Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000285/2015002 | 30 July 2015 | IR 05000285/2015002; 4/01/2015 - 6/30/2015; Fort Calhoun Station, Integrated, Inservice Inspection Activities, EAL and Emergency Plan Changes, Follow-up of Events |
IR 05000285/2011003 | 11 August 2011 | IR 05000285-11-003; 04/01/2011 06/30/2011; Fort Calhoun Station, Integrated Resident and Regional Report; Radiological Hazard Assessment and Exposure Controls, Surveillance Testing, Emergency Action Level and Emergency Plan Changes, Fire .. |
ML081410005 | 3 June 2008 | Summary of Conference Call with Omaha Public Power District (OPPD) Regarding OPPD Emergency Relief Request Submitted May 15, 2008 for Fort Calhoun Station (Tac No. MD8722) |
LIC-08-0067, Response to Request for Additional Information Relief Request for Valve Replacement and Supplemental Information | 17 May 2008 | Response to Request for Additional Information Relief Request for Valve Replacement and Supplemental Information |
LIC-08-0066, Request for Relief Pertaining to Liquid Penetrant Acceptance Criteria for Replacement Safety Injection and Refueling Water Tank (SIRWT) Outlet Header Level Control Valve | 15 May 2008 | Request for Relief Pertaining to Liquid Penetrant Acceptance Criteria for Replacement Safety Injection and Refueling Water Tank (SIRWT) Outlet Header Level Control Valve |
IR 05000285/2006013 | 19 July 2006 | IR 05000285-06-013; 07200054-06-002; on 03/13/2006 - 05/05/2006, Omaha Public Power District, Fort Calhoun |
IR 05000285/2006012 | 24 February 2006 | IR 05000285-06-012; IR 07200054-06-001 on 01/30/2006 Through 02/02/2006 for Omaha Public Power District; Fort Calhoun Station |
ML051960074 | 3 October 2005 | Relief Request - Alternative Test Requirements for Containment Repairs |
IR 05000285/2005003 | 5 August 2005 | IR 05000285-05-003, on 04/01/2005 Through 06/30/2005 for Fort Calhoun Station, Integrated Resident and Regional Report and Occupational Radiation Safety |
LIC-04-0093, Relief Request: Alternative Test Requirements for Containment Repairs | 11 October 2004 | Relief Request: Alternative Test Requirements for Containment Repairs |
ML041970664 | 15 July 2004 | Summary of Category 1 Meeting with Omaha Public Power District Re Significant Projects Planned for the Next Two Outages at the Fort Calhoun Station |
LIC-04-0065, Revised Relief Request for Examinations with Less than 100% ASME Code Coverage for the Third 10-Year Interval | 20 May 2004 | Revised Relief Request for Examinations with Less than 100% ASME Code Coverage for the Third 10-Year Interval |
IR 05000285/2003006 | 4 February 2004 | IR 05000285-03-006 on 09/21/2003 - 12/31/2003 for Fort Calhoun Station, Integrated Resident and Regional Report; Maintenance Rule Implementation, Nonroutine Evolutions and Events, Refueling Activities, Access Control, Event Followup |
LIC-03-0150, Response to Generic Letter (GL) 2003-01, Control Room Habitability. | 5 December 2003 | Response to Generic Letter (GL) 2003-01, Control Room Habitability. |
LIC-02-0106, Revised Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head Degradation & Vessel Head Penetration Nozzle Inspection Programs | 17 February 2003 | Revised Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head Degradation & Vessel Head Penetration Nozzle Inspection Programs |
IR 05000285/2002002 | 26 July 2002 | IR 05000285-02-002, on 03/31-06/29/2002, Fort Calhoun, Integrated Resident & Regional Report; Refueling and Outage Activities |
IR 05000285/1998007 | 24 May 1998 | Insp Rept 50-285/98-07 on 980415-24.Violations Noted.Major Areas Inspected:Operations & Maint |
IR 05000285/1997013 | 2 October 1997 | Insp Rept 50-285/97-13 on 970630-0718.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering |
ML20135D951 | 4 December 1996 | Insp Rept 50-285/96-12 on 961015-1101.Violation Noted.Major Areas Inspected:Inservice Insp Program,Maint Program & Followup Insp Effort in Operations & Engineering Areas |
ML20085M008 | 15 June 1995 | Rev 2 to ISI Program Plan for 1993-2003 Interval |
IR 05000285/1993022 | 30 November 1993 | Insp Rept 50-285/93-22 on 931004-08,18-22 & 1101-05.No Violations Noted.Major Areas Inspected:History & Matl Condition of SG Tubing to Assess Effectiveness of Licensee Programs in Detection & Analysis of Degraded Tubing |
Information Notice 1991-32, Possible Flaws in Certain Piping Systems Fabricated by Associated Piping and Engineering | 15 May 1991 | Possible Flaws in Certain Piping Systems Fabricated by Associated Piping and Engineering |
