IR 05000285/201500230 July 2015IR 05000285/2015002; 4/01/2015 - 6/30/2015; Fort Calhoun Station, Integrated, Inservice Inspection Activities, EAL and Emergency Plan Changes, Follow-up of Events
IR 05000285/201100311 August 2011IR 05000285-11-003; 04/01/2011 06/30/2011; Fort Calhoun Station, Integrated Resident and Regional Report; Radiological Hazard Assessment and Exposure Controls, Surveillance Testing, Emergency Action Level and Emergency Plan Changes, Fire ..
ML0814100053 June 2008Summary of Conference Call with Omaha Public Power District (OPPD) Regarding OPPD Emergency Relief Request Submitted May 15, 2008 for Fort Calhoun Station (Tac No. MD8722)
LIC-08-0067, Response to Request for Additional Information Relief Request for Valve Replacement and Supplemental Information17 May 2008Response to Request for Additional Information Relief Request for Valve Replacement and Supplemental Information
LIC-08-0066, Request for Relief Pertaining to Liquid Penetrant Acceptance Criteria for Replacement Safety Injection and Refueling Water Tank (SIRWT) Outlet Header Level Control Valve15 May 2008Request for Relief Pertaining to Liquid Penetrant Acceptance Criteria for Replacement Safety Injection and Refueling Water Tank (SIRWT) Outlet Header Level Control Valve
IR 05000285/200601319 July 2006IR 05000285-06-013; 07200054-06-002; on 03/13/2006 - 05/05/2006, Omaha Public Power District, Fort Calhoun
IR 05000285/200601224 February 2006IR 05000285-06-012; IR 07200054-06-001 on 01/30/2006 Through 02/02/2006 for Omaha Public Power District; Fort Calhoun Station
ML0519600743 October 2005Relief Request - Alternative Test Requirements for Containment Repairs
IR 05000285/20050035 August 2005IR 05000285-05-003, on 04/01/2005 Through 06/30/2005 for Fort Calhoun Station, Integrated Resident and Regional Report and Occupational Radiation Safety
LIC-04-0093, Relief Request: Alternative Test Requirements for Containment Repairs11 October 2004Relief Request: Alternative Test Requirements for Containment Repairs
ML04197066415 July 2004Summary of Category 1 Meeting with Omaha Public Power District Re Significant Projects Planned for the Next Two Outages at the Fort Calhoun Station
LIC-04-0065, Revised Relief Request for Examinations with Less than 100% ASME Code Coverage for the Third 10-Year Interval20 May 2004Revised Relief Request for Examinations with Less than 100% ASME Code Coverage for the Third 10-Year Interval
IR 05000285/20030064 February 2004IR 05000285-03-006 on 09/21/2003 - 12/31/2003 for Fort Calhoun Station, Integrated Resident and Regional Report; Maintenance Rule Implementation, Nonroutine Evolutions and Events, Refueling Activities, Access Control, Event Followup
LIC-03-0150, Response to Generic Letter (GL) 2003-01, Control Room Habitability.5 December 2003Response to Generic Letter (GL) 2003-01, Control Room Habitability.
LIC-02-0106, Revised Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head Degradation & Vessel Head Penetration Nozzle Inspection Programs17 February 2003Revised Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head Degradation & Vessel Head Penetration Nozzle Inspection Programs
IR 05000285/200200226 July 2002IR 05000285-02-002, on 03/31-06/29/2002, Fort Calhoun, Integrated Resident & Regional Report; Refueling and Outage Activities
IR 05000285/199800724 May 1998Insp Rept 50-285/98-07 on 980415-24.Violations Noted.Major Areas Inspected:Operations & Maint
IR 05000285/19970132 October 1997Insp Rept 50-285/97-13 on 970630-0718.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering
ML20135D9514 December 1996Insp Rept 50-285/96-12 on 961015-1101.Violation Noted.Major Areas Inspected:Inservice Insp Program,Maint Program & Followup Insp Effort in Operations & Engineering Areas
ML20085M00815 June 1995Rev 2 to ISI Program Plan for 1993-2003 Interval
IR 05000285/199302230 November 1993Insp Rept 50-285/93-22 on 931004-08,18-22 & 1101-05.No Violations Noted.Major Areas Inspected:History & Matl Condition of SG Tubing to Assess Effectiveness of Licensee Programs in Detection & Analysis of Degraded Tubing
Information Notice 1991-32, Possible Flaws in Certain Piping Systems Fabricated by Associated Piping and Engineering15 May 1991Possible Flaws in Certain Piping Systems Fabricated by Associated Piping and Engineering
