Semantic search

Jump to navigation Jump to search
 Issue dateTitle
L-22-284, Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS)28 December 2022Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS)
ML20112F48812 May 2020Final ASP Analysis - Davis-Besse (LER 346-02-002)
L-20-119, Report of Facility Changes, Tests, and Experiments4 May 2020Report of Facility Changes, Tests, and Experiments
05000346/LER-2017-00227 November 2017Auxiliary Feed Water Pump Turbine Bearing Damaged due to Improperly Marked Lubricating Oil Sight Glass
LER 17-002-00 For Davis-Besse Nuclear Power Station, Unit 1, Regarding Auxiliary Feed Water Pump Turbine Bearing Damaged due to Improperly Marked Lubricating Oil Sight Glass
ML10362007628 December 20102005/12/31-NUREG/CR-6572, Rev. 1, BNL-NUREG-52534-R1, Kalinin VVER-1000 Nuclear Power Station Unit 1, PRA, Procedure Guides for a Probabilistic Risk Assessment
L-10-221, Enclosures to Davis-Besse, Unit 1, Letter L-10-221, License Renewal Application, Appendix E, Section 2.4 Through References E.1131 August 2010Enclosures to Davis-Besse, Unit 1, Letter L-10-221, License Renewal Application, Appendix E, Section 2.4 Through References E.11
ML08290060020 November 2008Issuance of Amendment 279 for the Conversion to the Improved TSs with Beyond Scope Issues
L-08-314, Nine Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.14 October 2008Nine Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.
ML0824902622 October 2008Draft Safety Evaluation for Conversion to ITS with Beyond Scope Issues, (TAC MD
L-08-224, Response to Request for Additional Information License Amendment Request to Convert Current Technical Specifications (CTS) to Improved Technical Specifications (Its), and Copy of Two Questions from NRC and Davis-Besse Its.3 September 2008Response to Request for Additional Information License Amendment Request to Convert Current Technical Specifications (CTS) to Improved Technical Specifications (Its), and Copy of Two Questions from NRC and Davis-Besse Its.
L-08-036, Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors28 February 2008Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors
IR 05000346/200600311 August 2006IR 05000346-06-003; Firstenergy Nuclear Operating Company;4/1/2006 - 6/30/2006; Davis-Besse Nuclear Power Station; Fire Protection, Surveillance Testing, Access Control to Radiologically Significant Areas, and Identification and Resolution
ML0603807259 February 2006Request for Additional Information, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-water Reactors
IR 05000346/20050091 February 2006IR 05000346-05-009, on 10/1/2005 - 12/31/2005; Davis-Besse Nuclear Power Station; Adverse Weather, Maintenance Effectiveness
ML05042002114 March 2005Davis-Besse - Final Accident Sequence Precursor Analysis of February 2002 Operational Condition
ML04153051326 May 2004Revised Minutes of Internal Meeting of the Davis-Besse Oversight Panel (Revised Attachment)
ML04148028825 May 2004Staff Restart Concerns Received Based on Requests
ML0409703082 April 2004Licensing Basis for Service Water System Discharge Flow Path
ML04107011530 March 2004Undated Draft Minutes of Internal Meeting of the Davis-Besse Oversight Panel, 02/18/04 Meeting
ML04083041722 March 2004Oversight Panel Restart Action Matrix Closures - Unresolved Inspection Items
ML04079003718 March 2004Minutes of Internal Meeting of the Davis-Besse Oversight Panel
ML0406800705 March 2004IR 05000346-03-010(DRS); 03/17/2003 - 01/07/2004; Davis-Besse Nucler Power Station; Corrective Action Program Implementation Effectiveness
ML04149006917 February 2004E-Mail from Grobe to Lipa, Davis Besse. Provides Answers, Comments, and Action Items Re Questions and Issues Raised in Caldwell e-mail Dated 02/17/2004
ML04027018111 February 2004Memo, Evaluation of Davis-Besse Modifications to the High Pressure Injection Pump and Associated Mock-Up Testing (TIA No. 2003-04, TAC No. MC0584)
ML04020019114 January 2004Evaluation of Davis Besse Modifications to the High Pressure Injection Pump and Associated Mock-Up Testing
ML0400500815 December 2003Response to the Preliminary Significance Determination for a Greater than Green Finding on the High Pressure Injection Pump Design Issue at the Davis-Besse Nuclear Power Station Serial Number 1-1339
ML03332042224 November 2003Minutes of Internal Meeting of the Davis-Besse Oversight Panel
ML03245057112 August 20032 Pm Transcript of Public Meeting Between NRC Oversight Panel and Firstenergy Nuclear Operating Company Davis-Besse Nuclear Power Station
ML20129D82123 February 1996Technical Evaluation Rept of IPE Submittal & RAI Responses for Davis-Besse Nuclear Power Station
ML20092E29611 September 1995Provides Response to Request for Addl Info on Individual Plant Exam Program for Davis-Besse Nuclear Power Station
ML20091S43131 August 1995USI A-46 Seismic Evaluation Rept. W/61 Oversize Drawings
ML20129D54831 December 1981Rev 1 to Auxiliary Feedwater Sys Reliability Analysis Final Rept
ML20039E17831 December 1981Auxiliary Feedwater Sys Reliability Analysis Final Rept, Prepared for Toledo Edison Co