Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
RA-23-0064, Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval | 24 April 2023 | Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval |
IR 05000261/2021002 | 3 August 2021 | Integrated Inspection Report 05000261/2021002 |
IR 05000261/2020011 | 21 December 2020 | Design Basis Assurance Inspection (Programs) Inspection Report 05000261/2020011 |
RA-19-0452, Seismic Probabilistic Risk Assessment (Spra), Response to March 12, 2012, Request for Information Regarding Recommendation 2.1: Seismic, of the Near-Term Task Force Related to the Fukushima Dai-ichi Accident | 12 December 2019 | Seismic Probabilistic Risk Assessment (Spra), Response to March 12, 2012, Request for Information Regarding Recommendation 2.1: Seismic, of the Near-Term Task Force Related to the Fukushima Dai-ichi Accident |
RA-19-0154, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors | 6 May 2019 | Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors |
RA-18-0194, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt TSTF-425, Revision 3 | 13 November 2018 | Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt TSTF-425, Revision 3 |
IR 05000261/2018001 | 8 May 2018 | Nuclear Regulatory Commission Integrated Inspection Report 05000261/2018001 |
IR 05000261/2017008 | 25 January 2018 | NRC Triennial Fire Protection Inspection Report 05000261/2017008 |
ML20311A419 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report | 29 June 2017 | Submittal of Nine Day Inservice Inspection Summary Report |
RNP-RA/16-0071, Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis | 20 September 2016 | Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis |
RNP-RA/16-0038, Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174 | 25 May 2016 | Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174 |
RNP-RA/15-0053, Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04) | 19 August 2015 | Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04) |
RNP-RA/15-0040, Completion of Required Actions for NRC Order EA-12-051 with Regard to Reliable Spent Fuel Pool Level Instrumentation | 27 June 2015 | Completion of Required Actions for NRC Order EA-12-051 with Regard to Reliable Spent Fuel Pool Level Instrumentation |
RNP-RA/15-0021, Supplemental Response to 120-Day Response Submittal to Request for Additional Information Associated with License Amendment Request to Adopt National Fire Protection (NFPA) Standard 805 | 1 April 2015 | Supplemental Response to 120-Day Response Submittal to Request for Additional Information Associated with License Amendment Request to Adopt National Fire Protection (NFPA) Standard 805 |
RNP-RA/14-0129, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima. | 17 December 2014 | Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima. |
RNP-RA/14-0008, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 24 February 2014 | Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
ML13267A212 | 30 September 2013 | Enclosure 1, Transition Report - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition |
ML13262A069 | 19 September 2013 | Final Significance Determination of White Finding EA-13-129, 2013009 |
ML13182A428 | 1 July 2013 | IR 05000261-13-008, 01/01/2013 - 03/30/2013, Carolina Power and Light Company, H.B. Robinson Steam Electric Plant, Unit 2, Maintenance Effectiveness |
IR 05000261/2012008 | 20 December 2012 | IR 05000261-12-008; 10/1 - 5/2012 and 10/15 - 19/2012; H.B. Robinson Steam Electric Plant, Unit 2; Triennial Fire Protection Inspection |
IR 05000261/2011002 | 27 April 2011 | IR 05000261-11-002, Carolina Power and Light Company; on 01/01/2011 - 03/31/2011; H.B. Robinson Steam Electric Plant, Unit 2; Licensed Operator Requalification; Operability Evaluations |
ML060370460 | 8 February 2006 | Unit 2, Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors |
RNP-RA/03-0142, Transmittal of Emergency Procedure Revisions | 19 November 2003 | Transmittal of Emergency Procedure Revisions |
ML032740009 | 30 September 2003 | Results of the Robinson SDP Phase 2 Notebook Benchmarking Visit, During June 2003 |
RNP-RA/03-0046, Transmittal of Emergency Procedure Revisions | 9 April 2003 | Transmittal of Emergency Procedure Revisions |
RNP-RA/02-0180, Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives Analysis | 2 January 2003 | Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives Analysis |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) |
ML023330457 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010) |
RNP-RA/02-0100, Transmittal of Emergency Procedure Revisions | 3 July 2002 | Transmittal of Emergency Procedure Revisions |
RNP-RA/01-0027, Transmittal of Emergency Procedure Revisions | 16 February 2001 | Transmittal of Emergency Procedure Revisions |
RNP-RA/00-0204, Transmittal of Emergency Procedure Revision 6 to EPEOF-03, Revision 8 to EPNOT-01, Revision 2 to EPNOT-04, Revision 4 to EPOSC-02 and Revision 12 to EPPRO-02 | 20 December 2000 | Transmittal of Emergency Procedure Revision 6 to EPEOF-03, Revision 8 to EPNOT-01, Revision 2 to EPNOT-04, Revision 4 to EPOSC-02 and Revision 12 to EPPRO-02 |
ML20038A572 | 29 October 1981 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures PEP-2.6.16 Re Emergency Response manager,PEP-2.6.18 Re Technical Analysis & PEP-2.6.19 Re Radiological Control Manager |