Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML20142A537 | 21 May 2020 | 4 to Updated Final Safety Analysis Report, Section 10, Steam and Power Conversion System |
ML20142A531 | 21 May 2020 | 4 to Updated Final Safety Analysis Report, Section 3, Design of Structures, Components, Equipment and Systems |
ML20142A533 | 21 May 2020 | 4 to Updated Final Safety Analysis Report, Section 5, Reactor Coolant System & Connected Systems |
ML20142A530 | 21 May 2020 | 4 to Updated Final Safety Analysis Report, Section 1, Introduction & General Description of Plant |
ML18334A140 | 12 November 2018 | Revision 23 to Updated Final Safety Analysis Report, Section 10, Steam and Power Conversion System |
ML18334A130 | 12 November 2018 | Revision 23 to Updated Final Safety Analysis Report, Section 5, Reactor Coolant System and Connected Systems |
ML18334A124 | 12 November 2018 | Revision 23 to Updated Final Safety Analysis Report, Section 1, Introduction and General Description of Plant |
LR-N18-0087, Submittal of Relief Request Associated with the Third Inservice Inspection (ISI) Interval | 24 September 2018 | Submittal of Relief Request Associated with the Third Inservice Inspection (ISI) Interval |
LR-N17-0088, Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 5, Reactor Coolant System and Connected Systems | 9 May 2017 | Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 5, Reactor Coolant System and Connected Systems |
LR-N17-0088, Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 1, Introduction and General Description of Plant | 9 May 2017 | Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 1, Introduction and General Description of Plant |
LR-N17-0088, Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 10, Steam and Power Conversion System | 9 May 2017 | Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 10, Steam and Power Conversion System |
LR-N17-0088, Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 3, Design of Structures, Components, Equipment and Systems, Sections 3.6 Through 3.11 | 9 May 2017 | Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 3, Design of Structures, Components, Equipment and Systems, Sections 3.6 Through 3.11 |
LR-N17-0088, Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 3, Design of Structures, Components, Equipment and Systems, Sections 3.1 Through 3.5 | 9 May 2017 | Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 3, Design of Structures, Components, Equipment and Systems, Sections 3.1 Through 3.5 |
ML17157B243 | 9 May 2017 | Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 1, Introduction and General Description of Plant |
ML17157B244 | 9 May 2017 | Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 10, Steam and Power Conversion System |
ML18044A004 | 9 May 2017 | Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 3, Design of Structures, Components, Equipment and Systems, Sections 3.6 Through 3.11 |
ML18044A005 | 9 May 2017 | Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 3, Design of Structures, Components, Equipment and Systems, Sections 3.1 Through 3.5 |
ML18044A007 | 9 May 2017 | Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 9, Auxiliary Systems |
ML17157B258 | 9 May 2017 | Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 5, Reactor Coolant System and Connected Systems |
IR 05000354/2013005 | 11 February 2014 | IR 05000354-13-005, October 1, 2013, Through December 31, 2013, Hope Creek, Unit 1, Integrated Inspection Report and Exercise of Enforcement Discretion |
IR 05000354/2012003 | 10 August 2012 | IR 05000354-12-003; 04/01/2012 - 06/30/2012; Hope Creek Generating Station; Maintenance Effectiveness, Follow-Up of Events and Notices of Enforcement Discretion |
LR-N09-0018, Relief Request RR-HC-I3R-04 Proposed Alternate Repair Method | 23 March 2009 | Relief Request RR-HC-I3R-04 Proposed Alternate Repair Method |
LR-N08-0224, Attachment 6 - Hope Creek Final Stress Assessment of Hope Creek, Unit 1 Steam Dryer at 115% CLTP Conditions, C.D.I. Report No. 08-21NP, Revision 1 | 31 October 2008 | Attachment 6 - Hope Creek Final Stress Assessment of Hope Creek, Unit 1 Steam Dryer at 115% CLTP Conditions, C.D.I. Report No. 08-21NP, Revision 1 |
LR-N08-0199, Attachment 5 - C.D.I. Report.No. 08-29NP, Rev. 0, Final Stress Assessment of Hope Creek Unit 1 Steam Dryer at 111.5% CLTP Conditions. | 31 August 2008 | Attachment 5 - C.D.I. Report.No. 08-29NP, Rev. 0, Final Stress Assessment of Hope Creek Unit 1 Steam Dryer at 111.5% CLTP Conditions. |
ML080810483 | 17 April 2008 | Evaluation of Relief Request HC-RR-12-WO2 |
ML080420544 | 31 January 2008 | CDI Report No. 07-17NP Revision 3 Stress Assessment of Hope Creek Unit 1 Steam Dryer Based on Revision 4 Loads Mode. |
