Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML20309A7348 October 20202 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML20309A7298 October 20202 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features
ML19126A03028 June 2019Issuance of Amendments to Technical Specification 3.8.1, AC Sources-Operating
ML20093E06011 April 2019Updated Final Safety Analysis Report, Chapter 6
ML20093E62011 April 2019Updated Final Safety Analysis Report, Chapter 9
RA-19-0004, Response to NRC for Additional Information (RAI) Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 for Catawba Nuclear Station, Units 1 and 27 March 2019Response to NRC for Additional Information (RAI) Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 for Catawba Nuclear Station, Units 1 and 2
RA-18-0229, Response to NRC Request for Additional Information Regarding License Amendment Request Proposing Changes to the Technical Specification 3.8.13 December 2018Response to NRC Request for Additional Information Regarding License Amendment Request Proposing Changes to the Technical Specification 3.8.1
ML16363A3549 December 201654003-CALC-01, Evaluation of Risk Significance of Permanent ILRT Extension.
ML16077A1356 December 2016Issuance of Amendments Regarding National Fire Protection Association Standard NFPA 805
ML16104A07820 June 2016Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051
ML16004A3523 February 2016Issuance of Amendment Request to Revise Technical Specification for Residual Heat Removal System Air Handler Unit 1
MNS-15-096, Final Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and with Order EA-12-051, Order to Modify..7 December 2015Final Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and with Order EA-12-051, Order to Modify..
MNS-15-069, Duke Energy Carolinas, LLC (Duke Energy), McGuire Nuclear Station, Unit 1 - License Amendment Request for One-Time Change to Technical Specification 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating.28 August 2015Duke Energy Carolinas, LLC (Duke Energy), McGuire Nuclear Station, Unit 1 - License Amendment Request for One-Time Change to Technical Specification 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating.
ML15191A02530 June 2015License Amendment Request for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System (Nsws) Degraded Condition
MNS-14-095, Response to August 28, 2014, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program12 December 2014Response to August 28, 2014, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program
ML14203A32615 September 2014William B. McGuire Nuclear Station, Units 1 and 2 - Report for the Onsite Audit of Areva Regarding Implementation of Reliable Spent Fuel Pool Instrumentation Related to Order EA-12-051
ML14085A06524 April 2014NRC Staff Review of the Documentation Provided by Duke Energy Carolinas, LLC, for McGuire Concerning Resolution of Generic LTR 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressuriz
MNS-14-023, Duke Energy Carolinas, LLC, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)27 February 2014Duke Energy Carolinas, LLC, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)
ML13234A06913 August 2013Relief Request Serial #13-MN-002, Risk-Informed Inservice Inspection Program Fourth Inservice Inspection Interval
ML12297A34118 October 2012Supplemental Information in Support of the NRC Acceptance Review of the License Amendment Request for a One-Time Change to Technical Specification 3.8.4, DC Sources-Operating, to Support Shared Vital Battery Replacement
ML12229A1469 August 2012License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement
IR 05000369/201200725 July 2012IR 05000369-12-007, 05000370-12-007, on 03/05/2012 04/05/2012, McGuire Nuclear Station, Units 1 and 2, Component Design Bases Inspection
ML12200A0212 July 2012Final Responses to NRC Request for Additional Information (RAI) Related to Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents At...
ML12100A02428 March 2012Summary of Evaluations Performed Report Pursuant to 10 CFR 50.59; Changes, Tests, and Experiments
ML10287010030 September 2010Catawba Units 1 & 2, Draft Responses to NRC Request for Additional Information Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents on Pressurized-Water....
ML10264073730 August 2010Initial Exam 2010-301 Final Ro/Sro Written Exam Working Copy
ML10265010930 August 2010Initial Exam 2010-301 Draft SRO Written Exam
ML0927304607 October 200909/01/2009 Summary of Conference Call with Duke Regarding Responses to Generic Letter (GL) 2004-02. Meeting Handouts
ML08308035018 November 2008Request for Additional Information (RAI) Regarding Supplemental Responses to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized
ML08128048830 April 2008Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.
ML08073013128 February 2008Response to Request for Additional Information on GL-04-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
ML07344038625 October 2007Enclosure 3 - McGuire Nuclear Station Regulatory Conference - Foreign Material Found in the Unit 2 ECCS Sump
ML0603704279 February 2006Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-water Reactors (TAC MC4692 & MC4693)
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)
ML02035057511 January 2002Relief Request 01-005 Request for Additional Information
ML99355037514 December 1999Revised Epips, Including Revision 16 to RP/0/A/5700/012, Revision 3 to SR/0/B/2000/003, Revision 2 to HP/0/B/1009/002 and Revised Indexes. with Letter Dated December 14, 1999
ML20101M06730 June 1992Forwards Response to NRC 920421 Request for Addl Info Re Proposed Resolution of Generic Issue 130, Essential Svc Water Sys Failures at Multi-Unit Sites, as Part of Response to Generic Ltr 88-20 Re Individual Plant Exams