Semantic search

Jump to navigation Jump to search
 Issue dateTitle
3F0320-01, NRC Commitment Change Report - March 202017 March 2020NRC Commitment Change Report - March 2020
ML17341A7977 December 2017NRC Inspection Report No. 07201035/2017002, Duke Energy Florida, Inc., Crystal River Unit 3, Crystal River, Florida
3F0817-03, Rev. 0, Defueled Safety Analysis Report31 August 2017Rev. 0, Defueled Safety Analysis Report
IR 05000302/201100912 May 2011IR 05000302-11-009, on 01/01-04/22/2011; Crystal River Unit 3; Steam Generator Replacement Inspection
ML1010603479 April 20105.2.2.4.4. Quality Control and Nondestructive Testing
ML1028702746 February 20106.4 Rigid and Flexible Sleeves
IR 05000302/200900525 January 2010IR 05000302-09-005; 10/01/2009 -12/31/2009; Crystal River Unit 3; Followup of Events and Notices of Enforcement Discretion
ML1020903877 January 2010Email from Saba, Farideh to Blount, Tom; Et Al; Cc Boyce, Tom (Nrr); Mozafari, Brenda; Paige, Jason; Orf, Tracy; Rosenberg, Stacey; Lupold, Timothy; Subject: Fyi
ML1011802635 January 2010E-Mail from Calloway to Ninh, Crystal River 2009005 Inspection Input
ML1027203912 November 2009Calculation S07-0033, Revision 0, NRC SIT Member Questions to Licensee (Request 43 Response Information, Document CR-N1002-500, Attachment H, Part 3 of 3
ML10273025229 October 2009Williams Q&A - Request #3 Info-Pugh-PART 4
ML10272091129 October 2009Williams Q&A - Request #3 Info-Pugh-PART 2
ML09082049220 March 2009Submittal of Third Ten-Year Inservice Inspection Interval Relief Requests #09-001-11, #09-002-11 and #09-003-11
3F0108-08, Summary of Alloy 600/82/182 Pressurizer Butt Weld Mitigation and Closure of Confirmatory Action Letter No. NRR-07-01624 January 2008Summary of Alloy 600/82/182 Pressurizer Butt Weld Mitigation and Closure of Confirmatory Action Letter No. NRR-07-016
3F0108-09, Summary of Ultrasonic Examination Results of Structural Weld Overlays23 January 2008Summary of Ultrasonic Examination Results of Structural Weld Overlays
ML07303013215 November 2007Relief Request #07-003-RR Regarding Structural Weld Overlays
3F0704-11, 60-day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors26 July 200460-day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors
IR 05000302/200400419 July 2004IR 05000302-04-004, on 03/28/04 Through 06/26/04, for Crystal River Unit 3; Event Followup
IR 05000302/200300626 January 2004IR 05000302-03-006, on 12/27/03 - 12/27/03, Crystal River Unit 3 and Exercise for Enforcement Discretion
3F1097-37, Provides Info Re Insp of High Pressure Injection/Makeup Line Nozzles at Crystal River Unit 3 as Identified in Item 31 of Attachment B to30 October 1997Provides Info Re Insp of High Pressure Injection/Makeup Line Nozzles at Crystal River Unit 3 as Identified in Item 31 of Attachment B to
IR 05000302/199701316 October 1997Insp Rept 50-302/97-13 on 970817-0920.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support
ML20210M57311 August 1997Insp Rept 50-302/97-08 on 970608-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support
ML20141D94016 April 1997Summary Document for Pressurizer NDE Development for FPC Crystal River Unit 3
ML20141F6996 March 1997Rev 5 to QCM-578, Rev Control & Status Sheet Mfg & Quality Control Plan
ML20129H73130 October 1996Insp Rept 50-302/96-11 on 960908-1005.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maintenance, & Plant Support
ML20134C31312 September 1996Insp Rept 50-302/96-08 on 960714-0810.Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support
ML20134G21019 August 1996Discusses Results of Facility Investigation of 940904-05, make-up Tank Evolutions & Unauthorized Tests Conducted While Being Licensed SRO at Plant.Facility Be Advised That Violations Noted May Change as Result of Further NRC Review
ML20069M67331 January 1994Exam of Crystal River Unit 3 SG Tube Sections, Final Rept
