Issue date | Title | |
---|---|---|
IR 05000029/2002001 | 12 August 2002 | IR 05000029-02-001, on 07/07/02, Yankee Atomic Electric Company, to Determine Whether the Decommissioning Activities Carried Out at Yankee Rowe Facility Were Conducted Safely and in Accordance with NRC Requirements |
ML20211J511 | 31 August 1999 | Rev 29 to Yankee Decommissioning QA Program |
ML20209D488 | 9 July 1999 | Forwards Rev 29 to Decommissioning QA Program, for Info & NRC Approval,Iaw 10CFR50.54(a)(3).Attachment a Provides Listing of Changes,But Does Not Discuss All Refomatting, Grammatical,Editorial or Typographical Changes |
ML20209D539 | 22 June 1999 | Rev 29 to Yaec Decommissioning QA Program |
ML20154P969 | 16 October 1998 | Rev 28 to Yankee Atomic Electric Co Decommissioning QA Program |
BVY-97-124, Resubmits Rev 28 of YOQAP-I-A, Operational QA Program, Addressing Clarifications & Updates to QA Program.W/Summary of Changes & Marked Up Copy of Rev 27 | 1 October 1997 | Resubmits Rev 28 of YOQAP-I-A, Operational QA Program, Addressing Clarifications & Updates to QA Program.W/Summary of Changes & Marked Up Copy of Rev 27 |
ML20141E467 | 30 May 1997 | Rev 28 to Operational QA Program |
Information Notice 1991-32, Possible Flaws in Certain Piping Systems Fabricated by Associated Piping and Engineering | 15 May 1991 | Possible Flaws in Certain Piping Systems Fabricated by Associated Piping and Engineering |
Information Notice 1991-05, Intergranular Stress Corrosion Cracking in Pressurized Water Reactor Safety Injection Accumulator Nozzles | 30 January 1991 | Intergranular Stress Corrosion Cracking in Pressurized Water Reactor Safety Injection Accumulator Nozzles |
Information Notice 1990-29, Cracking of Cladding and Its Heat-Affected Zone in the Base Metal of a Reactor Vessel Head | 30 April 1990 | Cracking of Cladding and Its Heat-Affected Zone in the Base Metal of a Reactor Vessel Head |
Information Notice 1990-03, Malfunction of Borg-Warner Bolted Bonnet Check Valves Caused by Failure of the Swing Arm | 23 January 1990 | Malfunction of Borg-Warner Bolted Bonnet Check Valves Caused by Failure of the Swing Arm |
ML20248G829 | 2 October 1989 | Rev 19 to YOQAP-I-A, Operational QA Program |
ML20244B818 | 10 April 1989 | Inservice Insp Exam Rept for 881113-890117 |
ML20151Y261 | 29 April 1988 | Rev 18 to YOQAP-I-A, Operational QA Program |
Information Notice 1987-64, Conviction for Falsification of Security Training Records | 22 December 1987 | Conviction for Falsification of Security Training Records |
ML20239A092 | 30 September 1987 | Assessment of Benefits & Potential Impacts of Proposed Change to Expiration Date of Plant Ol |
ML20235C634 | 18 September 1987 | Inservice Insp Exam Rept for 851211-870703.Insps Constitute Completion of Exams Required by ASME Section XI & Util Inservice Insp Program for First Period of Third Interval |
ML20207J145 | 5 December 1986 | Rev 17 to YOQAP-I-A, Operational QA Program |
ML20141N765 | 6 February 1986 | Inservice Insp Rept for 851019-1211.One Half of Exams Required Tech Specs for First Period of Third Interval Completed & Identified in Rept |
Information Notice 1985-97, Jail Term for Former Contractor Employee Who Intentionally Falsified Welding Inspection Records, Attachment 1 to NRC Information Notice 1986-054 | 26 December 1985 | Jail Term for Former Contractor Employee Who Intentionally Falsified Welding Inspection Records, Attachment 1 to NRC Information Notice 1986-054 |
ML20136H790 | 31 October 1985 | Rev 16 to YOQAP-I-A, Operational QA Program |
ML20128E485 | 30 April 1985 | Rev 1 to Inservice Insp Rept on 840331-0609 |
Information Notice 1984-92, Cracking of Flywheels on Cummins Fire Pump Diesel Engines | 17 December 1984 | Cracking of Flywheels on Cummins Fire Pump Diesel Engines |