LR-N08-0033, CDI Report No. 07-17NP, Revision 4, Stress Assessment of Hope Creek Unit I Steam Dryer Based on Revision 4 Loads Model. | 31 January 2008 | CDI Report No. 07-17NP, Revision 4, Stress Assessment of Hope Creek Unit I Steam Dryer Based on Revision 4 Loads Model. |
LR-N07-0282, Response to Request for Additional Information, Relief Request HC-RR-I2-W02 | 30 October 2007 | Response to Request for Additional Information, Relief Request HC-RR-I2-W02 |
LR-N07-0276, Relief Request HC-RR-I2-W03 Proposed Alternative Repair Method | 24 October 2007 | Relief Request HC-RR-I2-W03 Proposed Alternative Repair Method |
LR-N07-0273, Relief Request HC-RR-I2-W02, Proposed Alternative Repair Method | 19 October 2007 | Relief Request HC-RR-I2-W02, Proposed Alternative Repair Method |
ML072640411 | 31 August 2007 | CDI Report 07-17NP, Stress Assessment of Hope Creek, Unit 1 Steam Dryer Based on Revision 4 Loads Model Revision 2. |
LR-N07-0171, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate | 3 August 2007 | Response to Request for Additional Information Request for License Amendment - Extended Power Uprate |
IR 05000354/2007002 | 9 May 2007 | IR 05000354-07-002, on 01/01/2007 - 03/31/2007; Hope Creek Generating Station; Resident Inspector Integrated Report |
ML070710320 | 28 February 2007 | C.D.I. Report No. 06-27, Revision 2, Stress Analysis of the Hope Creek Unit 1 Steam Dryer at EPU Conditions Using 1/8th Scale Model Pressure Measurement Data. |
ML062690044 | 30 September 2006 | Attachment 21, C.D.I. Report No. 06-27, Rev 0, Stress Analysis of Hope Creek Unit 1 Steam Dryer at CLTP and EPU Conditions Using 1/8th Scale Model Pressure Measurement Data. |
ML062680464 | 30 September 2006 | Attachment 19, C.D.I. Report No. 06-24, Stress Analysis of Hope Creek Unit 1 Steam Dryer for CLTP, Rev 3. |
LR-N06-0337, Inservice Inspection Activities - 90 Day Report, Thirteenth Refueling Outage | 8 August 2006 | Inservice Inspection Activities - 90 Day Report, Thirteenth Refueling Outage |
IR 05000354/2006003 | 21 July 2006 | IR 05000354-06-003 on 04/01/2006 - 06/30/2006 for Hope Creek Generating Station; Maintenance Risk Assessments and Emergent Work Control, Refueling and Other Outage Activities, and Access Control to Radiologically Significant Areas |
ML053200227 | 30 November 2005 | Attachment 19, C.D.I. Report No. 05-25, Stress Analysis of the Hope Creek Unit 1 Steam Dryer for Cltp. |
ML050980173 | 5 April 2005 | PSEG Nuclear LLC Hope Creek Station B-Reactor Recirculation Decontamination Connection Leak Cause Determination Report Notification No. 20230319, Event Date: March 27. 2005 |
ML050060252 | 30 December 2004 | Summary of Hope Creek Vibration Issues and Planned Actions |
IR 05000354/2004002 | 13 May 2004 | IR 05000354-04-002, on 01/01/2004 - 03/31/2004, Public Service Electric Gas Nuclear LLC, Hope Creek Generating Station; Fire Protection, Maintenance Effectiveness, Operability Evaluations, Refueling and Other Activities |
ML032410065 | 21 August 2003 | Inservice Inspection Activities - 90 Day Report, Eleventh Refueling Outage |
LR-N980574, Submits Response to RAI Re First 10-yr ISI Interval Requests for Relief for Plant.Attachment 1 Responds to Each RAI Item & Refers to Other Attachments,As Necessary,To Provide Responses.Attachment 2 Provides List of Acronyms Used | 15 December 1998 | Submits Response to RAI Re First 10-yr ISI Interval Requests for Relief for Plant.Attachment 1 Responds to Each RAI Item & Refers to Other Attachments,As Necessary,To Provide Responses.Attachment 2 Provides List of Acronyms Used |
LR-N980231, Forwards Relief Requests Associated W/Changes Made to Repair Plan for Core Spray Nozzle Weld N5B.Info Requested by NRC in 980415 Telcon Included in Encl as Well | 28 July 1998 | Forwards Relief Requests Associated W/Changes Made to Repair Plan for Core Spray Nozzle Weld N5B.Info Requested by NRC in 980415 Telcon Included in Encl as Well |
ML20216J395 | 12 March 1998 | Forwards 90 Day Rept for ISI Activities Conducted at HCGS During Seventh Refueling Outage |
ML20199D343 | 13 November 1997 | Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support |
LR-N970667, Requests Approval of Encl Repair Plan for Nozzle to Safe End Weld Associated W/Plant a Core Spray Loop.Action Necessary to Allow Repair of Through Wall Leak Discovered on Weld N5B on 970919 | 9 October 1997 | Requests Approval of Encl Repair Plan for Nozzle to Safe End Weld Associated W/Plant a Core Spray Loop.Action Necessary to Allow Repair of Through Wall Leak Discovered on Weld N5B on 970919 |
ML20113B367 | 10 June 1996 | Rev 0 to Outage ISI Exam Results (H1RFO 06,Rev 2) Completed Components First Interval,Third Period,Second Outage for May 1996 |
ML20080C609 | 30 November 1994 | Monthly Operating Rept for Nov 1994 for Hope Creek Generating Station Unit 1 |