Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
LIC-15-0100, Updated Status of Generic Letter (GL) 2004-02 and Generic Safety Issue (GSI) 191, Pressurized Water Reactor Sump Performance | 4 January 2016 | Updated Status of Generic Letter (GL) 2004-02 and Generic Safety Issue (GSI) 191, Pressurized Water Reactor Sump Performance |
ML15225A319 | 7 July 2015 | NRR E-mail Capture - (External_Sender) Flood Protection at Fort Calhoun |
IR 05000285/2014004 | 13 November 2014 | IR 05000285/2014004; on 07/01/2014 - 09/30/2014; Fort Calhoun Station, Operability Determinations and Functionality Assessments, Plant Modifications |
ML14317A749 | 13 November 2014 | Response to Notice of Violation and NRC Inspection Report 05000285/2014009 |
ML14261A455 | 18 September 2014 | IR 05000285/2014009 and Notice of Violation, July 7 Through September 12, 2014, Fort Calhoun, NRC Confirmatory Action Letter Follow Up Inspection and Problem Identification and Resolution |
IR 05000285/2014009 | 18 September 2014 | IR 05000285/2014009 and Notice of Violation, July 7 Through September 12, 2014, Fort Calhoun, NRC Confirmatory Action Letter Follow Up Inspection and Problem Identification and Resolution |
ML14114A701 | 24 April 2014 | Task Interface Agreement - Concurrence on Fort Calhoun Tornado Missile Protection Licensing Basis (TIA 2013-07) |
ML14042A238 | 10 February 2014 | IR 05000285-13-019; on 11/16/2013 - 12/31/2013; Fort Calhoun Station, Integrated Resident and Regional Report; Annual Inspection of Operator Requalification Program; Emergency Plan Biennial; and IMC 0350 Confirmatory Action Letter Inspectio |
LIC-13-0148, Response to Request for Additional Information (RAI) for Fort Calhoun Station (FCS) Exigent License Amendment Request (LAR) to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Piping Outside of Containment | 15 October 2013 | Response to Request for Additional Information (RAI) for Fort Calhoun Station (FCS) Exigent License Amendment Request (LAR) to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Piping Outside of Containment |
LIC-13-0060, Omaha Public Power District - Remaining Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station | 21 May 2013 | Omaha Public Power District - Remaining Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station |
IR 05000285/2013003 | 10 May 2013 | IR 05000285-13-003, 02/17/2013 - 03/31/2013, Fort Calhoun Station, Integrated Resident and Regional Report |
ML11276A120 | 28 September 2011 | Enclosure 1 to LIC-11-0099, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) |
ML112000064 | 18 July 2011 | Final Significance Determination for a White Finding and Notice Violation, NRC Inspection Report 05000285-11-007 |
ML100150072 | 12 February 2010 | Request for Additional Information, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
IR 05000285/2009006 | 30 December 2009 | IR 05000285-09-006; August 24-28, 2009, and September 8-18, 2009; Fort Calhoun Station: Baseline Inspection, NRC Inspection Procedure 71111.21, Component Design Basis Inspection |
ML092150369 | 3 August 2009 | IR 2009003-09-003 on 04/01/09 -06/30/09 for Fort Calhoun |
LIC-08-0107, Notice of Completion of Corrective Actions Taken in Response to Generic Letter 2004-02 and Response to Request for Additional Information | 16 October 2008 | Notice of Completion of Corrective Actions Taken in Response to Generic Letter 2004-02 and Response to Request for Additional Information |
LIC-08-0021, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | 29 February 2008 | Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
ML072960170 | 31 October 2007 | Public Meeting Summary on the Reactor Oversight Process |
ML060380407 | 9 February 2006 | RAI Re Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors. |
ML060230461 | 26 January 2006 | Non-Proprietary Version: Fort Calhoun Station Pilot Plant Audit Report Analyses Required for the Response to Generic Letter 2004-02 and GSI-191 Resolution |
LIC-05-0101, Follow-up Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | 31 August 2005 | Follow-up Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
ML051050562 | 15 April 2005 | IR 05000285-05-010, on 08/20/2004 Through 02/24/2005 & NOV, Fort Calhoun Station. Operability Evaluation |
ML041350123 | 14 May 2004 | IR 05000285-04-002, on 01/01/04 Through 03/31/04, for Fort Calhoun Station, Fort Calhoun, Ne; Integrated Resident & Regional Report, Surveillance Testing, Problem Identification & Resolution |
IR 05000285/2003011 | 9 January 2004 | IR 05000285-03-011; 11/03 - 12/12/2003; Fort Calhoun Station; Evaluation of Changes, Tests, or Experiments, and Safety System Design and Performance Capability |
ML20134D794 | 13 June 1996 | Technical Evaluation Rept on Individual Plant Examination Front End Analysis |
ML20134D803 | 31 May 1996 | Technical Evaluation Rept on Individual Plant Examination Back-End Analysis |
LIC-95-0223, Forwards Response to Request for Addl Info to Assist Closure of NRC Staff Review of Individual Plant Exam Submittal | 30 November 1995 | Forwards Response to Request for Addl Info to Assist Closure of NRC Staff Review of Individual Plant Exam Submittal |
ML20092G077 | 6 September 1995 | Proposed Tech Spec 2.7,extending Allowed Outage Time from 7 Days Per Month to 7 Days W/ Addl Once Per Cycle 10 Day Allowed Outage Time |
ML20091G360 | 26 June 1995 | Proposed Tech Specs Re Extension of Allowed Outage Time for an Inoperable Low Pressure SI Pump |