Information Notice 1991-05, Intergranular Stress Corrosion Cracking in Pressurized Water Reactor Safety Injection Accumulator Nozzles30 January 1991Intergranular Stress Corrosion Cracking in Pressurized Water Reactor Safety Injection Accumulator Nozzles
Information Notice 1990-29, Cracking of Cladding and Its Heat-Affected Zone in the Base Metal of a Reactor Vessel Head30 April 1990Cracking of Cladding and Its Heat-Affected Zone in the Base Metal of a Reactor Vessel Head
Information Notice 1990-03, Malfunction of Borg-Warner Bolted Bonnet Check Valves Caused by Failure of the Swing Arm23 January 1990Malfunction of Borg-Warner Bolted Bonnet Check Valves Caused by Failure of the Swing Arm
ML20206A2479 November 1988Notice of Violation from Insp on 881024-28.Violation Noted:Repair Instructions of Procedure Change 25571 to Mod MR-FC-81-51 Did Not Include Requirements for Performing Liquid Penetrant or Magnetic Particle Exam Prior to Repair
IR 05000285/19880402 November 1988Insp Rept 50-285/88-40 on 881024-28.Violation Noted.Major Areas Inspected:Welding & NDE Activities
IR 05000285/19880254 October 1988Ack Receipt of Responding to Questions Raised in Insp Rept 50-285/88-25
ML20207B84229 July 1988Forwards Relief Request from ASME Boiler & Pressure Vessel Code Section XI for Unidentified Longitudinal Weld Seams in Class 2 Piping,Two Circumferential Pipe to Pipe Shop Welds & Six Welds on 2 Inch Field Routed Pressurizer Minispray Line
ML20151L1841 July 1988Inservice Insp Program Plan for 1983-93 Interval
IR 05000285/198800626 February 1988Insp Rept 50-285/88-06 on 880111-15.No Violations or Deviations Noted.Major Areas Inspected:Control of Records & Documents,Procurement Controls & Receiving Insp of Purchased Matls & Components,Review of Inservice Insp Data & Records
Information Notice 1987-64, Conviction for Falsification of Security Training Records22 December 1987Conviction for Falsification of Security Training Records
ML20238D10831 August 1987Refueling Outage Inservice Insp Results for 1987
IR 05000285/198702326 August 1987Insp Rept 50-285/87-23 on 870727-31.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp in Accordance W/Section XI of ASME Boiler & Pressure Vessel Code
ML20154A28313 December 1986Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985
ML20210K74622 April 1986Forwards Attachments Omitted from Ltr LIC-86-169 Re 1985 Refueling Outage Inservice Insp Results
ML20155F03811 April 1986Refueling Outage Inservice Insp Results for 1985
ML20205N76320 March 1986Insp Rept 50-285/86-03 During Feb 1986.Violations Noted: Hourly Check of Nonfunctional Fire Barriers Not Performed & safety-related Fuel Oil Sys Modified W/O Approved Procedure
Information Notice 1985-97, Jail Term for Former Contractor Employee Who Intentionally Falsified Welding Inspection Records, Attachment 1 to NRC Information Notice 1986-05426 December 1985Jail Term for Former Contractor Employee Who Intentionally Falsified Welding Inspection Records, Attachment 1 to NRC Information Notice 1986-054
Information Notice 1984-92, Cracking of Flywheels on Cummins Fire Pump Diesel Engines17 December 1984Cracking of Flywheels on Cummins Fire Pump Diesel Engines
IR 05000285/198401824 October 1984Insp Rept 50-285/84-18 on 840801-0930.Violations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Testing,Maint Activities,Followup of Previously Identified Items & NRC Meetings
ML20093L94512 October 1984Inservice Insp Results for 1984
ML20093E1302 July 1984Provides Steps to Be Taken to Correct 820802 Response to IE Bulletin 82-02,Item 5.Info Documenting Util Compliance W/Reg Guide 1.65 Re Reactor Vessel Studs Encl
ML20107B12930 September 1983Inservice Insp Program Plan for 1983-1993 Interval
ML20082L70131 August 1983Inservice Insp Program Plan for 1980-1983 Period
ML20085K54530 August 1983Omaha Public Power District,Fort Calhoun Station,Unit 1 Inservice Insp Program Plan for 1983-93 Interval
ML20077D85911 July 1983Inservice Insp Rept Conducted During 821207-830407 by Swri. Describes NDE of Selected Components at Facility
ML20076K34324 June 1983Forwards Response to IE Bulletin 82-02,Action Item 4 Re Insp of RCPB Threaded Fasteners in PWR Plants Per ASME Code, Section Xi.No Major Corrosion Identified
ML20073Q85228 April 1983Revised Amend Application Re Heatup & Cooldown Curves.Amend Revises 830304 Amend Application
ML20067B67031 August 1982Inservice Insp Program Plan for 1980-1983