Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML20142A53721 May 20204 to Updated Final Safety Analysis Report, Section 10, Steam and Power Conversion System
ML20142A53121 May 20204 to Updated Final Safety Analysis Report, Section 3, Design of Structures, Components, Equipment and Systems
ML20142A53321 May 20204 to Updated Final Safety Analysis Report, Section 5, Reactor Coolant System & Connected Systems
ML20142A53021 May 20204 to Updated Final Safety Analysis Report, Section 1, Introduction & General Description of Plant
ML18334A14012 November 2018Revision 23 to Updated Final Safety Analysis Report, Section 10, Steam and Power Conversion System
ML18334A13012 November 2018Revision 23 to Updated Final Safety Analysis Report, Section 5, Reactor Coolant System and Connected Systems
ML18334A12412 November 2018Revision 23 to Updated Final Safety Analysis Report, Section 1, Introduction and General Description of Plant
LR-N18-0087, Submittal of Relief Request Associated with the Third Inservice Inspection (ISI) Interval24 September 2018Submittal of Relief Request Associated with the Third Inservice Inspection (ISI) Interval
LR-N17-0088, Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 5, Reactor Coolant System and Connected Systems9 May 2017Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 5, Reactor Coolant System and Connected Systems
LR-N17-0088, Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 1, Introduction and General Description of Plant9 May 2017Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 1, Introduction and General Description of Plant
LR-N17-0088, Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 10, Steam and Power Conversion System9 May 2017Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 10, Steam and Power Conversion System
LR-N17-0088, Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 3, Design of Structures, Components, Equipment and Systems, Sections 3.6 Through 3.119 May 2017Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 3, Design of Structures, Components, Equipment and Systems, Sections 3.6 Through 3.11
LR-N17-0088, Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 3, Design of Structures, Components, Equipment and Systems, Sections 3.1 Through 3.59 May 2017Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 3, Design of Structures, Components, Equipment and Systems, Sections 3.1 Through 3.5
ML17157B2439 May 2017Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 1, Introduction and General Description of Plant
ML17157B2449 May 2017Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 10, Steam and Power Conversion System
ML18044A0049 May 2017Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 3, Design of Structures, Components, Equipment and Systems, Sections 3.6 Through 3.11
ML18044A0059 May 2017Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 3, Design of Structures, Components, Equipment and Systems, Sections 3.1 Through 3.5
ML18044A0079 May 2017Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 9, Auxiliary Systems
ML17157B2589 May 2017Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 5, Reactor Coolant System and Connected Systems
IR 05000354/201300511 February 2014IR 05000354-13-005, October 1, 2013, Through December 31, 2013, Hope Creek, Unit 1, Integrated Inspection Report and Exercise of Enforcement Discretion
IR 05000354/201200310 August 2012IR 05000354-12-003; 04/01/2012 - 06/30/2012; Hope Creek Generating Station; Maintenance Effectiveness, Follow-Up of Events and Notices of Enforcement Discretion
LR-N09-0018, Relief Request RR-HC-I3R-04 Proposed Alternate Repair Method23 March 2009Relief Request RR-HC-I3R-04 Proposed Alternate Repair Method
LR-N08-0224, Attachment 6 - Hope Creek Final Stress Assessment of Hope Creek, Unit 1 Steam Dryer at 115% CLTP Conditions, C.D.I. Report No. 08-21NP, Revision 131 October 2008Attachment 6 - Hope Creek Final Stress Assessment of Hope Creek, Unit 1 Steam Dryer at 115% CLTP Conditions, C.D.I. Report No. 08-21NP, Revision 1
LR-N08-0199, Attachment 5 - C.D.I. Report.No. 08-29NP, Rev. 0, Final Stress Assessment of Hope Creek Unit 1 Steam Dryer at 111.5% CLTP Conditions.31 August 2008Attachment 5 - C.D.I. Report.No. 08-29NP, Rev. 0, Final Stress Assessment of Hope Creek Unit 1 Steam Dryer at 111.5% CLTP Conditions.
ML08081048317 April 2008Evaluation of Relief Request HC-RR-12-WO2
ML08042054431 January 2008CDI Report No. 07-17NP Revision 3 Stress Assessment of Hope Creek Unit 1 Steam Dryer Based on Revision 4 Loads Mode.
LR-N08-0033, CDI Report No. 07-17NP, Revision 4, Stress Assessment of Hope Creek Unit I Steam Dryer Based on Revision 4 Loads Model.31 January 2008CDI Report No. 07-17NP, Revision 4, Stress Assessment of Hope Creek Unit I Steam Dryer Based on Revision 4 Loads Model.
