3F0320-01, NRC Commitment Change Report - March 2020 | 17 March 2020 | NRC Commitment Change Report - March 2020 |
ML17341A797 | 7 December 2017 | NRC Inspection Report No. 07201035/2017002, Duke Energy Florida, Inc., Crystal River Unit 3, Crystal River, Florida |
3F0817-03, Rev. 0, Defueled Safety Analysis Report | 31 August 2017 | Rev. 0, Defueled Safety Analysis Report |
IR 05000302/2011009 | 12 May 2011 | IR 05000302-11-009, on 01/01-04/22/2011; Crystal River Unit 3; Steam Generator Replacement Inspection |
ML101060347 | 9 April 2010 | 5.2.2.4.4. Quality Control and Nondestructive Testing |
ML102870274 | 6 February 2010 | 6.4 Rigid and Flexible Sleeves |
IR 05000302/2009005 | 25 January 2010 | IR 05000302-09-005; 10/01/2009 -12/31/2009; Crystal River Unit 3; Followup of Events and Notices of Enforcement Discretion |
ML102090387 | 7 January 2010 | Email from Saba, Farideh to Blount, Tom; Et Al; Cc Boyce, Tom (Nrr); Mozafari, Brenda; Paige, Jason; Orf, Tracy; Rosenberg, Stacey; Lupold, Timothy; Subject: Fyi |
ML101180263 | 5 January 2010 | E-Mail from Calloway to Ninh, Crystal River 2009005 Inspection Input |
ML102720391 | 2 November 2009 | Calculation S07-0033, Revision 0, NRC SIT Member Questions to Licensee (Request 43 Response Information, Document CR-N1002-500, Attachment H, Part 3 of 3 |
ML102730252 | 29 October 2009 | Williams Q&A - Request #3 Info-Pugh-PART 4 |
ML102720911 | 29 October 2009 | Williams Q&A - Request #3 Info-Pugh-PART 2 |
ML090820492 | 20 March 2009 | Submittal of Third Ten-Year Inservice Inspection Interval Relief Requests #09-001-11, #09-002-11 and #09-003-11 |
3F0108-08, Summary of Alloy 600/82/182 Pressurizer Butt Weld Mitigation and Closure of Confirmatory Action Letter No. NRR-07-016 | 24 January 2008 | Summary of Alloy 600/82/182 Pressurizer Butt Weld Mitigation and Closure of Confirmatory Action Letter No. NRR-07-016 |
3F0108-09, Summary of Ultrasonic Examination Results of Structural Weld Overlays | 23 January 2008 | Summary of Ultrasonic Examination Results of Structural Weld Overlays |
ML073030132 | 15 November 2007 | Relief Request #07-003-RR Regarding Structural Weld Overlays |
3F0704-11, 60-day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors | 26 July 2004 | 60-day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors |
IR 05000302/2004004 | 19 July 2004 | IR 05000302-04-004, on 03/28/04 Through 06/26/04, for Crystal River Unit 3; Event Followup |
IR 05000302/2003006 | 26 January 2004 | IR 05000302-03-006, on 12/27/03 - 12/27/03, Crystal River Unit 3 and Exercise for Enforcement Discretion |
3F1097-37, Provides Info Re Insp of High Pressure Injection/Makeup Line Nozzles at Crystal River Unit 3 as Identified in Item 31 of Attachment B to | 30 October 1997 | Provides Info Re Insp of High Pressure Injection/Makeup Line Nozzles at Crystal River Unit 3 as Identified in Item 31 of Attachment B to |
IR 05000302/1997013 | 16 October 1997 | Insp Rept 50-302/97-13 on 970817-0920.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support |
ML20210M573 | 11 August 1997 | Insp Rept 50-302/97-08 on 970608-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support |
ML20141D940 | 16 April 1997 | Summary Document for Pressurizer NDE Development for FPC Crystal River Unit 3 |
ML20141F699 | 6 March 1997 | Rev 5 to QCM-578, Rev Control & Status Sheet Mfg & Quality Control Plan |
ML20129H731 | 30 October 1996 | Insp Rept 50-302/96-11 on 960908-1005.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maintenance, & Plant Support |
ML20134C313 | 12 September 1996 | Insp Rept 50-302/96-08 on 960714-0810.Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support |
ML20134G210 | 19 August 1996 | Discusses Results of Facility Investigation of 940904-05, make-up Tank Evolutions & Unauthorized Tests Conducted While Being Licensed SRO at Plant.Facility Be Advised That Violations Noted May Change as Result of Further NRC Review |
ML20069M673 | 31 January 1994 | Exam of Crystal River Unit 3 SG Tube Sections, Final Rept |
