RNP-RA/16-0071, Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis20 September 2016Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis
RNP-RA/16-0038, Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-17425 May 2016Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174
RNP-RA/15-0053, Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04)19 August 2015Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04)
RNP-RA/15-0040, Completion of Required Actions for NRC Order EA-12-051 with Regard to Reliable Spent Fuel Pool Level Instrumentation27 June 2015Completion of Required Actions for NRC Order EA-12-051 with Regard to Reliable Spent Fuel Pool Level Instrumentation
RNP-RA/15-0021, Supplemental Response to 120-Day Response Submittal to Request for Additional Information Associated with License Amendment Request to Adopt National Fire Protection (NFPA) Standard 8051 April 2015Supplemental Response to 120-Day Response Submittal to Request for Additional Information Associated with License Amendment Request to Adopt National Fire Protection (NFPA) Standard 805
RNP-RA/14-0129, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.17 December 2014Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.
RNP-RA/14-0008, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)24 February 2014Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML13267A21230 September 2013Enclosure 1, Transition Report - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition
ML13262A06919 September 2013Final Significance Determination of White Finding EA-13-129, 2013009
ML13182A4281 July 2013IR 05000261-13-008, 01/01/2013 - 03/30/2013, Carolina Power and Light Company, H.B. Robinson Steam Electric Plant, Unit 2, Maintenance Effectiveness
IR 05000261/201200820 December 2012IR 05000261-12-008; 10/1 - 5/2012 and 10/15 - 19/2012; H.B. Robinson Steam Electric Plant, Unit 2; Triennial Fire Protection Inspection
IR 05000261/201100227 April 2011IR 05000261-11-002, Carolina Power and Light Company; on 01/01/2011 - 03/31/2011; H.B. Robinson Steam Electric Plant, Unit 2; Licensed Operator Requalification; Operability Evaluations
ML0603704608 February 2006Unit 2, Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors
RNP-RA/03-0142, Transmittal of Emergency Procedure Revisions19 November 2003Transmittal of Emergency Procedure Revisions
ML03274000930 September 2003Results of the Robinson SDP Phase 2 Notebook Benchmarking Visit, During June 2003
RNP-RA/03-0046, Transmittal of Emergency Procedure Revisions9 April 2003Transmittal of Emergency Procedure Revisions
RNP-RA/02-0180, Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives Analysis2 January 2003Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives Analysis
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)
RNP-RA/02-0100, Transmittal of Emergency Procedure Revisions3 July 2002Transmittal of Emergency Procedure Revisions
RNP-RA/01-0027, Transmittal of Emergency Procedure Revisions16 February 2001Transmittal of Emergency Procedure Revisions
RNP-RA/00-0204, Transmittal of Emergency Procedure Revision 6 to EPEOF-03, Revision 8 to EPNOT-01, Revision 2 to EPNOT-04, Revision 4 to EPOSC-02 and Revision 12 to EPPRO-0220 December 2000Transmittal of Emergency Procedure Revision 6 to EPEOF-03, Revision 8 to EPNOT-01, Revision 2 to EPNOT-04, Revision 4 to EPOSC-02 and Revision 12 to EPPRO-02
ML20038A57229 October 1981Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures PEP-2.6.16 Re Emergency Response manager,PEP-2.6.18 Re Technical Analysis & PEP-2.6.19 Re Radiological Control Manager