LR-N07-0282, Response to Request for Additional Information, Relief Request HC-RR-I2-W0230 October 2007Response to Request for Additional Information, Relief Request HC-RR-I2-W02
LR-N07-0276, Relief Request HC-RR-I2-W03 Proposed Alternative Repair Method24 October 2007Relief Request HC-RR-I2-W03 Proposed Alternative Repair Method
LR-N07-0273, Relief Request HC-RR-I2-W02, Proposed Alternative Repair Method19 October 2007Relief Request HC-RR-I2-W02, Proposed Alternative Repair Method
ML07264041131 August 2007CDI Report 07-17NP, Stress Assessment of Hope Creek, Unit 1 Steam Dryer Based on Revision 4 Loads Model Revision 2.
LR-N07-0171, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate3 August 2007Response to Request for Additional Information Request for License Amendment - Extended Power Uprate
IR 05000354/20070029 May 2007IR 05000354-07-002, on 01/01/2007 - 03/31/2007; Hope Creek Generating Station; Resident Inspector Integrated Report
ML07071032028 February 2007C.D.I. Report No. 06-27, Revision 2, Stress Analysis of the Hope Creek Unit 1 Steam Dryer at EPU Conditions Using 1/8th Scale Model Pressure Measurement Data.
ML06269004430 September 2006Attachment 21, C.D.I. Report No. 06-27, Rev 0, Stress Analysis of Hope Creek Unit 1 Steam Dryer at CLTP and EPU Conditions Using 1/8th Scale Model Pressure Measurement Data.
ML06268046430 September 2006Attachment 19, C.D.I. Report No. 06-24, Stress Analysis of Hope Creek Unit 1 Steam Dryer for CLTP, Rev 3.
LR-N06-0337, Inservice Inspection Activities - 90 Day Report, Thirteenth Refueling Outage8 August 2006Inservice Inspection Activities - 90 Day Report, Thirteenth Refueling Outage
IR 05000354/200600321 July 2006IR 05000354-06-003 on 04/01/2006 - 06/30/2006 for Hope Creek Generating Station; Maintenance Risk Assessments and Emergent Work Control, Refueling and Other Outage Activities, and Access Control to Radiologically Significant Areas
ML05320022730 November 2005Attachment 19, C.D.I. Report No. 05-25, Stress Analysis of the Hope Creek Unit 1 Steam Dryer for Cltp.
ML0509801735 April 2005PSEG Nuclear LLC Hope Creek Station B-Reactor Recirculation Decontamination Connection Leak Cause Determination Report Notification No. 20230319, Event Date: March 27. 2005
ML05006025230 December 2004Summary of Hope Creek Vibration Issues and Planned Actions
IR 05000354/200400213 May 2004IR 05000354-04-002, on 01/01/2004 - 03/31/2004, Public Service Electric Gas Nuclear LLC, Hope Creek Generating Station; Fire Protection, Maintenance Effectiveness, Operability Evaluations, Refueling and Other Activities
ML03241006521 August 2003Inservice Inspection Activities - 90 Day Report, Eleventh Refueling Outage
LR-N980574, Submits Response to RAI Re First 10-yr ISI Interval Requests for Relief for Plant.Attachment 1 Responds to Each RAI Item & Refers to Other Attachments,As Necessary,To Provide Responses.Attachment 2 Provides List of Acronyms Used15 December 1998Submits Response to RAI Re First 10-yr ISI Interval Requests for Relief for Plant.Attachment 1 Responds to Each RAI Item & Refers to Other Attachments,As Necessary,To Provide Responses.Attachment 2 Provides List of Acronyms Used
LR-N980231, Forwards Relief Requests Associated W/Changes Made to Repair Plan for Core Spray Nozzle Weld N5B.Info Requested by NRC in 980415 Telcon Included in Encl as Well28 July 1998Forwards Relief Requests Associated W/Changes Made to Repair Plan for Core Spray Nozzle Weld N5B.Info Requested by NRC in 980415 Telcon Included in Encl as Well
ML20216J39512 March 1998Forwards 90 Day Rept for ISI Activities Conducted at HCGS During Seventh Refueling Outage
ML20199D34313 November 1997Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support
LR-N970667, Requests Approval of Encl Repair Plan for Nozzle to Safe End Weld Associated W/Plant a Core Spray Loop.Action Necessary to Allow Repair of Through Wall Leak Discovered on Weld N5B on 9709199 October 1997Requests Approval of Encl Repair Plan for Nozzle to Safe End Weld Associated W/Plant a Core Spray Loop.Action Necessary to Allow Repair of Through Wall Leak Discovered on Weld N5B on 970919
ML20113B36710 June 1996Rev 0 to Outage ISI Exam Results (H1RFO 06,Rev 2) Completed Components First Interval,Third Period,Second Outage for May 1996
ML20080C60930 November 1994Monthly Operating Rept for Nov 1994 for Hope Creek Generating Station Unit 1