ML20058G666 | 24 November 1993 | Summary of 930909 Meeting W/Licensee in Rockville,Md Re Results of Util Analysis of CR-3 SG Tubes Pulled During Last Outage.Attendees Listed in Encl 1 |
Information Notice 1991-32, Possible Flaws in Certain Piping Systems Fabricated by Associated Piping and Engineering | 15 May 1991 | Possible Flaws in Certain Piping Systems Fabricated by Associated Piping and Engineering |
Information Notice 1991-05, Intergranular Stress Corrosion Cracking in Pressurized Water Reactor Safety Injection Accumulator Nozzles | 30 January 1991 | Intergranular Stress Corrosion Cracking in Pressurized Water Reactor Safety Injection Accumulator Nozzles |
ML20059K658 | 4 September 1990 | 1990 Inservice Insp Summary Rept |
Information Notice 1990-29, Cracking of Cladding and Its Heat-Affected Zone in the Base Metal of a Reactor Vessel Head | 30 April 1990 | Cracking of Cladding and Its Heat-Affected Zone in the Base Metal of a Reactor Vessel Head |
Information Notice 1990-03, Malfunction of Borg-Warner Bolted Bonnet Check Valves Caused by Failure of the Swing Arm | 23 January 1990 | Malfunction of Borg-Warner Bolted Bonnet Check Valves Caused by Failure of the Swing Arm |
ML20245D770 | 12 June 1989 | Provides Clarification of & Addl Info to Util Re Decay Heat Pump/Low Pressure Injection Flow & Operating Duration Required Following Postulated Small Break LOCA |
05000302/LER-1989-009, Submits Justification for Restart of Plant as Committed to in LER 89-009.Based on Test & Insp Data,Util Has Determined That Continued Operation W/Existing DHR Pumps Will Not Pose Unresolved Safety Concerns | 30 May 1989 | Submits Justification for Restart of Plant as Committed to in LER 89-009.Based on Test & Insp Data,Util Has Determined That Continued Operation W/Existing DHR Pumps Will Not Pose Unresolved Safety Concerns |
ML20235H247 | 9 February 1989 | Rev 2 to Inservice Insp Repair & Replacement Program |
ML20196C450 | 9 February 1988 | Rev 1 to Inservice Insp Repair & Replacement Program |
Information Notice 1987-64, Conviction for Falsification of Security Training Records | 22 December 1987 | Conviction for Falsification of Security Training Records |
ML20206F956 | 8 April 1987 | Rev 0 to Inservice Insp Repair & Replacement Program, for Crystal River Unit 3 |
ML20154A283 | 13 December 1986 | Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985 |
Information Notice 1985-97, Jail Term for Former Contractor Employee Who Intentionally Falsified Welding Inspection Records, Attachment 1 to NRC Information Notice 1986-054 | 26 December 1985 | Jail Term for Former Contractor Employee Who Intentionally Falsified Welding Inspection Records, Attachment 1 to NRC Information Notice 1986-054 |
ML20128K297 | 30 May 1985 | Insp Rept 50-302/85-23 on 850513-17.No Violation Noted: Failure to Follow Welding Procedure Spec Requirements for Torch Shielding Gas Flow |
IR 05000302/1985017 | 28 May 1985 | Insp Rept 50-302/85-17 on 850402-05 & 15-19.Violation Noted: Control of Field Welding Not Clearly Defined |
Information Notice 1984-92, Cracking of Flywheels on Cummins Fire Pump Diesel Engines | 17 December 1984 | Cracking of Flywheels on Cummins Fire Pump Diesel Engines |
ML20092J884 | 22 June 1984 | Control of Heavy Loads (C-10),Crystal River Unit 3, Technical Evaluation Rept |
ML20072H563 | 25 March 1983 | Requests Specific Relief from ASME Boiler & Pressure Vessel Code Section XI Re Ultrasonic Exam of Reactor Vessel. Proposed Alternate Exams & Methods Encl.Class III License Amend Fee Encl |
ML20054G404 | 15 June 1982 | Forwards Crane Design Evaluation for Crystal River Unit 3: Comparison to NUREG-0612, in Response to NRC 820120 Request for Addl Info Re NUREG-0612, Control of Heavy Loads |
ML19323D481 | 30 April 1980 | Forwards Revised Response to IE Bulletin 79-17, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants. Insp of Three Sys Containing Referenced Piping Showed No Evidence of Cracking |
ML19296D471 | 28 February 1980 | 1979 Annual Operating Rept, Consisting of Info Re Production Facility Changes,Tests & Experiments,Reactor Vessel Matl Surveillance Capsules & Rept on Steam Generator Insp & Repair |