Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000528/20230028 August 2023Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002
IR 05000528/202200430 January 2023Integrated Inspection Report 05000528/2022004 and 05000529/2022004 and 05000530/2022004
IR 05000520/20220025 August 2022Integrated Inspection Report 05000528/2022002 and 05000529/2022002 and 05000520/2022002
IR 05000528/20210047 February 2022Integrated Inspection Report 05000528/2021004, 05000529/2021004, and 05000530/2021004
IR 05000528/202000231 July 2020Integrated Inspection Report 05000528/2020002, 05000529/2020002, and 05000530/2020002
ML20114E31723 April 2020Final 10 CFR Part 21 Report for Masoneilan Model 8005N Transducer
IR 05000528/201800429 January 2019NRC Integrated Inspection Report 05000528/2018004, 05000529/2018004, and 05000530/2018004
IR 05000528/201800314 November 2018NRC Integrated Inspection Report 05000528/2018003, 05000529/2018003, and 05000530/2018003
IR 05000528/201800816 October 2018NRC Biennial Problem Identification and Resolution Inspection Report 05000528/2018008, 05000529/2018008, and 05000530/2018008
IR 05000528/20180026 August 2018NRC Integrated Inspection Report 05000528/2018002, 05000529/2018002, and 05000530/2018002
ML18138A48018 May 2018Response to Request for Additional Information for Risk-Informed Completion Times
ML18129A4489 May 2018APS Response to Request for Additional Information for License Amendment Request to Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components
IR 05000528/20180017 May 2018NRC Integrated Inspection Report 05000528/2018001, 05000529/2018001, and 05000530/2018001
ML17313B1598 January 2018Final Accident Sequence Precursor Analysis - Palo Verde Nuclear Generating Station (Unit 3), Emergency Diesel Generator Failure Resulting in a Condition Prohibited by Technical Specifications (LER 530-2016-002-01) - Precursor
ML17320A19315 November 2017NRC Public Meeting, Treatment of Mitigating Strategies in Risk Informed Decision Making
ML17307A1883 November 2017License Amendment Request Supplement for Risk-Informed Completion Times
ML17200D16219 July 2017License Amendment Request to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors
IR 05000528/201700810 April 2017NRC Special Inspection Report 05000528/2017008, 05000529/2017008 and 05000530/2017008
ML16365A24030 December 2016Emergency License Amendment Request to Extend Diesel Generator 3B Completion Time
ML16356A68921 December 2016Emergency License Amendment Request for a One-Time Extension of Diesel Generator Completion Time
ML16340A9881 December 2016Addendum to Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
IR 05000528/201500213 August 2015IR 05000528, 529, 530/2015002; 4/1/15-6/30/15; Palo Verde Units 1, 2 & 3 Integrated Inspection Report, Operability Determinations and Functionality Assessments; Problem Identification and Resolution and Follow-up of Events and Notices of En
ML15218A30031 July 2015License Amendment Request to Revise Technical Specifications to Adopt TSTF-505-A, Revision 1, Risk-Informed Completion Times
IR 05000528/201400412 November 2014IR 05000528/2014004, 05000529/2014004, and 05000530/2014004 on 07/01/2014 - 09/30/2014; Palo Verde Nuclear Generating Station; Operability Determinations/Functionality Assessments, and Component Design Basis Inspection
IR 05000528/201300915 April 2014IR 05000528-13-009, 05000529-13-009, 05000530-13-009; on 01/13 Through 04/02/2014; Palo Verde Nuclear Generating Station; Baseline Inspection, NRC Inspection Procedure 71111.21, Component Design Basis Inspection
ML13357A21818 December 2013Revision 2 to Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
IR 05000528/20130039 August 2013IR 05000528-13-003, 05000529-13-003, 05000530-13-003; 04/01/2013 - 06/30/2013; Palo Verde Nuclear Generating Station, Units 1, 2 & 3; Integrated Resident and Regional Report; Operability Evaluation, Identification & Resolution of Problems
CY-12-009, Closure Options for Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance16 May 2013Closure Options for Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance
IR 05000528/201200310 August 2012IR 05000528-12-003, 05000529-12-003 & 05000530-12-003, on 04/01/12 Through 06/30/12, Palo Verde Nuclear Generating Station, Units 1, 2, & 3
ML12229A1253 August 2012Request for Additional Information, Review of Single Failure Analysis of Low Pressure Safety Injection Pumps for Minimum Required Refueling Water Tank (RWT) Transfer Volume
ML12229A1193 August 2012Attachment 4, PVNGS Engineering Study 13-ES-A037, Revision 0, Fault Tree Analysis and Reliability Evaluation for Low Pressure Safety Injection (LPSI) Pump Trip at the Recirculation Actuation Signal (RAS)
IR 05000528/201100410 November 2011IR 05000528-11-004, 05000529-11-004, 05000530-11-004; 07/01/2011 - 09/30/2011; Palo Verde Nuclear Generating Station, Integrated Resident and Regional Report; Maint. Effect.; Op. Evals; and Ident. and Resolution of Problems
ML11271003328 September 2011ROP Tabletop Examples and Results
ML10356014931 January 2011NUREG-1437 Supplement 43, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Palo Verde Nuclear Generating Station, Final Report.
ML11007082228 January 2011Final Plant-Specific Supplement 43 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Palo Verde Nuclear Generating Station
ML10363072810 January 2011Letter Final Supplement 43 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Palo Verde Nuclear Generating Station
ML1036401686 January 2011Notice of Availability of the Final Plant-Specific Supplement 43 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Palo Verde Nuclear Generating Station
ML10218016731 August 2010NUREG-1437 Supplement 43, Dfc Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Palo Verde Nuclear Generating Station (Draft for Comment)
ML10188026324 June 2010Request for Additional Information Response on Request to Amend Technical Specification 3.8.7, Inverters - Operating, to Extend Completion Time for Restoration of an Inoperable Inverter
ML09323022510 November 2009Response to September 30, 2009, Request for Additional Information Regarding Severe Accident Mitigation Alternatives for the Review of the PVNGS License Renewal Application, and License Renewal Application Amendment No. 2
ML09281022728 September 2009Request to Amend Technical Specification (TS) 3.8.7, Inverters - Operating, to Extend Completion Time for Restoration of an Inoperable Inverter
IR 05000528/20090025 May 2009IR 05000528-09-002, 05000529-09-002 & 05000530-09-002 on 01/01/09 - 03/31/09 for Palo Verde
ML09083033413 March 2009Revision 1 to Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.
ML08343054916 December 2008Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors
IR 05000528/200800412 November 2008IR 05000528-08-004, 05000529-08-004, and 05000530-08-004 on 07/01/08 - 09/30/08 for Palo Verde
ML08071054629 February 2008Palo Verde Nuclear Generating Station (Pvngs), Units 1, 2, and 3, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactor
IR 05000528/20070054 February 2008IR 05000528-07-005, 05000529-07-005, 05000530-07-005 on 10/01/2007 - 12/31/2007 for Palo Verde, Units 1,2, & 3, Integrated Resident and Regional Report Maintenance Effectiveness, Operability Eval., Access Control to Radiological Areas, ALAR
IR 05000528/200700226 April 2007IR 050000528-07-002, 05000529-07-002, & 05000530-07-002; 01/01/2007 Through 03/31/2007; Palo Verde Nuclear Generating Stations, Units 1, 2, & 3, Integrated Inspection
ML06360017522 December 2006Final Significance Determination
IR 05000528/200601322 December 2006