ML20058G66624 November 1993Summary of 930909 Meeting W/Licensee in Rockville,Md Re Results of Util Analysis of CR-3 SG Tubes Pulled During Last Outage.Attendees Listed in Encl 1
Information Notice 1991-32, Possible Flaws in Certain Piping Systems Fabricated by Associated Piping and Engineering15 May 1991Possible Flaws in Certain Piping Systems Fabricated by Associated Piping and Engineering
Information Notice 1991-05, Intergranular Stress Corrosion Cracking in Pressurized Water Reactor Safety Injection Accumulator Nozzles30 January 1991Intergranular Stress Corrosion Cracking in Pressurized Water Reactor Safety Injection Accumulator Nozzles
ML20059K6584 September 19901990 Inservice Insp Summary Rept
Information Notice 1990-29, Cracking of Cladding and Its Heat-Affected Zone in the Base Metal of a Reactor Vessel Head30 April 1990Cracking of Cladding and Its Heat-Affected Zone in the Base Metal of a Reactor Vessel Head
Information Notice 1990-03, Malfunction of Borg-Warner Bolted Bonnet Check Valves Caused by Failure of the Swing Arm23 January 1990Malfunction of Borg-Warner Bolted Bonnet Check Valves Caused by Failure of the Swing Arm
ML20245D77012 June 1989Provides Clarification of & Addl Info to Util Re Decay Heat Pump/Low Pressure Injection Flow & Operating Duration Required Following Postulated Small Break LOCA
05000302/LER-1989-009, Submits Justification for Restart of Plant as Committed to in LER 89-009.Based on Test & Insp Data,Util Has Determined That Continued Operation W/Existing DHR Pumps Will Not Pose Unresolved Safety Concerns30 May 1989Submits Justification for Restart of Plant as Committed to in LER 89-009.Based on Test & Insp Data,Util Has Determined That Continued Operation W/Existing DHR Pumps Will Not Pose Unresolved Safety Concerns
ML20235H2479 February 1989Rev 2 to Inservice Insp Repair & Replacement Program
ML20196C4509 February 1988Rev 1 to Inservice Insp Repair & Replacement Program
Information Notice 1987-64, Conviction for Falsification of Security Training Records22 December 1987Conviction for Falsification of Security Training Records
ML20206F9568 April 1987Rev 0 to Inservice Insp Repair & Replacement Program, for Crystal River Unit 3
ML20154A28313 December 1986Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985
Information Notice 1985-97, Jail Term for Former Contractor Employee Who Intentionally Falsified Welding Inspection Records, Attachment 1 to NRC Information Notice 1986-05426 December 1985Jail Term for Former Contractor Employee Who Intentionally Falsified Welding Inspection Records, Attachment 1 to NRC Information Notice 1986-054
ML20128K29730 May 1985Insp Rept 50-302/85-23 on 850513-17.No Violation Noted: Failure to Follow Welding Procedure Spec Requirements for Torch Shielding Gas Flow
IR 05000302/198501728 May 1985Insp Rept 50-302/85-17 on 850402-05 & 15-19.Violation Noted: Control of Field Welding Not Clearly Defined
Information Notice 1984-92, Cracking of Flywheels on Cummins Fire Pump Diesel Engines17 December 1984Cracking of Flywheels on Cummins Fire Pump Diesel Engines
ML20092J88422 June 1984Control of Heavy Loads (C-10),Crystal River Unit 3, Technical Evaluation Rept
ML20072H56325 March 1983Requests Specific Relief from ASME Boiler & Pressure Vessel Code Section XI Re Ultrasonic Exam of Reactor Vessel. Proposed Alternate Exams & Methods Encl.Class III License Amend Fee Encl
ML20054G40415 June 1982Forwards Crane Design Evaluation for Crystal River Unit 3: Comparison to NUREG-0612, in Response to NRC 820120 Request for Addl Info Re NUREG-0612, Control of Heavy Loads
ML19323D48130 April 1980Forwards Revised Response to IE Bulletin 79-17, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants. Insp of Three Sys Containing Referenced Piping Showed No Evidence of Cracking
ML19296D47128 February 19801979 Annual Operating Rept, Consisting of Info Re Production Facility Changes,Tests & Experiments,Reactor Vessel Matl Surveillance Capsules & Rept on Steam Generator Insp & Repair