Information Notice 1991-05, Intergranular Stress Corrosion Cracking in Pressurized Water Reactor Safety Injection Accumulator Nozzles | 30 January 1991 | Intergranular Stress Corrosion Cracking in Pressurized Water Reactor Safety Injection Accumulator Nozzles |
Information Notice 1990-29, Cracking of Cladding and Its Heat-Affected Zone in the Base Metal of a Reactor Vessel Head | 30 April 1990 | Cracking of Cladding and Its Heat-Affected Zone in the Base Metal of a Reactor Vessel Head |
Information Notice 1990-03, Malfunction of Borg-Warner Bolted Bonnet Check Valves Caused by Failure of the Swing Arm | 23 January 1990 | Malfunction of Borg-Warner Bolted Bonnet Check Valves Caused by Failure of the Swing Arm |
ML20206A247 | 9 November 1988 | Notice of Violation from Insp on 881024-28.Violation Noted:Repair Instructions of Procedure Change 25571 to Mod MR-FC-81-51 Did Not Include Requirements for Performing Liquid Penetrant or Magnetic Particle Exam Prior to Repair |
IR 05000285/1988040 | 2 November 1988 | Insp Rept 50-285/88-40 on 881024-28.Violation Noted.Major Areas Inspected:Welding & NDE Activities |
IR 05000285/1988025 | 4 October 1988 | Ack Receipt of Responding to Questions Raised in Insp Rept 50-285/88-25 |
ML20207B842 | 29 July 1988 | Forwards Relief Request from ASME Boiler & Pressure Vessel Code Section XI for Unidentified Longitudinal Weld Seams in Class 2 Piping,Two Circumferential Pipe to Pipe Shop Welds & Six Welds on 2 Inch Field Routed Pressurizer Minispray Line |
ML20151L184 | 1 July 1988 | Inservice Insp Program Plan for 1983-93 Interval |
IR 05000285/1988006 | 26 February 1988 | Insp Rept 50-285/88-06 on 880111-15.No Violations or Deviations Noted.Major Areas Inspected:Control of Records & Documents,Procurement Controls & Receiving Insp of Purchased Matls & Components,Review of Inservice Insp Data & Records |
Information Notice 1987-64, Conviction for Falsification of Security Training Records | 22 December 1987 | Conviction for Falsification of Security Training Records |
ML20238D108 | 31 August 1987 | Refueling Outage Inservice Insp Results for 1987 |
IR 05000285/1987023 | 26 August 1987 | Insp Rept 50-285/87-23 on 870727-31.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp in Accordance W/Section XI of ASME Boiler & Pressure Vessel Code |
ML20154A283 | 13 December 1986 | Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985 |
ML20210K746 | 22 April 1986 | Forwards Attachments Omitted from Ltr LIC-86-169 Re 1985 Refueling Outage Inservice Insp Results |
ML20155F038 | 11 April 1986 | Refueling Outage Inservice Insp Results for 1985 |
ML20205N763 | 20 March 1986 | Insp Rept 50-285/86-03 During Feb 1986.Violations Noted: Hourly Check of Nonfunctional Fire Barriers Not Performed & safety-related Fuel Oil Sys Modified W/O Approved Procedure |
Information Notice 1985-97, Jail Term for Former Contractor Employee Who Intentionally Falsified Welding Inspection Records, Attachment 1 to NRC Information Notice 1986-054 | 26 December 1985 | Jail Term for Former Contractor Employee Who Intentionally Falsified Welding Inspection Records, Attachment 1 to NRC Information Notice 1986-054 |
Information Notice 1984-92, Cracking of Flywheels on Cummins Fire Pump Diesel Engines | 17 December 1984 | Cracking of Flywheels on Cummins Fire Pump Diesel Engines |
IR 05000285/1984018 | 24 October 1984 | Insp Rept 50-285/84-18 on 840801-0930.Violations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Testing,Maint Activities,Followup of Previously Identified Items & NRC Meetings |
ML20093L945 | 12 October 1984 | Inservice Insp Results for 1984 |
ML20093E130 | 2 July 1984 | Provides Steps to Be Taken to Correct 820802 Response to IE Bulletin 82-02,Item 5.Info Documenting Util Compliance W/Reg Guide 1.65 Re Reactor Vessel Studs Encl |
ML20107B129 | 30 September 1983 | Inservice Insp Program Plan for 1983-1993 Interval |
ML20082L701 | 31 August 1983 | Inservice Insp Program Plan for 1980-1983 Period |
ML20085K545 | 30 August 1983 | Omaha Public Power District,Fort Calhoun Station,Unit 1 Inservice Insp Program Plan for 1983-93 Interval |
ML20077D859 | 11 July 1983 | Inservice Insp Rept Conducted During 821207-830407 by Swri. Describes NDE of Selected Components at Facility |
ML20076K343 | 24 June 1983 | Forwards Response to IE Bulletin 82-02,Action Item 4 Re Insp of RCPB Threaded Fasteners in PWR Plants Per ASME Code, Section Xi.No Major Corrosion Identified |
ML20073Q852 | 28 April 1983 | Revised Amend Application Re Heatup & Cooldown Curves.Amend Revises 830304 Amend Application |
ML20067B670 | 31 August 1982 | Inservice Insp Program Plan for 1980-1983 |