 Issue dateTitle
IR 05000334/202200310 November 2022Integrated Inspection Report 05000334/2022003 and 05000412/2022003 and Independent Spent Fuel Storage Installation Inspection Report 07201043/2022001
ML22144A13118 May 20226 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Featres
ML22019A26527 January 2022Us NRC Staff Review of Documentation Provided by Firstenergy Nuclear Operating Co. for Beaver Valley, Units 1&2 Concerning Resolution of Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design B
ML21147A14627 May 2021Response to Request for Additional Information Regarding Generic Letter 2004-02
IR 05000334/202000412 February 2021Integrated Inspection Report 05000334/2020004 and 05000412/2020004
ML20311A6306 November 20172017 Q1-Q4 ROP Inspection Findings
ML17213A01711 May 2017Enclosure B: Beaver Valley, Unit 2, Seismic Probabilistic Risk Assessment in Response to 50.54(0 Letter with Regard to NTTF 2.1
ML17213A01611 May 2017Enclosure a: Beaver Valley, Units 1, Seismic Probabilistic Risk Assessment in Response to 50.54(f) Letter with Regard to NTTF 2.1
L-15-325, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 8056 November 2015Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805
L-15-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 80527 April 2015Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805
IR 05000412/201400715 January 2015IR 05000334/20114007 and 05000412/2014007, November 3, 2014 to December 4, 2014, Beaver Valley Power Station - NRC Component Design Bases
IR 05000334/201400715 January 2015IR 05000334/20114007 and 05000412/2014007, November 3, 2014 to December 4, 2014, Beaver Valley Power Station - NRC Component Design Bases
IR 05000334/201140015 January 2015IR 05000334/20114007 and 05000412/2014007, November 3, 2014 to December 4, 2014, Beaver Valley Power Station - NRC Component Design Bases
L-14-064, Supplemental Information Regarding Application for License Amendment to Adopt NFPA 805, Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)14 February 2014Supplemental Information Regarding Application for License Amendment to Adopt NFPA 805, Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)
L-10-115, Response to Request for Additional Information Related to Generic Letter 2004-0228 September 2010Response to Request for Additional Information Related to Generic Letter 2004-02
L-10-025, 10 CFR 503.55a Requests for Alternative Non-Destructive Examination Requirements for ASME Class 1 and Class 2 Piping Components10 June 201010 CFR 503.55a Requests for Alternative Non-Destructive Examination Requirements for ASME Class 1 and Class 2 Piping Components
ML10029031818 February 2010RAI, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors
L-09-152, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.30 June 2009Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.
L-09-056, Downstream Effects for Recirculation Spray System Pumps and Low Head Safety Injection System Pumps11 March 2009Downstream Effects for Recirculation Spray System Pumps and Low Head Safety Injection System Pumps
L-08-321, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors29 October 2008Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors
L-08-313, Nine Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling Decay Heat Removal, and Containment Spray Systems.14 October 2008Nine Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling Decay Heat Removal, and Containment Spray Systems.
IR 05000334/20080028 May 2008IR 05000334-08-002 and 05000412-08-002; on 01/01/2008 - 03/31/2008; Beaver Valley Power Station, Units 1 & 2; Identification and Resolution of Problems
L-08-081, Reply to Request for Additional Information Regarding Severe Accident Mitigation Alternatives License Renewal7 March 2008Reply to Request for Additional Information Regarding Severe Accident Mitigation Alternatives License Renewal
L-08-035, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized - Water Reactors29 February 2008Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized - Water Reactors
L-08-054, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Corrective Actions14 February 2008Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Corrective Actions
L-07-142, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Corrective Actions7 December 2007Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Corrective Actions
IR 05000334/20070029 May 2007IR 05000334-07-002 and 05000412-07-002, on 01/01/07 - 03/31/07, Beaver Valley, Units 1 and 2, Integrated Inspection Report
ML0603803429 February 2006Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors TAC Nos. MC4665 and MC4666
L-05-146, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.6 September 2005Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.
L-05-104, Probabilistic Safety Review for License Amendment Request Nos. 302 and 17314 June 2005Probabilistic Safety Review for License Amendment Request Nos. 302 and 173
L-05-013, Response to Request for Additional Information in Support of LAR Nos. 306 and 176 Emergency Diesel Generator Allowed Outage Time Extension18 January 2005Response to Request for Additional Information in Support of LAR Nos. 306 and 176 Emergency Diesel Generator Allowed Outage Time Extension
L-04-141, Response to Request for Additional Information in Support of LAR Nos. 306 and 176 Emergency Diesel Generator Allowed Outage Time Extension29 October 2004Response to Request for Additional Information in Support of LAR Nos. 306 and 176 Emergency Diesel Generator Allowed Outage Time Extension
IR 05000334/200400310 May 2004IR 05000334-04-003, IR 05000412-04-003, on 01/01/2004 - 03/31/2004, Beaver Valley Power Station Units 1 & 2; Routine Integrated Inspection Report
L-03-160, Response to a Request for Additional Information in Support of License Amendment Requests No. 18024 October 2003Response to a Request for Additional Information in Support of License Amendment Requests No. 180
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)
ML20211Q5797 September 1999Insp Rept 50-412/99-07 on 990720-29.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering
ML20129H30031 August 1995App a, TER on IPE Front End Analysis
ML20128F44131 August 1995TER on IPE Back-End Submittal
ML20118B23811 September 1992Forwards Response to NRC 920817 Request for Addl Info Re GL 88-20, IPE for Severe Accident Vulnerabilities