Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
L-22-284, Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS) | 28 December 2022 | Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS) |
ML20112F488 | 12 May 2020 | Final ASP Analysis - Davis-Besse (LER 346-02-002) |
L-20-119, Report of Facility Changes, Tests, and Experiments | 4 May 2020 | Report of Facility Changes, Tests, and Experiments |
05000346/LER-2017-002 | 27 November 2017 | Auxiliary Feed Water Pump Turbine Bearing Damaged due to Improperly Marked Lubricating Oil Sight Glass LER 17-002-00 For Davis-Besse Nuclear Power Station, Unit 1, Regarding Auxiliary Feed Water Pump Turbine Bearing Damaged due to Improperly Marked Lubricating Oil Sight Glass |
ML103620076 | 28 December 2010 | 2005/12/31-NUREG/CR-6572, Rev. 1, BNL-NUREG-52534-R1, Kalinin VVER-1000 Nuclear Power Station Unit 1, PRA, Procedure Guides for a Probabilistic Risk Assessment |
L-10-221, Enclosures to Davis-Besse, Unit 1, Letter L-10-221, License Renewal Application, Appendix E, Section 2.4 Through References E.11 | 31 August 2010 | Enclosures to Davis-Besse, Unit 1, Letter L-10-221, License Renewal Application, Appendix E, Section 2.4 Through References E.11 |
ML082900600 | 20 November 2008 | Issuance of Amendment 279 for the Conversion to the Improved TSs with Beyond Scope Issues |
L-08-314, Nine Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | 14 October 2008 | Nine Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. |
ML082490262 | 2 October 2008 | Draft Safety Evaluation for Conversion to ITS with Beyond Scope Issues, (TAC MD |
L-08-224, Response to Request for Additional Information License Amendment Request to Convert Current Technical Specifications (CTS) to Improved Technical Specifications (Its), and Copy of Two Questions from NRC and Davis-Besse Its. | 3 September 2008 | Response to Request for Additional Information License Amendment Request to Convert Current Technical Specifications (CTS) to Improved Technical Specifications (Its), and Copy of Two Questions from NRC and Davis-Besse Its. |
L-08-036, Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors | 28 February 2008 | Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors |
IR 05000346/2006003 | 11 August 2006 | IR 05000346-06-003; Firstenergy Nuclear Operating Company;4/1/2006 - 6/30/2006; Davis-Besse Nuclear Power Station; Fire Protection, Surveillance Testing, Access Control to Radiologically Significant Areas, and Identification and Resolution |
ML060380725 | 9 February 2006 | Request for Additional Information, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-water Reactors |
IR 05000346/2005009 | 1 February 2006 | IR 05000346-05-009, on 10/1/2005 - 12/31/2005; Davis-Besse Nuclear Power Station; Adverse Weather, Maintenance Effectiveness |
ML050420021 | 14 March 2005 | Davis-Besse - Final Accident Sequence Precursor Analysis of February 2002 Operational Condition |
ML041530513 | 26 May 2004 | Revised Minutes of Internal Meeting of the Davis-Besse Oversight Panel (Revised Attachment) |
ML041480288 | 25 May 2004 | Staff Restart Concerns Received Based on Requests |
ML040970308 | 2 April 2004 | Licensing Basis for Service Water System Discharge Flow Path |
ML041070115 | 30 March 2004 | Undated Draft Minutes of Internal Meeting of the Davis-Besse Oversight Panel, 02/18/04 Meeting |
ML040830417 | 22 March 2004 | Oversight Panel Restart Action Matrix Closures - Unresolved Inspection Items |
ML040790037 | 18 March 2004 | Minutes of Internal Meeting of the Davis-Besse Oversight Panel |
ML040680070 | 5 March 2004 | IR 05000346-03-010(DRS); 03/17/2003 - 01/07/2004; Davis-Besse Nucler Power Station; Corrective Action Program Implementation Effectiveness |
ML041490069 | 17 February 2004 | E-Mail from Grobe to Lipa, Davis Besse. Provides Answers, Comments, and Action Items Re Questions and Issues Raised in Caldwell e-mail Dated 02/17/2004 |
ML040270181 | 11 February 2004 | Memo, Evaluation of Davis-Besse Modifications to the High Pressure Injection Pump and Associated Mock-Up Testing (TIA No. 2003-04, TAC No. MC0584) |
ML040200191 | 14 January 2004 | Evaluation of Davis Besse Modifications to the High Pressure Injection Pump and Associated Mock-Up Testing |
ML040050081 | 5 December 2003 | Response to the Preliminary Significance Determination for a Greater than Green Finding on the High Pressure Injection Pump Design Issue at the Davis-Besse Nuclear Power Station Serial Number 1-1339 |
ML033320422 | 24 November 2003 | Minutes of Internal Meeting of the Davis-Besse Oversight Panel |
ML032450571 | 12 August 2003 | 2 Pm Transcript of Public Meeting Between NRC Oversight Panel and Firstenergy Nuclear Operating Company Davis-Besse Nuclear Power Station |
ML20129D821 | 23 February 1996 | Technical Evaluation Rept of IPE Submittal & RAI Responses for Davis-Besse Nuclear Power Station |
ML20092E296 | 11 September 1995 | Provides Response to Request for Addl Info on Individual Plant Exam Program for Davis-Besse Nuclear Power Station |
ML20091S431 | 31 August 1995 | USI A-46 Seismic Evaluation Rept. W/61 Oversize Drawings |
ML20129D548 | 31 December 1981 | Rev 1 to Auxiliary Feedwater Sys Reliability Analysis Final Rept |
ML20039E178 | 31 December 1981 | Auxiliary Feedwater Sys Reliability Analysis Final Rept, Prepared for Toledo Edison Co |