Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000334/2022003 | 10 November 2022 | Integrated Inspection Report 05000334/2022003 and 05000412/2022003 and Independent Spent Fuel Storage Installation Inspection Report 07201043/2022001 |
ML22144A131 | 18 May 2022 | 6 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Featres |
ML22019A265 | 27 January 2022 | Us NRC Staff Review of Documentation Provided by Firstenergy Nuclear Operating Co. for Beaver Valley, Units 1&2 Concerning Resolution of Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design B |
ML21147A146 | 27 May 2021 | Response to Request for Additional Information Regarding Generic Letter 2004-02 |
IR 05000334/2020004 | 12 February 2021 | Integrated Inspection Report 05000334/2020004 and 05000412/2020004 |
ML20311A630 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
ML17213A017 | 11 May 2017 | Enclosure B: Beaver Valley, Unit 2, Seismic Probabilistic Risk Assessment in Response to 50.54(0 Letter with Regard to NTTF 2.1 |
ML17213A016 | 11 May 2017 | Enclosure a: Beaver Valley, Units 1, Seismic Probabilistic Risk Assessment in Response to 50.54(f) Letter with Regard to NTTF 2.1 |
L-15-325, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 | 6 November 2015 | Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 |
L-15-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 | 27 April 2015 | Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 |
IR 05000412/2014007 | 15 January 2015 | IR 05000334/20114007 and 05000412/2014007, November 3, 2014 to December 4, 2014, Beaver Valley Power Station - NRC Component Design Bases |
IR 05000334/2014007 | 15 January 2015 | IR 05000334/20114007 and 05000412/2014007, November 3, 2014 to December 4, 2014, Beaver Valley Power Station - NRC Component Design Bases |
IR 05000334/2011400 | 15 January 2015 | IR 05000334/20114007 and 05000412/2014007, November 3, 2014 to December 4, 2014, Beaver Valley Power Station - NRC Component Design Bases |
L-14-064, Supplemental Information Regarding Application for License Amendment to Adopt NFPA 805, Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) | 14 February 2014 | Supplemental Information Regarding Application for License Amendment to Adopt NFPA 805, Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) |
L-10-115, Response to Request for Additional Information Related to Generic Letter 2004-02 | 28 September 2010 | Response to Request for Additional Information Related to Generic Letter 2004-02 |
L-10-025, 10 CFR 503.55a Requests for Alternative Non-Destructive Examination Requirements for ASME Class 1 and Class 2 Piping Components | 10 June 2010 | 10 CFR 503.55a Requests for Alternative Non-Destructive Examination Requirements for ASME Class 1 and Class 2 Piping Components |
ML100290318 | 18 February 2010 | RAI, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors |
L-09-152, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. | 30 June 2009 | Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. |
L-09-056, Downstream Effects for Recirculation Spray System Pumps and Low Head Safety Injection System Pumps | 11 March 2009 | Downstream Effects for Recirculation Spray System Pumps and Low Head Safety Injection System Pumps |
L-08-321, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors | 29 October 2008 | Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors |
L-08-313, Nine Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling Decay Heat Removal, and Containment Spray Systems. | 14 October 2008 | Nine Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling Decay Heat Removal, and Containment Spray Systems. |
IR 05000334/2008002 | 8 May 2008 | IR 05000334-08-002 and 05000412-08-002; on 01/01/2008 - 03/31/2008; Beaver Valley Power Station, Units 1 & 2; Identification and Resolution of Problems |
L-08-081, Reply to Request for Additional Information Regarding Severe Accident Mitigation Alternatives License Renewal | 7 March 2008 | Reply to Request for Additional Information Regarding Severe Accident Mitigation Alternatives License Renewal |
L-08-035, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized - Water Reactors | 29 February 2008 | Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized - Water Reactors |
L-08-054, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Corrective Actions | 14 February 2008 | Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Corrective Actions |
L-07-142, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Corrective Actions | 7 December 2007 | Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Corrective Actions |
IR 05000334/2007002 | 9 May 2007 | IR 05000334-07-002 and 05000412-07-002, on 01/01/07 - 03/31/07, Beaver Valley, Units 1 and 2, Integrated Inspection Report |
ML060380342 | 9 February 2006 | Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors TAC Nos. MC4665 and MC4666 |
L-05-146, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. | 6 September 2005 | Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. |
L-05-104, Probabilistic Safety Review for License Amendment Request Nos. 302 and 173 | 14 June 2005 | Probabilistic Safety Review for License Amendment Request Nos. 302 and 173 |
L-05-013, Response to Request for Additional Information in Support of LAR Nos. 306 and 176 Emergency Diesel Generator Allowed Outage Time Extension | 18 January 2005 | Response to Request for Additional Information in Support of LAR Nos. 306 and 176 Emergency Diesel Generator Allowed Outage Time Extension |
L-04-141, Response to Request for Additional Information in Support of LAR Nos. 306 and 176 Emergency Diesel Generator Allowed Outage Time Extension | 29 October 2004 | Response to Request for Additional Information in Support of LAR Nos. 306 and 176 Emergency Diesel Generator Allowed Outage Time Extension |
IR 05000334/2004003 | 10 May 2004 | IR 05000334-04-003, IR 05000412-04-003, on 01/01/2004 - 03/31/2004, Beaver Valley Power Station Units 1 & 2; Routine Integrated Inspection Report |
L-03-160, Response to a Request for Additional Information in Support of License Amendment Requests No. 180 | 24 October 2003 | Response to a Request for Additional Information in Support of License Amendment Requests No. 180 |
ML023330457 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010) |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) |
ML20211Q579 | 7 September 1999 | Insp Rept 50-412/99-07 on 990720-29.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering |
ML20129H300 | 31 August 1995 | App a, TER on IPE Front End Analysis |
ML20128F441 | 31 August 1995 | TER on IPE Back-End Submittal |
ML20118B238 | 11 September 1992 | Forwards Response to NRC 920817 Request for Addl Info Re GL 88-20, IPE for Severe Accident Vulnerabilities |