Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML20309A734 | 8 October 2020 | 2 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML20309A729 | 8 October 2020 | 2 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML19126A030 | 28 June 2019 | Issuance of Amendments to Technical Specification 3.8.1, AC Sources-Operating |
ML20093E060 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 6 |
ML20093E620 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 9 |
RA-19-0004, Response to NRC for Additional Information (RAI) Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 for Catawba Nuclear Station, Units 1 and 2 | 7 March 2019 | Response to NRC for Additional Information (RAI) Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 for Catawba Nuclear Station, Units 1 and 2 |
RA-18-0229, Response to NRC Request for Additional Information Regarding License Amendment Request Proposing Changes to the Technical Specification 3.8.1 | 3 December 2018 | Response to NRC Request for Additional Information Regarding License Amendment Request Proposing Changes to the Technical Specification 3.8.1 |
ML16363A354 | 9 December 2016 | 54003-CALC-01, Evaluation of Risk Significance of Permanent ILRT Extension. |
ML16077A135 | 6 December 2016 | Issuance of Amendments Regarding National Fire Protection Association Standard NFPA 805 |
ML16104A078 | 20 June 2016 | Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 |
ML16004A352 | 3 February 2016 | Issuance of Amendment Request to Revise Technical Specification for Residual Heat Removal System Air Handler Unit 1 |
MNS-15-096, Final Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and with Order EA-12-051, Order to Modify.. | 7 December 2015 | Final Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and with Order EA-12-051, Order to Modify.. |
MNS-15-069, Duke Energy Carolinas, LLC (Duke Energy), McGuire Nuclear Station, Unit 1 - License Amendment Request for One-Time Change to Technical Specification 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating. | 28 August 2015 | Duke Energy Carolinas, LLC (Duke Energy), McGuire Nuclear Station, Unit 1 - License Amendment Request for One-Time Change to Technical Specification 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating. |
ML15191A025 | 30 June 2015 | License Amendment Request for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System (Nsws) Degraded Condition |
MNS-14-095, Response to August 28, 2014, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program | 12 December 2014 | Response to August 28, 2014, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program |
ML14203A326 | 15 September 2014 | William B. McGuire Nuclear Station, Units 1 and 2 - Report for the Onsite Audit of Areva Regarding Implementation of Reliable Spent Fuel Pool Instrumentation Related to Order EA-12-051 |
ML14085A065 | 24 April 2014 | NRC Staff Review of the Documentation Provided by Duke Energy Carolinas, LLC, for McGuire Concerning Resolution of Generic LTR 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressuriz |
MNS-14-023, Duke Energy Carolinas, LLC, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) | 27 February 2014 | Duke Energy Carolinas, LLC, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) |
ML13234A069 | 13 August 2013 | Relief Request Serial #13-MN-002, Risk-Informed Inservice Inspection Program Fourth Inservice Inspection Interval |
ML12297A341 | 18 October 2012 | Supplemental Information in Support of the NRC Acceptance Review of the License Amendment Request for a One-Time Change to Technical Specification 3.8.4, DC Sources-Operating, to Support Shared Vital Battery Replacement |
ML12229A146 | 9 August 2012 | License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement |
IR 05000369/2012007 | 25 July 2012 | IR 05000369-12-007, 05000370-12-007, on 03/05/2012 04/05/2012, McGuire Nuclear Station, Units 1 and 2, Component Design Bases Inspection |
ML12200A021 | 2 July 2012 | Final Responses to NRC Request for Additional Information (RAI) Related to Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents At... |
ML12100A024 | 28 March 2012 | Summary of Evaluations Performed Report Pursuant to 10 CFR 50.59; Changes, Tests, and Experiments |
ML102870100 | 30 September 2010 | Catawba Units 1 & 2, Draft Responses to NRC Request for Additional Information Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents on Pressurized-Water.... |
ML102640737 | 30 August 2010 | Initial Exam 2010-301 Final Ro/Sro Written Exam Working Copy |
ML102650109 | 30 August 2010 | Initial Exam 2010-301 Draft SRO Written Exam |
ML092730460 | 7 October 2009 | 09/01/2009 Summary of Conference Call with Duke Regarding Responses to Generic Letter (GL) 2004-02. Meeting Handouts |
ML083080350 | 18 November 2008 | Request for Additional Information (RAI) Regarding Supplemental Responses to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized |
ML081280488 | 30 April 2008 | Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. |
ML080730131 | 28 February 2008 | Response to Request for Additional Information on GL-04-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
ML073440386 | 25 October 2007 | Enclosure 3 - McGuire Nuclear Station Regulatory Conference - Foreign Material Found in the Unit 2 ECCS Sump |
ML060370427 | 9 February 2006 | Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-water Reactors (TAC MC4692 & MC4693) |
ML023330457 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010) |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) |
ML020350575 | 11 January 2002 | Relief Request 01-005 Request for Additional Information |
ML993550375 | 14 December 1999 | Revised Epips, Including Revision 16 to RP/0/A/5700/012, Revision 3 to SR/0/B/2000/003, Revision 2 to HP/0/B/1009/002 and Revised Indexes. with Letter Dated December 14, 1999 |
ML20101M067 | 30 June 1992 | Forwards Response to NRC 920421 Request for Addl Info Re Proposed Resolution of Generic Issue 130, Essential Svc Water Sys Failures at Multi-Unit Sites, as Part of Response to Generic Ltr 88-20 Re Individual Plant Exams |